865
Views
29
CrossRef citations to date
0
Altmetric
Articles

Developing and evaluating a framework of total constraint management for improving workflow in liquefied natural gas construction

, , &
Pages 859-874 | Received 10 Mar 2016, Accepted 18 Aug 2016, Published online: 12 Sep 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Wenchi Shou, Jun Wang, Peng Wu & Xiangyu Wang. (2021) Lean management framework for improving maintenance operation: development and application in the oil and gas industry. Production Planning & Control 32:7, pages 585-602.
Read now
Wenchi Shou, Jun Wang, Peng Wu, Xiangyu Wang & Heap-Yih Chong. (2017) A cross-sector review on the use of value stream mapping. International Journal of Production Research 55:13, pages 3906-3928.
Read now

Articles from other publishers (27)

Ajay Kumar Agrawal, Yang Zou, Long Chen, Mohammed Adel Abdelmegid & Vicente A. González. (2024) Moving toward lean construction through automation of planning and control in last planner system: A systematic literature review. Developments in the Built Environment 18, pages 100419.
Crossref
Jantanee Dumrak & Seyed Ashkan Zarghami. (2023) The role of artificial intelligence in lean construction management. Engineering, Construction and Architectural Management.
Crossref
Chengke Wu, Xiao Li, Rui Jiang, Yuanjun Guo, Jun Wang & Zhile Yang. (2022) Graph‐based deep learning model for knowledge base completion in constraint management of construction projects. Computer-Aided Civil and Infrastructure Engineering 38:6, pages 702-719.
Crossref
Zeyu Mao, Vicente A. Gonzalez & Yang Zou. (2022) Exploring a Digital Twin Framework for lean management of constraints in construction: A literature review. IOP Conference Series: Earth and Environmental Science 1101:8, pages 082019.
Crossref
Y Jia, M R Hosseini, B Zhang, I Martek, B Nikmehr & J Wang. (2022) A scientometric-content analysis of integration of BIM and IoT. IOP Conference Series: Earth and Environmental Science 1101:7, pages 072002.
Crossref
Yongqi WangVimal Kumar ThangasamyRobert L. K. TiongLimao Zhang. (2022) Improved Workflow for Precast Element Design Based on BIM and Lean Construction. Journal of Construction Engineering and Management 148:8.
Crossref
Hasan Gokberk BayhanYao MaJoseph ThekinenJiliang TangSinem Mollaoglu. (2022) Using Jaccard Similarity to Identify New Issues from AEC Project Team Meeting Minutes. Using Jaccard Similarity to Identify New Issues from AEC Project Team Meeting Minutes.
Hengqin Wu, Xue Lin, Xiao Li, Boyu Zhang, Clyde Zhengdao Li & Huabo Duan. (2022) A Data-Driven Approach to Trace the Development of Lean Construction in Building Projects: Topic Shift and Main Paths. Buildings 12:5, pages 616.
Crossref
Ranjith K. Soman & Miguel Molina-Solana. (2022) Automating look-ahead schedule generation for construction using linked-data based constraint checking and reinforcement learning. Automation in Construction 134, pages 104069.
Crossref
Mona Arabshahi, Di Wang, Junbo Sun, Payam Rahnamayiezekavat, Weichen Tang, Yufei Wang & Xiangyu Wang. (2021) Review on Sensing Technology Adoption in the Construction Industry. Sensors 21:24, pages 8307.
Crossref
Wenchi Shou, Jun Wang & Peng Wu. (2021) The application of simulation in lean production research: a critical review and future directions. Engineering, Construction and Architectural Management 28:8, pages 2119-2154.
Crossref
Renato Nunes Mariz & Flavio Augusto Picchi. (2021) Implementation of lean practices facilitated by BIM functionalities in the construction phase: advances and opportunities. Ambiente Construído 21:4, pages 309-328.
Crossref
Chengke Wu, Xiangyu Wang, Peng Wu, Jun Wang, Rui Jiang, Mengcheng Chen & Mohammad Swapan. (2021) Hybrid deep learning model for automating constraint modelling in advanced working packaging. Automation in Construction 127, pages 103733.
Crossref
Chengke Wu, Peng Wu, Jun Wang, Rui Jiang, Mengcheng Chen & Xiangyu Wang. (2021) Developing a hybrid approach to extract constraints related information for constraint management. Automation in Construction 124, pages 103563.
Crossref
Chengke Wu, Peng Wu, Jun Wang, Rui Jiang, Mengcheng Chen & Xiangyu Wang. (2021) Ontological knowledge base for concrete bridge rehabilitation project management. Automation in Construction 121, pages 103428.
Crossref
Ranjith K. Soman, Miguel Molina-Solana & Jennifer K. Whyte. (2020) Linked-Data based Constraint-Checking (LDCC) to support look-ahead planning in construction. Automation in Construction 120, pages 103369.
Crossref
YuXiang ZhangAshtad JavanmardiYanChun LiuShuJuan YangXiuXia YuSimon M. HsiangZhiHao JiangMin Liu. (2020) How Does Experience with Delay Shape Managers’ Making-Do Decision: Random Forest Approach. Journal of Management in Engineering 36:4.
Crossref
Hong Xian Li, Zhiliang Ma, Hexu Liu, Jun Wang, Mohamed Al-Hussein & Anthony Mills. (2020) Exploring and verifying BIM-based energy simulation for building operations. Engineering, Construction and Architectural Management 27:8, pages 1679-1702.
Crossref
Ashtad JavanmardiS. Alireza Abbasian-HosseiniMin Liu & Simon M. Hsiang. (2020) Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. Journal of Construction Engineering and Management 146:4.
Crossref
Xiao Li, Hung-lin Chi, Peng Wu & Geoffrey Qiping Shen. (2020) Smart work packaging-enabled constraint-free path re-planning for tower crane in prefabricated products assembly process. Advanced Engineering Informatics 43, pages 101008.
Crossref
Xiao Li, Chengke Wu, Peng Wu, Liqun Xiang, Geoffrey Qiping Shen, Steven Vick & Clyde Zhengdao Li. (2019) SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production. Journal of Cleaner Production 239, pages 117991.
Crossref
Xiao Li, Geoffrey Qiping Shen, Peng Wu, Fan Xue, Hung-lin Chi & Clyde Zhengdao Li. (2019) Developing a conceptual framework of smart work packaging for constraints management in prefabrication housing production. Advanced Engineering Informatics 42, pages 100938.
Crossref
Xiao Li, Geoffrey Qiping Shen, Peng Wu & Teng Yue. (2019) Integrating Building Information Modeling and Prefabrication Housing Production. Automation in Construction 100, pages 46-60.
Crossref
Tito CastilloLuis F. AlarcónEugenio Pellicer. (2018) Finding Differences among Construction Companies’ Management Practices and Their Relation to Project Performance. Journal of Management in Engineering 34:3.
Crossref
Cen-Ying Lee, Heap-Yih Chong & Xiangyu Wang. (2016) Streamlining Digital Modeling and Building Information Modelling (BIM) Uses for the Oil and Gas Projects. Archives of Computational Methods in Engineering 25:2, pages 349-396.
Crossref
Xiao LiGeoffrey Qiping ShenPeng WuHongqin FanHengqin WuYue Teng. (2018) RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production. Journal of Management in Engineering 34:2.
Crossref
John Reyes, Darwin Aldás, Edisson Salazar, Evelyn Armendáriz, Kevin Álvarez, José Núñez & Mario García. (2017) Finite Progressive Planning for the Assembly Process in Footwear. IOP Conference Series: Materials Science and Engineering 212, pages 012020.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.