449
Views
25
CrossRef citations to date
0
Altmetric
Original Articles

The evidence of complex variability in construction labour productivity

Pages 3-12 | Published online: 22 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Wenchi Shou, Jun Wang, Peng Wu, Xiangyu Wang & Heap-Yih Chong. (2017) A cross-sector review on the use of value stream mapping. International Journal of Production Research 55:13, pages 3906-3928.
Read now
Abdulaziz M. Jarkas & R. Malcolm W. Horner. (2015) Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics 33:8, pages 625-639.
Read now
Irina Brodetskaia, Rafael Sacks & Aviad Shapira. (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics 29:12, pages 1209-1227.
Read now
Ophir Rozenfeld, Rafael Sacks & Yehiel Rosenfeld. (2009) ‘CHASTE’: construction hazard assessment with spatial and temporal exposure. Construction Management and Economics 27:7, pages 625-638.
Read now
GhalebJ. Sweis, RatebJ. Sweis, AymanA. Abu Hammad & H. Randolph Thomas. (2008) Factors Affecting Baseline Productivity in Masonry Construction: A Comparative Study in the US, UK and Jordan. Architectural Science Review 51:2, pages 146-152.
Read now
Jay Na Lim & George Ofori. (2007) Classification of innovation for strategic decision making in construction businesses. Construction Management and Economics 25:9, pages 963-978.
Read now

Articles from other publishers (19)

Eunbeen JeongJunyoung Jang, Seulbi Lee, Seungjun Ahn & Tae Wan Kim. (2024) Quantitative Analysis of the Factors Influencing Field Installation Time for Precast Concrete Building Components: An Empirical Study. Journal of Management in Engineering 40:3.
Crossref
Nawaf K. Alsohiman, Wael Alattyih & Husnain Haider. (2023) Ranking of Variation Orders Caused by the Owners of Construction Projects in Saudi Arabia Using Statistical and Fuzzy-Based Methods. CivilEng 4:4, pages 1121-1142.
Crossref
Rex Asibuodu Ugulu, Andrew Arewa & Stephen Allen. (2019) Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry. Built Environment Project and Asset Management 10:1, pages 94-109.
Crossref
WoonSeong Jeong, Soowon Chang, JeongWook Son & June-Seong Yi. (2016) BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management. Sustainability 8:11, pages 1106.
Crossref
Ricardo Antunes & Vicente Gonzalez. (2015) A Production Model for Construction: A Theoretical Framework. Buildings 5:1, pages 209-228.
Crossref
Shamil Naoum. 2015. Design Economics for the Built Environment. Design Economics for the Built Environment 93 106 .
Liju Joshua & Koshy Varghese. (2014) Automated recognition of construction labour activity using accelerometers in field situations. International Journal of Productivity and Performance Management 63:7, pages 841-862.
Crossref
Rami Hughes & David Thorpe. (2014) A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation 14:2, pages 210-228.
Crossref
Serdar Ulubeyli, Aynur Kazaz & Bayram Er. (2014) Planning Engineers’ Estimates on Labor Productivity: Theory and Practice. Procedia - Social and Behavioral Sciences 119, pages 12-19.
Crossref
Irina BrodetskaiaRafael SacksAviad Shapira. (2013) Stabilizing Production Flow of Interior and Finishing Works with Reentrant Flow in Building Construction. Journal of Construction Engineering and Management 139:6, pages 665-674.
Crossref
Mustafa Oral, Emel Laptali Oral & Ahmet Aydın. (2012) Supervised vs. unsupervised learning for construction crew productivity prediction. Automation in Construction 22, pages 271-276.
Crossref
Brad W. WambekeSimon M. HsiangMin Liu. (2011) Causes of Variation in Construction Project Task Starting Times and Duration. Journal of Construction Engineering and Management 137:9, pages 663-677.
Crossref
Chien-Ho Ko. (2011) Production control in precast fabrication: considering demand variability in production schedules. Canadian Journal of Civil Engineering 38:2, pages 191-199.
Crossref
Paul Chan & Rachel Cooper. 2010. Constructing Futures. Constructing Futures 195 217 .
Emel Laptali Oral & Mustafa Oral. (2010) Predicting construction crew productivity by using Self Organizing Maps. Automation in Construction 19:6, pages 791-797.
Crossref
Rafael Sacks, Milan Radosavljevic & Ronen Barak. (2010) Requirements for building information modeling based lean production management systems for construction. Automation in Construction 19:5, pages 641-655.
Crossref
Brad Wambeke, Min Liu & Simon M. Hsiang. (2010) Causes of Variation in Construction Task Starting Times and Duration. Causes of Variation in Construction Task Starting Times and Duration.
Alan D. Zimm. (2005) Derivation of a Logistic Equation for Organizations, and its Expansion into a Competitive Organizations Simulation. Computational and Mathematical Organization Theory 11:1, pages 37-57.
Crossref
Aynur Kazaz & Serdar Ulubeyli. (2004) A different approach to construction labour in Turkey: comparative productivity analysis. Building and Environment 39:1, pages 93-100.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.