Structural equation model for investigating factors affecting delay in Indian construction projects

, &
Pages 869-884 | Received 08 Jan 2012, Accepted 30 Jul 2012, Published online: 24 Aug 2012

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (13)

MohammedShakil S. Malek & Viral Bhatt. (2023) Examine the comparison of CSFs for public and private sector’s stakeholders: a SEM approach towards PPP in Indian road sector. International Journal of Construction Management 23:13, pages 2239-2248.
Read now
Amílcar Arantes & Luis Miguel D. F. Ferreira. (2023) Development of delay mitigation measures in construction projects: a combined interpretative structural modeling and MICMAC analysis approach. Production Planning & Control 0:0, pages 1-16.
Read now
Goutom K. Pall, Adrian J. Bridge, Simon Washington, Jason Gray & Martin Skitmore. (2022) Critical delay factors in power transmission projects: a structural equation modeling approach. International Journal of Construction Management 22:6, pages 1158-1170.
Read now
Andrew Emejeit, Oluka Pross Nagitta, Michael Okoche & Marcia Mkansi. (2021) Contractor commitment and the delivery of road infrastructure projects in Uganda: A practitioner perspective. Africa Journal of Management 7:sup1, pages 82-103.
Read now
Amílcar Arantes & Luis Miguel D. F. Ferreira. (2021) A methodology for the development of delay mitigation measures in construction projects. Production Planning & Control 32:3, pages 228-241.
Read now
Mohamed Saad Bajjou & Anas Chafi. (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management 20:7, pages 783-800.
Read now
G. Muneeswaran, P. Manoharan, P. O. Awoyera & A. Adesina. (2020) A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management 20:5, pages 450-461.
Read now
Satish Kumar Viswanathan, Kamalendra Kumar Tripathi & Kumar Neeraj Jha. (2020) Influence of risk mitigation measures on international construction project success criteria – a survey of Indian experiences. Construction Management and Economics 38:3, pages 207-222.
Read now
Ritu Ahuja, Anil Sawhney, Megha Jain, Mohammed Arif & Samya Rakshit. (2020) Factors influencing BIM adoption in emerging markets – the case of India. International Journal of Construction Management 20:1, pages 65-76.
Read now
Soo-Yong Kim & Viet Thanh Nguyen. (2018) A Structural model for the impact of supply chain relationship traits on project performance in construction. Production Planning & Control 29:2, pages 170-183.
Read now
Panchanan Behera, R.P. Mohanty & Anand Prakash. (2015) Understanding Construction Supply Chain Management. Production Planning & Control 26:16, pages 1332-1350.
Read now
Dubem Ikediashi & Ikemefuna Mbamali. (2014) Modelling the impact of outsourcing decisions on facilities management service-level performance: a case of Nigeria’s public hospitals. Construction Management and Economics 32:11, pages 1130-1147.
Read now
Xianbo Zhao, Bon-Gang Hwang & Sui Pheng Low. (2013) Critical success factors for enterprise risk management in Chinese construction companies. Construction Management and Economics 31:12, pages 1199-1214.
Read now

Articles from other publishers (68)

Md. Mohaimenul Islam Sourav, Mohammed Russedul Islam, Sheikh Mohibur Rahman & Md. Istiak Jahan. (2024) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: scenario of Bangladesh. Engineering, Construction and Architectural Management.
Crossref
Kritsada Khun-anod, Tsunemi Watanabe & Satoshi Tsuchiya. (2024) Roles and Autonomous Motivation of Safety Officers: The Context of Construction Sites. Buildings 14:2, pages 460.
Crossref
Yung-Tsan Jou, Klint Allen Mariñas, Charmine Sheena Saflor, Don Adonis Bernabe, Jhon Raymond Casuncad, Karen Geronimo, Jerson Mabbagu, Felicitty Sales & Kim Aaron Verceles. (2024) Assessing the Community Perception in San Jose, Occidental Mindoro, of Proper Waste Disposal: A Structural Equation Modeling Approach. Sustainability 16:3, pages 1087.
Crossref
Dillip Kumar Das. (2024) Mitigating construction delays in Indian real estate projects through effective organizational and project management. International Journal of Building Pathology and Adaptation.
Crossref
Hakan TIRATACI & Hakan YAMAN. (2023) Konut Projelerinde İdeal İş Süresinin Tahmini İçin Bir Hesaplama Yöntemi ÖnerisiA Calculation Method Proposal For Estimation of Ideal Construction Duration in Housing Projects. Kent Akademisi 16:4, pages 2309-2336.
Crossref
Christian Nnaemeka Egwim, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi & Raphael Oseghale. (2021) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology 21:5, pages 1323-1342.
Crossref
Akriti Gupta, Aman Chadha, Vijayshri Tiwari, Arup Varma & Vijay Pereira. (2023) Sustainable training practices: predicting job satisfaction and employee behavior using machine learning techniques. Asian Business & Management 22:5, pages 1913-1936.
Crossref
Mohamed Saad Bajjou & Anas Chafi. (2023) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management.
Crossref
Kolawole Iyiola, Ahmad Alzubi & Kelsey Dappa. (2023) The influence of learning orientation on entrepreneurial performance: The role of business model innovation and risk-taking propensity. Journal of Open Innovation: Technology, Market, and Complexity 9:3, pages 100133.
Crossref
Dubem Ikediashi, Cletus Moobela, Kenneth Leitch, Nimi Dan-Jumbo, Afolabi Dania, Sani Reuben Reuben Akoh & Paul Esangbedo. (2023) Lecturer's pedagogical attributes and teaching quality for construction and engineering education in UK universities: mediating effect of research informed teaching. Journal of Applied Research in Higher Education.
Crossref
Ahmed Mohamed Hassan, S.M. Renuka & T. Monika. (2023) Analysis of factors causing rework and their mitigation strategies in construction projects. Materials Today: Proceedings.
Crossref
Sathvik Sharath Chandra, Samad M. E. Sepasgozar, Varadhiyagounder Ranganathan Prasath Kumar, Atul Kumar Singh, Loganathan Krishnaraj & Bankole Osita Awuzie. (2023) Assessing Factors Affecting Construction Equipment Productivity Using Structural Equation Modeling. Buildings 13:2, pages 502.
Crossref
Hakan Tirataci & Hakan Yaman. (2023) Estimation of ideal construction duration in tender preparation stage for housing projects. Organization, Technology and Management in Construction: an International Journal 15:1, pages 192-212.
Crossref
Mahesh Babu Purushothaman & Sumit Kumar. (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment 11:2, pages 294-312.
Crossref
Yung-Tsan Jou, Klint Allen Mariñas & Charmine Sheena Saflor. (2022) Assessing Cognitive Factors of Modular Distance Learning of K-12 Students Amidst the COVID-19 Pandemic towards Academic Achievements and Satisfaction. Behavioral Sciences 12:7, pages 200.
Crossref
Simranjeet SinghSparsh Johari, Abid Hasan & Kumar Neeraj Jha. (2022) Risk Factors in Dedicated Freight Corridor and Mass Rapid-Transit Metro Rail Infrastructure Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 14:2.
Crossref
Jeffrey Boon Hui Yap, Ban Leong Lim, Martin Skitmore & Jason Gray. (2021) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology 20:3, pages 800-822.
Crossref
Hafiz Suliman Munawar, Fahim Ullah, Siddra Qayyum & Danish Shahzad. (2022) Big Data in Construction: Current Applications and Future Opportunities. Big Data and Cognitive Computing 6:1, pages 18.
Crossref
Ismail Abdul Rahman, Abdulla Eisaa Saleh Al Ameri, Aftab Hameed Memon, Nashwan Al-Emad & Ahmed S. A. Marey Alhammadi. (2022) Structural Relationship of Causes and Effects of Construction Changes: Case of UAE Construction. Sustainability 14:2, pages 596.
Crossref
Rasha A. Waheeb & Bjørn S. Andersen. (2021) Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study. Public Works Management & Policy 27:1, pages 61-97.
Crossref
Adekunle Qudus AdelekeWaliu Adeniyi Ajibike, Gerry Nkombo MuukaMohd Ridzuan DarunTaofeeq Durojaye Moshood. (2021) Managing External Risk Factors on Oil and Gas Project Success: A Dream for All Firms. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering 7:4.
Crossref
Munmun Basak, Vaughan Coffey & Robert K. Perrons. (2021) The interaction between non-technical and technical risks in upstream natural gas project schedule overruns: Evidence from Australia. The Extractive Industries and Society 8:4, pages 100971.
Crossref
Sahil Garg & Sudhir Misra. (2021) Causal model for rework in building construction for developing countries. Journal of Building Engineering 43, pages 103180.
Crossref
Shuai Li, Dongshuo Wu & Youxia Sun. (2021) The Impact of Entrepreneurial Optimism and Labor Law on Business Performance of New Ventures. Frontiers in Psychology 12.
Crossref
Santu Kar & Kumar Neeraj Jha. (2021) Exploring the Critical Barriers to and Enablers of Sustainable Material Management Practices in the Construction Industry. Journal of Construction Engineering and Management 147:9.
Crossref
Mohammad Ajmal Nikjow, Li Liang, Xijing Qi, Samad M. E. Sepasgozar & Nicholas Chileshe. (2021) Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects. Sustainability 13:17, pages 9503.
Crossref
Sahil Garg & Sudhir Misra. (2021) Distribution of Rework Issues in Various Reinforced Concrete Building Components. Journal of Performance of Constructed Facilities 35:4.
Crossref
Svetlana Besklubova, Miroslaw J. SkibniewskiXueqing Zhang. (2021) Factors Affecting 3D Printing Technology Adaptation in Construction. Journal of Construction Engineering and Management 147:5.
Crossref
Mukhtar A Kassem, Muhamad Azry Khoiry & Noraini Hamzah. (2020) Theoretical review on critical risk factors in oil and gas construction projects in Yemen. Engineering, Construction and Architectural Management 28:4, pages 934-968.
Crossref
Asadullah Khan, Muhammad WarisShrikant PanigrahiMirza Rizwan SajidFaisal Rana. (2021) Improving the Performance of Public Sector Infrastructure Projects: Role of Project Governance and Stakeholder Management. Journal of Management in Engineering 37:2.
Crossref
Pramod Kumar Misra & Jitendra Mohanty. (2021) A review on training and leadership development: its effectiveness for enhancing employee performance in Indian construction industry. IOP Conference Series: Materials Science and Engineering 1045:1, pages 012020.
Crossref
Muhammad Irfan, Sanam Zaib Khan, Nasruddin Hassan, Mazlan Hassan, Muhammad Habib, Salma Khan & Hadi Hassan Khan. (2021) Role of Project Planning and Project Manager Competencies on Public Sector Project Success. Sustainability 13:3, pages 1421.
Crossref
Swarna Swetha Kolaventi, Hikmatullah Momand, Tezeswi Tadepalli, & M V N Siva Kumar. (2020) Construction waste in India: a structural equation model for identification of causes. Proceedings of the Institution of Civil Engineers - Engineering Sustainability 173:6, pages 303-314.
Crossref
Satish Kumar Viswanathan & Kumar Neeraj Jha. (2020) Risk mitigation modelling of international construction projects executed by Indian firms: a structural equation modelling approach. Engineering, Construction and Architectural Management 27:9, pages 2687-2713.
Crossref
Jeffrey Boon Hui Yap & Ian Ni Chow. (2020) Investigating the managerial ‘‘nuts and bolts’’ for the construction industry. Built Environment Project and Asset Management 10:3, pages 331-348.
Crossref
Muhammad Umer Zubair & Xueqing Zhang. (2020) Hybrid Performance-Measurement Model of Elevators. Journal of Performance of Constructed Facilities 34:2.
Crossref
Khalid K. Naji, Manal M. Mansour & Murat Gunduz. (2020) Methods for Modeling and Evaluating Construction Disputes: A Critical Review. IEEE Access 8, pages 45641-45652.
Crossref
Goutom K. Pall, Adrian J. Bridge, Jason Gray & Martin Skitmore. (2019) Causes of Delay in Power Transmission Projects: An Empirical Study. Energies 13:1, pages 17.
Crossref
Jeffrey Boon Hui Yap & Sin Yi Cheah. (2019) Key challenges faced by Chinese contractors in Malaysian construction industry. Journal of Engineering, Design and Technology 18:3, pages 705-726.
Crossref
Munmun Basak, Robert K. Perrons & Vaughan Coffey. (2019) Schedule overruns as a barrier for liquefied natural gas projects: A review of the literature and research agenda. Energy Reports 5, pages 210-220.
Crossref
Samad M. E. Sepasgozar, Reyhaneh Karimi, Sara Shirowzhan, Mohammad Mojtahedi, Sabbar Ebrahimzadeh & David McCarthy. (2019) Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK. Buildings 9:9, pages 191.
Crossref
Soo-Yong Kim & Viet Thanh Nguyen. (2018) Structural Equation Model of Interrelationships Among Constructs Affecting the Contractors’ Poor Safety Performance. Iranian Journal of Science and Technology, Transactions of Civil Engineering 43:2, pages 345-359.
Crossref
Hussein Abdellatif & Adel Alshibani. (2019) Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia. Buildings 9:4, pages 93.
Crossref
Serdar Durdyev & M. Reza Hosseini. (2019) Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business 13:1, pages 20-46.
Crossref
Rateb Sweis, Alireza Moarefi, Seyyed-Mahmoud Hoseini-Amiri & Soad Moarefi. (2019) Delay factors of the schedule of strategic industrial projects. International Journal of Building Pathology and Adaptation 37:1, pages 69-86.
Crossref
Peter F. Kaming, Ambrosius Koesmargono & Bimo Wahyu Aji. (2019) Delay model for Engineering Procurement Construction (EPC): a case of Liquefied Natural Gas (LNG) projects in Indonesia. MATEC Web of Conferences 270, pages 05010.
Crossref
Serdar Durdyev, Syuhaida Ismail, Ali Ihtiyar, Nur Fatin Syazwani Abu Bakar & Amos Darko. (2018) A partial least squares structural equation modeling (PLS-SEM) of barriers to sustainable construction in Malaysia. Journal of Cleaner Production 204, pages 564-572.
Crossref
Yingbo Ji, Lin Qi, Yan Liu, Xinnan Liu, Hong Li & Yan Li. (2018) Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China. Applied Sciences 8:11, pages 2324.
Crossref
Youcef J.-T. Zidane & Bjorn Andersen. (2018) The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business 11:3, pages 650-672.
Crossref
Jeffrey Boon Hui Yap, Hamzah Abdul-RahmanChen Wang. (2018) Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach. Journal of Construction Engineering and Management 144:5.
Crossref
Saheed O. Ajayi & Lukumon O. Oyedele. (2018) Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors. Waste Management 75, pages 60-69.
Crossref
Serdar DurdyevSyuhaida IsmailNurmurat Kandymov. (2018) Structural Equation Model of the Factors Affecting Construction Labor Productivity. Journal of Construction Engineering and Management 144:4.
Crossref
Ermias Tesfaye, Eshetie Berhan & Daniel Kitaw. 2018. Global Business Expansion. Global Business Expansion 289 307 .
Kamalendra Kumar TripathiKumar Neeraj Jha. (2018) Determining Success Factors for a Construction Organization: A Structural Equation Modeling Approach. Journal of Management in Engineering 34:1.
Crossref
Ayokunle Olubunmi Olanipekun, Bo (Paul) XiaCarol HonAmos Darko. (2018) Effect of Motivation and Owner Commitment on the Delivery Performance of Green Building Projects. Journal of Management in Engineering 34:1.
Crossref
M. Basak, V. Coffey & R. K. Perrons. (2017) Exploring risks causing schedule overrun in upstream natural gas projects — A critical review and implications for future research. Exploring risks causing schedule overrun in upstream natural gas projects — A critical review and implications for future research.
Nini XiaRui ZhongChunlin WuXueqing WangShuyuan Wang. (2017) Assessment of Stakeholder-Related Risks in Construction Projects: Integrated Analyses of Risk Attributes and Stakeholder Influences. Journal of Construction Engineering and Management 143:8.
Crossref
Jurbe Joseph Molwus, Bilge Erdogan & Stephen Ogunlana. (2017) Using structural equation modelling (SEM) to understand the relationships among critical success factors (CSFs) for stakeholder management in construction. Engineering, Construction and Architectural Management 24:3, pages 426-450.
Crossref
Nini Xia, Xueqing Wang, Ye Wang, Qiubo Yang & Xing Liu. (2017) Lifecycle cost risk analysis for infrastructure projects with modified Bayesian networks. Journal of Engineering, Design and Technology 15:1, pages 79-103.
Crossref
Mohamed KadryHesham OsmanMaged Georgy. (2017) Causes of Construction Delays in Countries with High Geopolitical Risks. Journal of Construction Engineering and Management 143:2.
Crossref
Goutom K. Pall, Adrian J. Bridge, Martin Skitmore & Jason Gray. (2016) Comprehensive review of delays in power transmission projects. IET Generation, Transmission & Distribution 10:14, pages 3393-3404.
Crossref
E. W. M. LamA. P. C. ChanD. W. M. ChanT. O. Oladinrin. (2016) Analysis of the Effectiveness of Instructional Strategies for Construction Management Students. Journal of Professional Issues in Engineering Education and Practice 142:3.
Crossref
Olugbenga T. OladinrinChristabel M. F. Ho. (2016) Critical Enablers for Codes of Ethics Implementation in Construction Organizations. Journal of Management in Engineering 32:1.
Crossref
Dubem I. Ikediashi & Stephen O. Ogunlana. (2015) Significant risk factors associated with facilities management (FM) outsourcing. Engineering, Construction and Architectural Management 22:6, pages 771-796.
Crossref
Bo Xiong, Martin Skitmore & Bo Xia. (2015) A critical review of structural equation modeling applications in construction research. Automation in Construction 49, pages 59-70.
Crossref
Youcef J-T. Zidane, Agnar Johansen, Bjørn Andersen & Erfan Hoseini. (2015) Time-thieves and Bottlenecks in the Norwegian Construction Projects. Procedia Economics and Finance 21, pages 486-493.
Crossref
Dubem I. Ikediashi, Stephen O. Ogunlana & Godfrey Udo. (2013) Structural equation model for analysing critical risks associated with facilities management outsourcing and its impact on firm performance. Journal of Facilities Management 11:4, pages 323-338.
Crossref
Hatim Jawadwala & Prashant Nagrale. (2019) Structural equation model for investigating factors affecting labour productivity in Infrastructure construction projects (A Case of Mumbai). SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.