Alireza Borhani, Atieh BorhaniCarrie Sturts Dossick & Julie Jupp. (2024) An Ontological Analysis for Comparison of the Concepts of Sustainable Building and Intelligent Building. Journal of Construction Engineering and Management 150:4.
Crossref
Hans Voordijk & Léon olde Scholtenhuis. (2022) Technological mediation and 3D visualizations in construction engineering practice. AI & SOCIETY 39:1, pages 207-220.
Crossref
Carlos Francisco Lucena Gonzalez, Antonio Manuel Reyes Rodriguez & Francisco Villena Manzanares. (2024) Disruptive method for managing BIM design and construction using Kanban. Organization, Technology and Management in Construction: an International Journal 16:1, pages 1-12.
Crossref
Ze Chang, Yu Chen, Erik Schlangen & Branko Šavija. (2023) A review of methods on buildability quantification of extrusion-based 3D concrete printing: From analytical modelling to numerical simulation. Developments in the Built Environment 16, pages 100241.
Crossref
Samad M. E. Sepasgozar. (2023) Construction Digital Technology Assimilation and Absorption Capability Using Measurement Invariance of Composite Modeling. Journal of Construction Engineering and Management 149:7.
Crossref
Kai Hänninen, Jouni Juntunen & Harri Haapasalo. (2023) Identifying latent classes to successful AEC innovation through a survey of Finnish construction companies. Construction Innovation 24:7, pages 163-187.
Crossref
Danny Murguia, Peter Demian & Robby Soetanto. (2021) The role of the industry's cultural-cognitive elements on actors' intention to adopt BIM: an empirical study in Peru. Engineering, Construction and Architectural Management 30:3, pages 1183-1200.
Crossref
Chukwuma Nnaji, Ifeanyi Okpala, Ibukun Awolusi & John Gambatese. (2023) A systematic review of technology acceptance models and theories in construction research. Journal of Information Technology in Construction 28, pages 39-69.
Crossref
Pedro Mêda, Diego Calvetti & Hipólito Sousa. (2023) Exploring the Potential of iPad-LiDAR Technology for Building Renovation Diagnosis: A Case Study. Buildings 13:2, pages 456.
Crossref
Sambo Lyson Zulu & Ali M. Saad. (2023) A Sensemaking Perspective of Digitalisation in Construction Organisations. Sustainability 15:3, pages 2344.
Crossref
Begum Sertyesilisik & Egemen Sertyesilisik. 2023. Economic, Environmental and Health Consequences of Conservation Capital. Economic, Environmental and Health Consequences of Conservation Capital
127
138
.
Ming Shan Ng, Daniel Hall, Marc Schmailzl, Thomas Linner & Thomas Bock. (2022) Identifying enablers and relational ontology networks in design for digital fabrication. Automation in Construction 144, pages 104592.
Crossref
Melissa Candel & Niklas Törnå. (2021) Housing developers’ perceived barriers to implementing municipal sustainability requirements in Swedish sustainability-profiled districts. Journal of Housing and the Built Environment 37:4, pages 1693-1721.
Crossref
Barry Gledson. (2021) Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction. Construction Innovation 22:4, pages 1085-1103.
Crossref
Zhu Huang, Chao Mao, Jun Wang & Abdul-Manan Sadick. (2021) Understanding the key takeaway of construction robots towards construction automation. Engineering, Construction and Architectural Management 29:9, pages 3664-3688.
Crossref
Anna-Therése Järvenpää, Johan Larsson & Per Erik Eriksson. (2022) How public client’s control systems affect contractors’ innovation possibilities. Construction Innovation 24:7, pages 83-101.
Crossref
Fabrizio Ascione, Rosa Francesca De Masi, Margherita Mastellone, Francesco Tariello & Giuseppe Peter Vanoli. (2022) Housing module with 3D printed walls: nZEB performance, energy autonomy and exported level. Housing module with 3D printed walls: nZEB performance, energy autonomy and exported level.
Omar Maali, Nancy KeppleBrian Lines. (2022) Strategies to Achieve High Adoption of Organizational Change Initiatives within the AEC Industry. Journal of Management in Engineering 38:4.
Crossref
Sheryl Staub-French, Angelique Pilon, Erik Poirier, Azadeh Fallahi, Mohamed Kasbar, Francisco Calderon, Zahra Teshnizi & Thomas Froese. (2021) Construction process innovation on Brock Commons Tallwood House. Construction Innovation 22:1, pages 1-22.
Crossref
Johnson Adafin, Suzanne Wilkinson, James O.B. Rotimi, Casimir MacGregor, John Tookey & Regan Potangaroa. (2021) Creating a case for innovation acceleration in the New Zealand building industry. Construction Innovation 22:1, pages 185-204.
Crossref
Hamid Abdirad. (2022) Managing Digital Integration Routines in Engineering Firms: Cases of Disruptive BIM Cloud Collaboration Protocols. Journal of Management in Engineering 38:1.
Crossref
A.S. Guimarães, João M.P.Q. Delgado & S.S. Lucas. (2021) Thermal and Environmental Benefits of 3D Printing on Building Construction. Defect and Diffusion Forum 412, pages 99-106.
Crossref
Zelinna Pablo, Kerry London, Peter S.P. Wong & Malik Khalfan. (2021) Actor-network theory and the evolution of complex adaptive supply networks. Construction Innovation 21:4, pages 668-684.
Crossref
Florence Crespin-Mazet, Karine Goglio-Primard, Malena I. Havenvid & Åse Linné. (2021) The diffusion of innovation in project-based firms – linking the temporary and permanent levels of organisation. Journal of Business & Industrial Marketing 36:9, pages 1692-1705.
Crossref
Kerry A. London & Zelinna Pablo. 2021. Handbook of Research on Driving Transformational Change in the Digital Built Environment. Handbook of Research on Driving Transformational Change in the Digital Built Environment
404
429
.
Behzad Abbasnejad, Soroush Moeinzadeh, Alireza Ahankoob & Peter S. P. Wong. 2021. Handbook of Research on Driving Transformational Change in the Digital Built Environment. Handbook of Research on Driving Transformational Change in the Digital Built Environment
1
36
.
S. Pessoa, A.S. Guimarães, S.S. Lucas & N. Simões. (2021) 3D printing in the construction industry - A systematic review of the thermal performance in buildings. Renewable and Sustainable Energy Reviews 141, pages 110794.
Crossref
Danny Murguia, Peter DemianRobby Soetanto. (2021) Systemic BIM Adoption: A Multilevel Perspective. Journal of Construction Engineering and Management 147:4.
Crossref
Yan Zhang, His-Hsien Wei, Dong Zhao, Yilong Han & Jiayu Chen. (2020) Understanding innovation diffusion and adoption strategies in megaproject networks through a fuzzy system dynamic model. Frontiers of Engineering Management 8:1, pages 32-47.
Crossref
Florence Crespin-Mazet & Malena Ingemansson-Havenvid. (2021) Rethinking the theory-practice divide: How academia-industry collaboration contributes to theorising. Industrial Marketing Management 92, pages 277-288.
Crossref
Tiago Freire, Francis Brun, Artur Mateus & Florindo Gaspar. 2021. Sustainability and Automation in Smart Constructions. Sustainability and Automation in Smart Constructions
157
167
.
Christian Brockmann. 2020. Advanced Construction Management. Advanced Construction Management
269
277
.
Gabriel Castelblanco & Jose Guevara. (2020) Risk Allocation in PPP Unsolicited and Solicited Proposals in Latin America: Pilot Study in Colombia. Risk Allocation in PPP Unsolicited and Solicited Proposals in Latin America: Pilot Study in Colombia.
Omar Maali, Brian Lines, Jake Smithwick, Kristen Hurtado & Kenneth Sullivan. (2020) Best Practices of Organizational Change Management for Adopting New Technologies within the AEC Industry. Best Practices of Organizational Change Management for Adopting New Technologies within the AEC Industry.
F H Halicioglu. (2020) The relationship between eco-innovation and sustainability in the construction industry: Exploring knowledge networks from the perspective of ANT. IOP Conference Series: Earth and Environmental Science 588:5, pages 052059.
Crossref
Sjouke Beemsterboer, Henrikke Baumann & Holger Wallbaum. (2020) Bridging the gap between assessment and action: recommendations for the effective use of LCA in the building process. IOP Conference Series: Earth and Environmental Science 588:2, pages 022007.
Crossref
Mi Pan & Wei Pan. (2020) Stakeholder Perceptions of the Future Application of Construction Robots for Buildings in a Dialectical System Framework. Journal of Management in Engineering 36:6.
Crossref
Omar Maali, Brian Lines, Jake Smithwick, Kristen Hurtado & Kenneth Sullivan. (2020) Change management practices for adopting new technologies in the design and construction industry. Journal of Information Technology in Construction 25, pages 325-341.
Crossref
Gabriel Castelblanco, Jose Guevara, Harrison Mesa & Diego Flores. (2020) Risk Allocation in Unsolicited and Solicited Road Public-Private Partnerships: Sustainability and Management Implications. Sustainability 12:11, pages 4478.
Crossref
Bilal Succar & Erik Poirier. (2020) Lifecycle information transformation and exchange for delivering and managing digital and physical assets. Automation in Construction 112, pages 103090.
Crossref
George Agyekum-MensahAndy Reid & Titiloye Ayodeji Temitope. (2020) Methodological Pluralism: Investigation into Construction Engineering and Management Research Methods. Journal of Construction Engineering and Management 146:3.
Crossref
Yousaf Ali, Talal Bin Saad, Muhammad Sabir, Noor Muhammad, Aneel Salman & Khaqan Zeb. (2020) Integration of green supply chain management practices in construction supply chain of CPEC. Management of Environmental Quality: An International Journal 31:1, pages 185-200.
Crossref
Idongesit Williams. 2020. Contemporary Applications of Actor Network Theory. Contemporary Applications of Actor Network Theory
1
13
.
Mary Lundberg, Susanne Engström & Helena Lidelöw. (2019) Diffusion of innovation in a contractor company. Construction Innovation 19:4, pages 629-652.
Crossref
Sepasgozar & Davis. (2019) Digital Construction Technology and Job-site Equipment Demonstration: Modelling Relationship Strategies for Technology Adoption. Buildings 9:7, pages 158.
Crossref
Alexandra Waluszewski, Hakan Hakansson & Ivan Snehota. (2019) The public-private partnership (PPP) disaster of a new hospital – expected political and existing business interaction patterns. Journal of Business & Industrial Marketing 34:5, pages 1119-1130.
Crossref
Karen Boujaoudeh Khoury. (2019) Effective Communication Processes for Building Design, Construction, and Management. Buildings 9:5, pages 112.
Crossref
John Lindgren & Kristian Widén. 2019. 10th Nordic Conference on Construction Economics and Organization. 10th Nordic Conference on Construction Economics and Organization
221
228
.
Henrik Buhl, Michael Andersen & Hannele Kerosuo. 2019. 10th Nordic Conference on Construction Economics and Organization. 10th Nordic Conference on Construction Economics and Organization
281
288
.
André M. Green, Brenda R. Brand & George E. Glasson. (2018) Applying actor–network theory to identify factors contributing to nonpersistence of African American students in STEM majors. Science Education 103:2, pages 241-263.
Crossref
Taylor Marchment & Jay Sanjayan. 2019. First RILEM International Conference on Concrete and Digital Fabrication – Digital Concrete 2018. First RILEM International Conference on Concrete and Digital Fabrication – Digital Concrete 2018
148
156
.
Xianhai Meng & Andrew Brown. (2018) Innovation in construction firms of different sizes: drivers and strategies. Engineering, Construction and Architectural Management 25:9, pages 1210-1225.
Crossref
Samad M.E. Sepasgozar, Steven Davis, Martin Loosemore & Leonhard Bernold. (2018) An investigation of modern building equipment technology adoption in the Australian construction industry. Engineering, Construction and Architectural Management 25:8, pages 1075-1091.
Crossref
Eunhwa Yang, Ying Hua & Thomas Diciccio. (2018) DIFFUSION OF INNOVATION IN SUSTAINABLE BUILDING PRACTICES AND THE ROLE OF STAKEHOLDERS. Journal of Green Building 13:4, pages 91-102.
Crossref
Nasim Didehvar, Mohammadnabi Teymourifard, Mohammad Mojtahedi & Samad Sepasgozar. (2018) An Investigation on Virtual Information Modeling Acceptance Based on Project Management Knowledge Areas. Buildings 8:6, pages 80.
Crossref
Amos Darko, Albert Ping Chuen Chan & Emmanuel Kingsford Owusu. (2018) What are the green technologies for sustainable housing development? An empirical study in Ghana. Business Strategy & Development 1:2, pages 140-153.
Crossref
Daniel J. Sage & Chloé Vitry. 2018. Societies under Construction. Societies under Construction
1
49
.
Per Erik Eriksson & Henrik Szentes. (2017) Managing the tensions between exploration and exploitation in large construction projects. Construction Innovation 17:4, pages 492-510.
Crossref
Ming Shan, Bon-gang Hwang & Kristie Sze Ni Wong. (2017) A preliminary investigation of underground residential buildings: Advantages, disadvantages, and critical risks. Tunnelling and Underground Space Technology 70, pages 19-29.
Crossref
Chantal Fuhrer, Émilie Hoareau & Alain Cucchi. (2017) Le rôle des Technologies de l’Information et de la Communication dans la dynamique d’un réseau d’innovation : une approche ANT. Innovations n° 54:3, pages 197-228.
Crossref
Anita M. M. LiuIsabelle Y. S. Chan. (2017) Understanding the Interplay of Organizational Climate and Leadership in Construction Innovation. Journal of Management in Engineering 33:5.
Crossref
Mustafa Selçuk ÇıdıkDavid BoydNiraj Thurairajah. (2017) Innovative Capability of Building Information Modeling in Construction Design. Journal of Construction Engineering and Management 143:8.
Crossref
Enoch Sackey & Julius Akotia. (2017) Spanning the multilevel boundaries of construction organisations. Construction Innovation 17:3, pages 273-293.
Crossref
Barry J. Gledson & Calum Phoenix. (2017) Exploring organisational attributes affecting the innovativeness of UK SMEs. Construction Innovation 17:2, pages 224-243.
Crossref
Kerstin Hemström, Krushna Mahapatra & Leif Gustavsson. (2017) Architects’ perception of the innovativeness of the Swedish construction industry. Construction Innovation 17:2, pages 244-260.
Crossref
Sreejith Balasubramanian & Vinaya Shukla. (2017) Green supply chain management: an empirical investigation on the construction sector. Supply Chain Management: An International Journal 22:1, pages 58-81.
Crossref
Hannele Kerosuo. 2017. Agency at Work. Agency at Work
331
349
.
Christian BrockmannHorst BrezinskiAnita Erbe. (2016) Innovation in Construction Megaprojects. Journal of Construction Engineering and Management 142:11.
Crossref
Peng Wu, Jun Wang & Xiangyu Wang. (2016) A critical review of the use of 3-D printing in the construction industry. Automation in Construction 68, pages 21-31.
Crossref
Cecilia Gullberg. (2016) What makes accounting information timely?. Qualitative Research in Accounting & Management 13:2, pages 189-215.
Crossref
Barry J. Gledson. (2016) Hybrid project delivery processes observed in constructor BIM innovation adoption. Construction Innovation 16:2, pages 229-246.
Crossref
Jacquetta Shelton, Igor Martek & Chuan Chen. (2016) Implementation of innovative technologies in small-scale construction firms. Engineering, Construction and Architectural Management 23:2, pages 177-191.
Crossref
Natalya Sergeeva. (2016) What makes an “innovation champion”?. European Journal of Innovation Management 19:1, pages 72-89.
Crossref
Olugbenga Jide Olaniran. (2015) The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction 20:3, pages 235-251.
Crossref
Lauri Pulkka & Seppo Junnila. (2015) Gravitational slingshot analogy of discontinuous sustainability innovation in the construction industry. Construction Innovation 15:4, pages 409-427.
Crossref
MONIKA GRUBBAUER. (2015) Circulating knowledge, marketization and norm‐making: international developers and construction firms in Eastern Europe since 2000. Global Networks 15:3, pages 288-306.
Crossref
Maria D'Incognito, Nicola Costantino & Giovanni C. Migliaccio. (2015) Actors and barriers to the adoption of LCC and LCA techniques in the built environment. Built Environment Project and Asset Management 5:2, pages 202-216.
Crossref
M.Reza Hosseini, Nicholas Chileshe, Jian Zuo & Bassam Baroudi. (2015) Adopting global virtual engineering teams in AEC Projects. Construction Innovation 15:2, pages 151-179.
Crossref
Erik Poirier, Sheryl Staub-French & Daniel Forgues. (2015) Embedded contexts of innovation. Construction Innovation 15:1, pages 42-65.
Crossref
E. SackeyM. TuuliA. Dainty. (2015) Sociotechnical Systems Approach to BIM Implementation in a Multidisciplinary Construction Context. Journal of Management in Engineering 31:1.
Crossref
Weisheng Lu, Ada Fung, Yi Peng, Cong Liang & Steve Rowlinson. (2014) Cost-benefit analysis of Building Information Modeling implementation in building projects through demystification of time-effort distribution curves. Building and Environment 82, pages 317-327.
Crossref
Sue Llewellyn, Rob Procter, Gill Harvey, Gregory Maniatopoulos & Alan Boyd. (2014) Facilitating technology adoption in the NHS: negotiating the organisational and policy context – a qualitative study. Health Services and Delivery Research 2:23, pages 1-132.
Crossref
Feng Guo, Yan Chang-Richards, Suzanne Wilkinson & Ti Cun Li. (2014) Effects of project governance structures on the management of risks in major infrastructure projects: A comparative analysis. International Journal of Project Management 32:5, pages 815-826.
Crossref
Samad M. E. Sepasgozar & Steven Davis. (2014) Diffusion Pattern Recognition of Technology Vendors in Construction. Diffusion Pattern Recognition of Technology Vendors in Construction.
Eunhwa Yang & Ying Hua. (2014) Framework of Construction Innovation: A Review of Diffusion of Sustainable Innovation in the Building Sector. Framework of Construction Innovation: A Review of Diffusion of Sustainable Innovation in the Building Sector.
Eugenio PellicerVíctor YepesChristian L. CorreaLuis F. Alarcón. (2014) Model for Systematic Innovation in Construction Companies. Journal of Construction Engineering and Management 140:4.
Crossref
Eugenio PellicerVíctor YepesChristian L. CorreaLuis F. Alarcón. (2014) Modelo para la Innovación Sistemática en Empresas Constructoras. Journal of Construction Engineering and Management 140:4.
Crossref
Neringa Gudienė. 2014. Statybos projektų įgyvendinimą lemiančių sėkmės veiksnių daugiakriterė analizė. Statybos projektų įgyvendinimą lemiančių sėkmės veiksnių daugiakriterė analizė.
Alfredo Serpell & Romina Alvarez. (2014) A Systematic Approach for Evaluating Innovation Management in Construction Companies. Procedia Engineering 85, pages 464-472.
Crossref
Gabriela Zapata-Poveda & Chris Tweed. (2014) Official and informal tools to embed performance in the design of low carbon buildings. An ethnographic study in England and Wales. Automation in Construction 37, pages 38-47.
Crossref
Lei Zhang, Guangbin Wang & Honglei Liu. 2014. Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate. Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate
981
993
.
Per Erik Eriksson. (2013) Exploration and exploitation in project-based organizations: Development and diffusion of knowledge at different organizational levels in construction companies. International Journal of Project Management 31:3, pages 333-341.
Crossref
Richard Davies & Chris Harty. (2013) Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project. Automation in Construction 30, pages 15-24.
Crossref
Kjell Tryggestad, Lise Justesen & Jan Mouritsen. (2013) Project temporalities: how frogs can become stakeholders. International Journal of Managing Projects in Business 6:1, pages 69-87.
Crossref
Goh Bee Hua. 2013. Implementing IT Business Strategy in the Construction Industry. Implementing IT Business Strategy in the Construction Industry
67
92
.
Samad M. E. Sepasgozar & Leonhard E. Bernold. (2012) Factors Influencing the Decision of Technology Adoption in Construction. Factors Influencing the Decision of Technology Adoption in Construction.
Hakan I. UnsalJohn E. Taylor. (2011) Absorptive Capacity of Project Networks. Journal of Construction Engineering and Management 137:11, pages 994-1002.
Crossref
Monique Aubry. (2011) The social reality of organisational project management at the interface between networks and hierarchy. International Journal of Managing Projects in Business 4:3, pages 436-457.
Crossref
Stuart D. Green. 2011. Making Sense of Construction Improvement. Making Sense of Construction Improvement
195
237
.
Stuart D. Green. 2011. Making Sense of Construction Improvement. Making Sense of Construction Improvement
126
162
.
Daniel Sage, Andrew Dainty & Naomi Brookes. (2011) How actor‐network theories can help in understanding project complexities. International Journal of Managing Projects in Business 4:2, pages 274-293.
Crossref
Per Erik Eriksson & Mats Westerberg. (2011) Effects of cooperative procurement procedures on construction project performance: A conceptual framework. International Journal of Project Management 29:2, pages 197-208.
Crossref
Chris HartyJennifer Whyte. (2010) Emerging Hybrid Practices in Construction Design Work: Role of Mixed Media. Journal of Construction Engineering and Management 136:4, pages 468-476.
Crossref