480
Views
33
CrossRef citations to date
0
Altmetric
PAPERS

A simulated annealing hyperheuristic for construction resource levelling

&
Pages 163-175 | Received 19 Apr 2009, Accepted 28 Sep 2009, Published online: 01 Mar 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

Chin-Chia Wu, Jatinder N. D. Gupta, Shuenn-Ren Cheng, Bertrand M. T. Lin, Siu-Hung Yip & Win-Chin Lin. (2021) Robust scheduling for a two-stage assembly shop with scenario-dependent processing times. International Journal of Production Research 59:17, pages 5372-5387.
Read now
Gopinath Selvam & T. Ch. Madhavi Tadepalli. (2019) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management 0:0, pages 1-10.
Read now
Hylton Olivieri, Olli Seppänen & Ariovaldo Denis Granja. (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics 36:2, pages 109-124.
Read now
Lihua He & Lianying Zhang. (2013) Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project. Journal of the Operational Research Society 64:8, pages 1106-1117.
Read now

Articles from other publishers (29)

Marinos Aristotelous & Andreas C. Nearchou. (2024) An Empirical Analysis of a Set of Hybrid Heuristics for the Solution of the Resource Leveling Problem. Operations Research Forum 5:1.
Crossref
Win-Chin Lin, Xingong Zhang, Xinbo Liu, Kai-Xiang Hu, Shuenn-Ren Cheng, Ameni Azzouz & Chin-Chia Wu. (2023) Sequencing single machine multiple-class customer order jobs using heuristics and improved simulated annealing algorithms. RAIRO - Operations Research 57:3, pages 1417-1441.
Crossref
Lung-Yu Li, Jian-You Xu, Shuenn-Ren Cheng, Xingong Zhang, Win-Chin Lin, Jia-Cheng Lin, Zong-Lin Wu & Chin-Chia Wu. (2022) A Genetic Hyper-Heuristic for an Order Scheduling Problem with Two Scenario-Dependent Parameters in a Parallel-Machine Environment. Mathematics 10:21, pages 4146.
Crossref
Sayyid Ali Banihashemi & Mohammad Khalilzadeh. (2022) A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows. KSCE Journal of Civil Engineering 26:6, pages 2539-2554.
Crossref
Borna Dasović & Uroš Klanšek. (2022) A Review of Energy-Efficient and Sustainable Construction Scheduling Supported with Optimization Tools. Energies 15:7, pages 2330.
Crossref
Atilla Damci, Gul Polat, Firat Dogu Akin & Harun Turkoglu. (2020) Use of float consumption rate in resource leveling of construction projects. Frontiers of Engineering Management 9:1, pages 135-147.
Crossref
Borna Dasović & Uroš Klanšek. (2021) Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling. Sustainability 13:21, pages 12173.
Crossref
Chris Rausch, Benjamin Sanchez & Carl Haas. (2021) Topology Optimization of Architectural Panels to Minimize Waste during Fabrication: Algorithms for Panel Unfolding and Nesting . Journal of Construction Engineering and Management 147:7.
Crossref
Chin-Chia Wu, Danyu Bai, Juin-Han Chen, Win-Chin Lin, Lining Xing, Jia-Cheng Lin & Shuenn-Ren Cheng. (2021) Several variants of simulated annealing hyper-heuristic for a single-machine scheduling with two-scenario-based dependent processing times. Swarm and Evolutionary Computation 60, pages 100765.
Crossref
R Aarthy Reddy, M Balasubramanian & Gopinath Selvam. (2020) Analysis the effect of chromosome and generation count on genetic algorithm in construction projects: a case study. IOP Conference Series: Materials Science and Engineering 912:6, pages 062056.
Crossref
Hessa Almatroushi, Moncer Hariga, Rami As'ad & AbdulRahman Al-Bar. (2020) The multi resource leveling and materials procurement problem: an integrated approach. Engineering, Construction and Architectural Management 27:9, pages 2135-2161.
Crossref
Vincent F. Yu, Renan Maglasang & Yu-Chung Tsao. (2020) A reduced variable neighborhood search-based hyperheuristic for the shelf space allocation problem. Computers & Industrial Engineering 143, pages 106420.
Crossref
Borna Dasović, Mario Galić & Uroš Klanšek. (2020) A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling. Sustainability 12:8, pages 3405.
Crossref
Buyun Sheng, Hui Wang, Zheng Xiao, Chenglei Zhang, Feiyu Zhao & Xiyan Yin. (2018) A novel heuristic algorithm with activity back-shift response model for resource-constrained project scheduling problem. Soft Computing 23:17, pages 7805-7819.
Crossref
Michał Tomczak. (2019) Modeling of the harmonization method for executing a multi-unit construction project. Open Engineering 9:1, pages 282-291.
Crossref
S. Madeh PiryonesiMehran NasseriAbdollah Ramezani. (2019) Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimization. Canadian Journal of Civil Engineering 46:2, pages 81-86.
Crossref
J. D. García‐Nieves, J. L. Ponz‐Tienda, A. Salcedo‐Bernal & E. Pellicer. (2018) The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects. Computer-Aided Civil and Infrastructure Engineering 33:8, pages 655-671.
Crossref
Piotr Jaskowski & Slawomir Biruk. (2018) REDUCING RENEWABLE RESOURCE DEMAND FLUCTUATION USING SOFT PRECEDENCE RELATIONS IN PROJECT SCHEDULING. Journal of Civil Engineering and Management 24:4, pages 355-363.
Crossref
Ch. Markou, G.K. Koulinas & A.P. Vavatsikos. (2017) Project resources scheduling and leveling using Multi-Attribute Decision Models: Models implementation and case study. Expert Systems with Applications 77, pages 160-169.
Crossref
J. L. Ponz‐Tienda, A. Salcedo‐Bernal & Eugenio Pellicer. (2016) A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags. Computer-Aided Civil and Infrastructure Engineering 32:6, pages 474-498.
Crossref
Zhenyuan Liu, Liu Yang, Raoyi Deng & Jing Tian. (2017) An effective approach with feasible space decomposition to solve resource-constrained project scheduling problems. Automation in Construction 75, pages 1-9.
Crossref
Aggelos Gaitanidis, Vassilios Vassiliadis, Christos Kyriklidis & Georgios Dounias. (2016) Hybrid Evolutionary Algorithms in Resource Leveling Optimization. Hybrid Evolutionary Algorithms in Resource Leveling Optimization.
Markus Rager, Christian Gahm & Florian Denz. (2015) Energy-oriented scheduling based on Evolutionary Algorithms. Computers & Operations Research 54, pages 218-231.
Crossref
Georgios Koulinas, Lazaros Kotsikas & Konstantinos Anagnostopoulos. (2014) A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem. Information Sciences 277, pages 680-693.
Crossref
Christian Gahm, Bastian Dünnwald & Ramin Sahamie. (2014) A multi-criteria master production scheduling approach for special purpose machinery. International Journal of Production Economics 149, pages 89-101.
Crossref
Christos Kyriklidis & Georgios Dounias. 2014. Progress in Pattern Recognition, Image Analysis, Computer Vision, and Applications. Progress in Pattern Recognition, Image Analysis, Computer Vision, and Applications 335 343 .
G.K. Koulinas & K.P. Anagnostopoulos. (2013) A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities. Automation in Construction 31, pages 169-175.
Crossref
Konstantinos AnagnostopoulosGeorgios Koulinas. (2012) Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic. Journal of Computing in Civil Engineering 26:2, pages 204-213.
Crossref
Konstantinos P. Anagnostopoulos & Georgios K. Koulinas. (2010) A genetic hyperheuristic algorithm for the resource constrained project scheduling problem. A genetic hyperheuristic algorithm for the resource constrained project scheduling problem.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.