393
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

Using the principal component analysis method as a tool in contractor pre‐qualification

, &
Pages 673-684 | Received 27 Mar 2003, Accepted 09 Dec 2004, Published online: 17 Feb 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

V. K. Acheamfour, T. Adjei-Kumi & E. Kissi. (2023) Contractor selection: a review of qualification and pre-qualification systems. International Journal of Construction Management 23:2, pages 338-348.
Read now
Hassan Hosseini Nasab & Mona Mirghani Ghamsarian. (2015) A fuzzy multiple-criteria decision-making model for contractor prequalification. Journal of Decision Systems 24:4, pages 433-448.
Read now
Edyta Plebankiewicz. (2014) Modelling decision-making processes in bidding procedures with the use of the fuzzy sets theory. International Journal of Strategic Property Management 18:3, pages 307-316.
Read now
Edyta Plebankiewicz. (2009) Contractor prequalification model using fuzzy sets. Journal of Civil Engineering and Management 15:4, pages 377-385.
Read now

Articles from other publishers (25)

Song Pan, Yuejiu Zheng, Languang Lu, Kai Shen & Siqi Chen. (2023) Neural Network PID-Based Preheating Control and Optimization for a Li-Ion Battery Module at Low Temperatures. World Electric Vehicle Journal 14:4, pages 83.
Crossref
Sajjad Ali Mahmood Alkaabi & Ahmed Mohammed Raoof Mahjoob. (2023) Using the ordinal priority approach for selecting the contractor in construction projects. Organization, Technology and Management in Construction: an International Journal 15:1, pages 136-156.
Crossref
Asli Pelin Gurgun, Kerim Koc & Serdar Durdyev. (2022) IMPROVING THE OWNER-CONTRACTOR RELATIONSHIP THROUGH TRUST-BASED PREQUALIFICATION IN GREEN BUILDING PROJECTS. Journal of Green Building 17:2, pages 211-231.
Crossref
Umar Muhammad Modibbo, Musa Hassan, Aquil Ahmed & Irfan Ali. (2022) Multi-criteria decision analysis for pharmaceutical supplier selection problem using fuzzy TOPSIS. Management Decision 60:3, pages 806-836.
Crossref
Junwang Ma, Zhifeng Tang, Fuzai Lv, Changqun Yang, Weixu Liu, Yinfei Zheng & Yang Zheng. (2021) High-Sensitivity Ultrasonic Guided Wave Monitoring of Pipe Defects Using Adaptive Principal Component Analysis. Sensors 21:19, pages 6640.
Crossref
Amir Faraji, Maria Rashidi & Ehsan Sorooshnia. (2020) An Integrated Organizational System for Project Source Selection in the Major Iranian Construction Companies. Buildings 10:12, pages 251.
Crossref
Zou, Yu, Wang, Dai, Sun, Zhang, Zhang, Shi, Xie & Wang. (2019) Establishing a Model for Evaluating Chicken Coccidiosis Resistance Based on Principal Component Analysis. Animals 9:11, pages 926.
Crossref
Victor Karikari Acheamfour, Ernest Kissi, Theophilus Adjei-Kumi & Emmanuel Adinyira. (2019) Review of empirical arguments on contractor pre-qualification criteria. Journal of Engineering, Design and Technology 18:1, pages 70-83.
Crossref
Victor Karikari Acheamfour, Ernest Kissi & Theophilus Adjei-Kumi. (2019) Ascertaining the impact of contractors pre-qualification criteria on project success criteria. Engineering, Construction and Architectural Management 26:4, pages 618-632.
Crossref
R Kozik. (2019) The Process of the Tender Evaluation in Public Procurement for Implementation of Design Documentation. IOP Conference Series: Earth and Environmental Science 222, pages 012019.
Crossref
Athena Forghani, Seyed Jafar Sadjadi & Babak Farhang Moghadam. (2018) A supplier selection model in pharmaceutical supply chain using PCA, Z-TOPSIS and MILP: A case study. PLOS ONE 13:8, pages e0201604.
Crossref
Renfu Jia, Shibiao Fang, Wenrong Tu & Zhilin Sun. (2016) Driven Factors Analysis of China’s Irrigation Water Use Efficiency by Stepwise Regression and Principal Component Analysis. Discrete Dynamics in Nature and Society 2016, pages 1-12.
Crossref
H. Omrani, R. Gharizadeh Beiragh & S. Shafiei Kaleibari. (2015) Performance assessment of Iranian electricity distribution companies by an integrated cooperative game data envelopment analysis principal component analysis approach. International Journal of Electrical Power & Energy Systems 64, pages 617-625.
Crossref
M. Motiar Rahman. 2015. Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate. Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate 1219 1229 .
K.C. Lam & C.Y. Yu. (2011) A multiple kernel learning-based decision support model for contractor pre-qualification. Automation in Construction 20:5, pages 531-536.
Crossref
Bassam Baroudi & Mike Metcalfe. (2011) Prequalification: Using Systems to Problem Dissolve. Project Management Journal 42:2, pages 51-62.
Crossref
Ka-Chi Lam, Ran Tao & Mike Chun-Kit Lam. (2010) A material supplier selection model for property developers using Fuzzy Principal Component Analysis. Automation in Construction 19:5, pages 608-618.
Crossref
Gary Holt. (2010) Contractor selection innovation: examination of two decades' published research. Construction Innovation 10:3, pages 304-328.
Crossref
Ka-Chi LamMike Chun-Kit LamDan Wang. (2010) Efficacy of Using Support Vector Machine in a Contractor Prequalification Decision Model. Journal of Computing in Civil Engineering 24:3, pages 273-280.
Crossref
Piotr Jaskowski, Slawomir Biruk & Robert Bucon. (2010) Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment. Automation in Construction 19:2, pages 120-126.
Crossref
L. C. M. TangA. Y. T. LeungC. W. Y. Wong. (2010) Entropic Risk Analysis by a High Level Decision Support System for Construction SMEs. Journal of Computing in Civil Engineering 24:1, pages 81-94.
Crossref
Albert P. C. ChanDaniel W. M. ChanJohn F. Y. Yeung. (2009) Overview of the Application of “Fuzzy Techniques” in Construction Management Research. Journal of Construction Engineering and Management 135:11, pages 1241-1252.
Crossref
Ka-Chi LamXin NingMike Chun-Kit Lam. (2009) Conjoining MMAS to GA to Solve Construction Site Layout Planning Problem. Journal of Construction Engineering and Management 135:10, pages 1049-1057.
Crossref
Ka Chi Lam, Ekambaram Palaneeswaran & Chen-yun Yu. (2009) A support vector machine model for contractor prequalification. Automation in Construction 18:3, pages 321-329.
Crossref
Asli Pelin Gurgun, Kerim Koc & Serdar Durdyev. (2021) Improving Owner-Contractor Relationship Through Trust-based Prequalification in Green Building Projects. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.