1,424
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

Benefits and disadvantages of ERP in industrialised timber frame housing in Sweden

&
Pages 831-838 | Received 01 May 2004, Accepted 13 Mar 2005, Published online: 17 Feb 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Mohd Hanizun Hanafi, Peter Farrell, Mohd Nazaruddin Yusoff, Shardy Abdullah & Arman Abdul Razak. (2018) Installation systems of on-site prefabricated concrete components: a qualitative approach. International Journal of Construction Management 18:5, pages 343-350.
Read now
Andrew S. Chang & Kuan-Pei Lee. (2011) Cost/schedule data needs and processes for construction ERP. Journal of the Chinese Institute of Engineers 34:6, pages 721-731.
Read now
Weizhuo Lu, Thomas Olofsson & Lars Stehn. (2011) A lean‐agile model of homebuilders’ production systems. Construction Management and Economics 29:1, pages 25-35.
Read now

Articles from other publishers (12)

Maria A. Gartner, Wolfgang Grenzfurtner, Barbara Zauner & Manfred Gronalt. (2024) Job and product rotation for maximising the production output on multi mixed-model assembly lines for element prefabrication in industrialised housebuilding. Computers & Industrial Engineering 190, pages 110041.
Crossref
Long Li, Haiying LuanXianfei Yin, Yudan Dou, Mengqi Yuan & Zhongfu Li. (2022) Understanding Sustainability in Off-Site Construction Management: State of the Art and Future Directions. Journal of Construction Engineering and Management 148:11.
Crossref
Dimosthenis Kifokeris. (2021) Variants of Swedish Lean Construction Practices Reported in Research: Systematic Literature Review and Critical Analysis. Journal of Construction Engineering and Management 147:7.
Crossref
Maria Anna Huka, Wolfgang Grenzfurtner, Barbara Zauner & Manfred Gronalt. (2021) Capacity planning of a mixed-model assembly line for prefabricated housebuilding elements. Procedia Computer Science 180, pages 706-713.
Crossref
Zhaoxi Zhan, Chen Wang, Jeffrey Boon Hui Yap & Ming Shyang Loi. (2020) Retrofitting ancient timber glulam mortise & tenon construction joints through computer-aided laser cutting. Heliyon 6:4, pages e03671.
Crossref
Long Li, Zhongfu Li, Xiaodong Li, Shengxi Zhang & Xiaowei Luo. (2020) A new framework of industrialized construction in China: Towards on-site industrialization. Journal of Cleaner Production 244, pages 118469.
Crossref
Xin HuHeap-Yih Chong, Xiangyu WangKerry London. (2019) Understanding Stakeholders in Off-Site Manufacturing: A Literature Review. Journal of Construction Engineering and Management 145:8.
Crossref
Lei Jiang, Zhongfu Li, Long Li, Tiankun Li & Yunli Gao. (2018) A Framework of Industrialized Building Assessment in China Based on the Structural Equation Model. International Journal of Environmental Research and Public Health 15:8, pages 1687.
Crossref
Malay Dave, Bruce Watson & Deo Prasad. (2017) Performance and Perception in Prefab Housing: An Exploratory Industry Survey on Sustainability and Affordability. Procedia Engineering 180, pages 676-686.
Crossref
정하은 & 이상춘. (2014) Research for the management ERP introduction improvement of the Chinese market multinationals by introducing Factor in the ERP System. The Journal of International Trade & Commerce 10:6, pages 943-964.
Crossref
Omer TatariMiroslaw J. Skibniewski. (2011) Empirical Analysis of Construction Enterprise Information Systems: Assessing System Integration, Critical Factors, and Benefits. Journal of Computing in Civil Engineering 25:5, pages 347-356.
Crossref
kim il sik & Eui Hong. (2008) A Study on Factors Determining ERP Introduction and its Effects on Korean Small and Medium-Sized Enterprises Made Inroad into China. Korean Journal of Logistics 16:2, pages 121-143.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.