349
Views
38
CrossRef citations to date
0
Altmetric
Original Articles

A new earthworks estimating methodology

Pages 219-228 | Published online: 21 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Mehrnaz Mohtasham, Hossein Mirzaei-Nasirabad, Hooman Askari-Nasab & Behrooz Alizadeh. (2022) Multi-stage optimization framework for the real-time truck decision problem in open-pit mines: a case study on Sungun copper mine. International Journal of Mining, Reclamation and Environment 36:7, pages 461-491.
Read now
Mehrnaz Mohtasham, Hossein Mirzaei-Nasirabad, Hooman Askari-Nasab & Behrooz Alizadeh. (2021) Truck fleet size selection in open-pit mines based on the match factor using a MINLP model. Mining Technology 130:3, pages 159-175.
Read now
Weiguo Zeng, Ernest Baafi & David Walker. (2019) A simulation model to study bunching effect of a truck-shovel system. International Journal of Mining, Reclamation and Environment 33:2, pages 102-117.
Read now
Ali Moradi Afrapoli, Mohammad Tabesh & Hooman Askari-Nasab. (2019) A stochastic hybrid simulation-optimization approach towards haul fleet sizing in surface mines. Mining Technology 128:1, pages 9-20.
Read now
Odeta Viliūnienė & Loreta Inokaitytė. (2011) Statybos Vykdymo Planavimas Inžinerinio Pasirengimo Statybai Sistemoje. Statybinės Konstrukcijos ir Technologijos 3:3, pages 123-135.
Read now
C Burt, L Caccetta, P Welgama & L Fouché. (2011) Equipment selection with heterogeneous fleets for multiple-period schedules. Journal of the Operational Research Society 62:8, pages 1498-1509.
Read now
C.N. Burt & L. Caccetta. (2007) Match factor for heterogeneous truck and loader fleets. International Journal of Mining, Reclamation and Environment 21:4, pages 262-270.
Read now
Sebeom Park & Yosoon Choi. Analysis of the truck haulage system in an underground mine using long-term log data. Geosystem Engineering 0:0, pages 1-11.
Read now

Articles from other publishers (30)

Sebeom Park, Yosoon Choi, Hoang Nguyen, Erkan Topal & Xuan-Nam Bui. 2024. Applications of Artificial Intelligence in Mining, Geotechnical and Geoengineering. Applications of Artificial Intelligence in Mining, Geotechnical and Geoengineering 113 130 .
Eray Ozkan, Hediye Tuydes-Yaman & Soner Osman Acar. (2023) Vertical alignment optimisation in highway design by means of mesh adaptive direct search. Proceedings of the Institution of Civil Engineers - Transport 176:6, pages 373-384.
Crossref
Anastasiia Filatova, Mikhail Kovalchuk, Stanislav Batalenkov, Aleksander Voskresenskiy, Irina Deeva, Anna Kalyuzhnaya, Aleksei Shpilman, Natalia Kondrashova, Maxim Dudnichenko & Denis Nasonov. (2023) A Multi-Contractor Approach for MLRCPSP with the Graph Structure Optimization. A Multi-Contractor Approach for MLRCPSP with the Graph Structure Optimization.
Sebeom Park, Dahee Jung & Yosoon Choi. (2023) Prediction of Ore Production in a Limestone Underground Mine by Combining Machine Learning and Discrete Event Simulation Techniques. Minerals 13:6, pages 830.
Crossref
Nur Kamaliah Mustaffa. (2022) Alternative Configurations of Earthmoving Loading Practices toward Emissions Reduction. Journal of Construction Engineering and Management 148:1.
Crossref
Sebeom Park, Dahee Jung, Hoang Nguyen & Yosoon Choi. (2021) Diagnosis of Problems in Truck Ore Transport Operations in Underground Mines Using Various Machine Learning Models and Data Collected by Internet of Things Systems. Minerals 11:10, pages 1128.
Crossref
Yosoon Choi, Hoang Nguyen, Xuan-Nam Bui, Trung Nguyen-Thoi & Sebeom Park. (2020) Estimating Ore Production in Open-pit Mines Using Various Machine Learning Algorithms Based on a Truck-Haulage System and Support of Internet of Things. Natural Resources Research 30:2, pages 1141-1173.
Crossref
Yago Villar, Marta Menéndez, Zulima Fernández & Antonio Bernardo. (2020) Sustainable earthworks: Optimization with the ICOM method. Energy Reports 6, pages 404-419.
Crossref
Babak Ebrahimi, Holger Wallbaum, Pål Drevland Jakobsen & Gaylord Kabongo Booto. (2020) Regionalized environmental impacts of construction machinery. The International Journal of Life Cycle Assessment 25:8, pages 1472-1485.
Crossref
Brighton Samatemba, Long Zhang & Bunda Besa. (2020) Evaluating and optimizing the effectiveness of mining equipment; the case of Chibuluma South underground mine. Journal of Cleaner Production 252, pages 119697.
Crossref
Chukwuemeka Patrick Ogbu & Chinedu Chimdi Adindu. (2019) Direct risk factors and cost performance of road projects in developing countries. Journal of Engineering, Design and Technology 18:2, pages 326-342.
Crossref
Christina N. Burt & Louis Caccetta. 2018. Equipment Selection for Mining: With Case Studies. Equipment Selection for Mining: With Case Studies 25 51 .
Christina N. Burt & Louis Caccetta. 2018. Equipment Selection for Mining: With Case Studies. Equipment Selection for Mining: With Case Studies 11 23 .
Burak OzdemirMustafa Kumral. (2017) Stochastic Assessment of the Material Haulage Efficiency in the Earthmoving Industry. Journal of Construction Engineering and Management 143:8.
Crossref
Y. Villar & B. Llamas. (2017) Método iCOM: compensación optimizada de masas en obras lineales. Informes de la Construcción 69:546, pages 199.
Crossref
Christina Burt, Louis Caccetta, Leon Fouché & Palitha Welgama. (2015) An MILP approach to multi-location, multi-period equipment selection for surface mining with case studies. Journal of Industrial and Management Optimization 12:2, pages 403-430.
Crossref
Hyongdoo Jang & Erkan Topal. (2014) A review of soft computing technology applications in several mining problems. Applied Soft Computing 22, pages 638-651.
Crossref
A. Rashidi, H. Rashidi Nejad & Marcel Maghiar. (2014) Productivity estimation of bulldozers using generalized linear mixed models. KSCE Journal of Civil Engineering 18:6, pages 1580-1589.
Crossref
Christina N. Burt & Lou Caccetta. (2014) Equipment Selection for Surface Mining: A Review. Interfaces 44:2, pages 143-162.
Crossref
Hyun-Mi Kim, Tae-Hyung Kim, Young-Keun Shin, Young-Suk Kim & Seungwoo Han. (2012) Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems. Journal of the Korea Institute of Building Construction 12:6, pages 636-647.
Crossref
Juliana Parreira & John Meech. 2011. Autonomous and Intelligent Systems. Autonomous and Intelligent Systems 63 72 .
A. Panas & J.P. Pantouvakis. (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management 17:5, pages 461-475.
Crossref
Bozena Hola & Krzysztof Schabowicz. (2010) Estimation of earthworks execution time cost by means of artificial neural networks. Automation in Construction 19:5, pages 570-579.
Crossref
A. B. Goktepe, A. H. Lav & S. Altun. (2009) Method for optimal vertical alignment of highways. Proceedings of the Institution of Civil Engineers - Transport 162:4, pages 177-188.
Crossref
Hong Zhang. (2008) Multi-objective simulation-optimization for earthmoving operations. Automation in Construction 18:1, pages 79-86.
Crossref
Feniosky Peña-Mora, Sangwon Han, SangHyun Lee & Moonseo Park. (2008) Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach. Journal of Construction Engineering and Management 134:9, pages 701-710.
Crossref
Phillip S. Dunston, Joseph V. Sinfield & Tai-Yuan Lee. (2007) Technology Development Decision Economics for Real-Time Rolling Resistance Monitoring of Haul Roads. Journal of Construction Engineering and Management 133:5, pages 393-402.
Crossref
Mohamed MarzoukOsama Moselhi. (2004) Multiobjective Optimization of Earthmoving Operations. Journal of Construction Engineering and Management 130:1, pages 105-113.
Crossref
Junli Yang, David J Edwards & Peter E.D Love. (2003) A computational intelligent fuzzy model approach for excavator cycle time simulation. Automation in Construction 12:6, pages 725-735.
Crossref
Vineet R. KamatJulio C. Martinez. (2001) Visualizing Simulated Construction Operations in 3D. Journal of Computing in Civil Engineering 15:4, pages 329-337.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.