582
Views
14
CrossRef citations to date
0
Altmetric
PAPERS

Time–cost relationship of building projects: statistical adequacy of categorization with respect to project location

&
Pages 97-106 | Received 08 Mar 2010, Accepted 28 Sep 2010, Published online: 27 Jan 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Ming Hu & Miroslaw Skibniewski. (2022) The impact of the design team characteristics on the sustainable building construction cost: structural equation model analysis. Architectural Engineering and Design Management 18:5, pages 614-630.
Read now
Vahida Žujo, Diana Car-Pušić, Valentina Žileska-Pančovska & Marko Ćećez. (2017) Time and cost interdependence in water supply system construction projects. Technological and Economic Development of Economy 23:6, pages 895-914.
Read now
Ercan Erdis. (2013) The effect of current public procurement law on duration and cost of construction projects in Turkey. Journal of Civil Engineering and Management 19:1, pages 121-135.
Read now

Articles from other publishers (11)

Zaher Mundher Yaseen, Zainab Hasan Ali, Sinan Q. Salih & Nadhir Al-Ansari. (2020) Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model. Sustainability 12:4, pages 1514.
Crossref
Silvana Petruseva, Valentina Zileska-Pancovska & Diana Car-Pušić. (2019) Implementation of Process-Based and Data-Driven Models for Early Prediction of Construction Time. Advances in Civil Engineering 2019, pages 1-12.
Crossref
Savaş Bayram & Saad Al-jıbourı. (2018) Reference Class Forecasting Method in Predicting Construction Project Duration. Süleyman Demirel Üniversitesi Fen Bilimleri Enstitüsü Dergisi 22:3, pages 1132-1142.
Crossref
Gabriel Nani, Isaac Mensah & Theophilus Adjei-Kumi. (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology 15:6, pages 754-777.
Crossref
Savas Bayram. (2016) Duration prediction models for construction projects: In terms of cost or physical characteristics?. KSCE Journal of Civil Engineering 21:6, pages 2049-2060.
Crossref
Onur Dursun, Berk Ekici & Sevil Sariyildiz. (2015) Time-cost optimization at the conceptual design stage using differential evolution: Case of single family housing projects in Germany. Time-cost optimization at the conceptual design stage using differential evolution: Case of single family housing projects in Germany.
Miguel A. Guerrero, Yolanda Villacampa & Andrés Montoyo. (2014) Modeling construction time in Spanish building projects. International Journal of Project Management 32:5, pages 861-873.
Crossref
Tien Choon Toh, Cheng Sim Lim, Connie Ting, Kherun Nita Ali, Godwin Uche Aliagha & Kai Chen Goh. (2013) A Preliminary Survey of Factors Influencing Project Cost Estimating Practice in the Klang Valley of Malaysia. Applied Mechanics and Materials 470, pages 915-920.
Crossref
Long D. NguyenDuc H. PhanLlewellyn C. M. Tang. (2013) Simulating Construction Duration for Multistory Buildings with Controlling Activities. Journal of Construction Engineering and Management 139:8, pages 951-959.
Crossref
Giovanni C. MigliaccioMichele GuindaniMaria D’IncognitoLinlin Zhang. (2013) Empirical Assessment of Spatial Prediction Methods for Location Cost-Adjustment Factors. Journal of Construction Engineering and Management 139:7, pages 858-869.
Crossref
Onur Dursun & Christian Stoy. (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management 19:4, pages 444-468.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.