1,741
Views
42
CrossRef citations to date
0
Altmetric
Articles

Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality

, , , , &
Pages 502-514 | Received 02 Dec 2018, Accepted 02 May 2019, Published online: 05 Jun 2019

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Christopher Rausch, Ruodan Lu, Saeed Talebi & Carl Haas. (2023) Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management 23:3, pages 565-578.
Read now

Articles from other publishers (40)

Hyunjun Kim, Ju-Yong Kim & Yoonseok Shin. (2024) Reverse Engineering of Building Layout Plan through Checking the Setting out of a Building on a Site Using 3D Laser Scanning Technology for Sustainable Building Construction: A Case Study. Sustainability 16:8, pages 3278.
Crossref
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa & Aparna Samaraweera. (2024) Enhancing supply chain resilience in offsite construction through the procurement strategy: a systematic literature review. Construction Innovation.
Crossref
Sergio Zabala-Vargas, María Jaimes-Quintanilla & Miguel Hernán Jimenez-Barrera. (2023) Big Data, Data Science, and Artificial Intelligence for Project Management in the Architecture, Engineering, and Construction Industry: A Systematic Review. Buildings 13:12, pages 2944.
Crossref
Jan Stindt, Alex Maximilian Frey, Patrick Forman, Gisela Lanza & Peter Mark. (2023) Toleranzfreie Montage modularer Betontragwerke. Bautechnik.
Crossref
Yangze LiangGuangyao ChenSihao LiZhao Xu. (2023) Intelligent Defect Diagnosis of Appearance Quality for Prefabricated Concrete Components Based on Target Detection and Multimodal Fusion Decision. Journal of Computing in Civil Engineering 37:6.
Crossref
Clyde Zhengdao Li, Shuo Li, Yingyi Ya & Vivian W.Y. Tam. (2023) Digital inspection techniques of modular integrated construction. Heliyon 9:11, pages e21399.
Crossref
Mengkai Liu & Yuyao Chen. (2023) Research on the tripartite evolution strategy of prefabricated building promotion based on the deepening of demand-side interests. PLOS ONE 18:9, pages e0290299.
Crossref
Cheng Fan, Deng Binchao & Yilin Yin. (2022) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: an integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management 30:7, pages 2991-3013.
Crossref
Kaveh Mirzaei, Mehrdad Arashpour, Ehsan Asadi, Haibo Feng, Saeed Reza Mohandes & Milad Bazli. (2023) Automatic compliance inspection and monitoring of building structural members using multi-temporal point clouds. Journal of Building Engineering 72, pages 106570.
Crossref
SeungYeon Lee, YeEun Jang, June-Seong YiJeongWook Son. (2023) Identifying Critical Risk Factors and Management Activities for Effective Offsite Construction Projects during Construction Phase. Journal of Management in Engineering 39:4.
Crossref
Matej Mihić, Zvonko Sigmund, Ivica Završki & Lana Lovrenčić Butković. (2023) An Analysis of Potential Uses, Limitations and Barriers to Implementation of 3D Scan Data for Construction Management-Related Use—Are the Industry and the Technical Solutions Mature Enough for Adoption?. Buildings 13:5, pages 1184.
Crossref
Ankit ShringiMehrdad Arashpour, Tim DwyerArnaud Prouzeau & Heng Li. (2023) Safety in Off-Site Construction: Simulation of Crane-Lifting Operations Using VR and BIM. Journal of Architectural Engineering 29:1.
Crossref
Syed Saad, Wesam Salah Alaloul, Syed Ammad & Abdul Hannan Qureshi. (2021) A qualitative conceptual framework to tackle skill shortages in offsite construction industry: a scientometric approach. Engineering, Construction and Architectural Management 29:10, pages 3917-3947.
Crossref
Ankit Shringi, Mehrdad Arashpour, Emadaldin Mohammadi Golafshani, Abbas Rajabifard, Tim Dwyer & Heng Li. (2022) Efficiency of VR-Based Safety Training for Construction Equipment: Hazard Recognition in Heavy Machinery Operations. Buildings 12:12, pages 2084.
Crossref
Darmicka Sukanthan Rajendra, Carol K. H. Hon, Karen Manley, Fiona Lamari & Martin Skitmore. (2022) Key Dimensions of the Technical Readiness of Small Construction Businesses That Determine Their Intention to Use ICTs. Journal of Management in Engineering 38:6.
Crossref
YeEun Jang, JeongWook Son & June-Seong Yi. (2022) BIM-Based Management System for Off-Site Construction Projects. Applied Sciences 12:19, pages 9878.
Crossref
Christopher Rausch, Saeed Talebi, Mani Poshdar, Beidi Li & Carl Schultz. (2022) Tolerance management domain model for semantic enrichment of BIMs. Automation in Construction 141, pages 104394.
Crossref
Maryam Alkaissy, Mehrdad ArashpourMehran ZeynalianHeng Li. (2022) Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes. Journal of Construction Engineering and Management 148:6.
Crossref
J. Lerche, S. Lorentzen, P. Enevoldsen & H.H. Neve. (2022) The impact of COVID -19 on offshore wind project productivity – A case study. Renewable and Sustainable Energy Reviews 158, pages 112188.
Crossref
Hosang Hyun, Hyung-Geun Kim & Jin-Sung Kim. (2022) Integrated Off-Site Construction Design Process including DfMA Considerations. Sustainability 14:7, pages 4084.
Crossref
Ahsan Nawaz, Jian Chen, Xing Su & Hafiz Muhammad Zahid Hassan. (2022) Material Based Penalty-Cost Quantification Model for Construction Projects Influencing Waste Management. Frontiers in Environmental Science 10.
Crossref
Safoura Salehi, Mehrdad Arashpour, Jayantha Kodikara & Ross Guppy. (2022) Comparative life cycle assessment of reprocessed plastics and commercial polymer modified asphalts. Journal of Cleaner Production 337, pages 130464.
Crossref
Sadith Chinthaka Vithanage, Michael C. P. SingPeter DavisMohammad Tanvi Newaz. (2022) Assessing the Off-Site Manufacturing Workers’ Influence on Safety Performance: A Bayesian Network Approach. Journal of Construction Engineering and Management 148:1.
Crossref
Jon Lerche, Søren Lindhard, Peter Enevoldsen, Arumugam Velaayudan, Jochen Teizer, Hasse H. Neve & Søren Wandahl. (2022) What can be learned from variability in offshore wind projects. Energy Strategy Reviews 39, pages 100794.
Crossref
Chao Wu, Yongbo Yuan, Yang Tang & Boquan Tian. (2021) Application of Terrestrial Laser Scanning (TLS) in the Architecture, Engineering and Construction (AEC) Industry. Sensors 22:1, pages 265.
Crossref
Mudan Wang, Cynthia Changxin Wang, Sisi Zlatanova, Samad Sepasgozar & Mitko Aleksandrov. (2021) Onsite Quality Check for Installation of Prefabricated Wall Panels Using Laser Scanning. Buildings 11:9, pages 412.
Crossref
Mohamed Hussein, Abdelrahman E.E. Eltoukhy, Ahmed Karam, Ibrahim A. Shaban & Tarek Zayed. (2021) Modelling in off-site construction supply chain management: A review and future directions for sustainable modular integrated construction. Journal of Cleaner Production 310, pages 127503.
Crossref
Saeed Talebi, Lauri KoskelaPatricia Tzortzopoulos, Michail KagioglouChris Rausch, Faris ElghaishMani Poshdar. (2021) Causes of Defects Associated with Tolerances in Construction: A Case Study. Journal of Management in Engineering 37:4.
Crossref
Mark Francis, Ron Fisher & Malin Song. (2021) Conceptions of quality as family resemblances. International Journal of Quality and Service Sciences 13:2, pages 282-299.
Crossref
Guofeng Ma, Ming Wu, Zhijiang Wu & Wenjing Yang. (2021) Single-shot multibox detector- and building information modeling-based quality inspection model for construction projects. Journal of Building Engineering 38, pages 102216.
Crossref
Ru Wang & Hong Zhou. (2021) Research on the Control Method of Installation Deviation of Prefabricated Exterior Wall Panels. Research on the Control Method of Installation Deviation of Prefabricated Exterior Wall Panels.
Maria Rashidi, Masoud Mohammadi, Saba Sadeghlou Kivi, Mohammad Mehdi Abdolvand, Linh Truong-Hong & Bijan Samali. (2020) A Decade of Modern Bridge Monitoring Using Terrestrial Laser Scanning: Review and Future Directions. Remote Sensing 12:22, pages 3796.
Crossref
Mudan Wang, Cynthia Changxin Wang, Samad Sepasgozar & Sisi Zlatanova. (2020) A Systematic Review of Digital Technology Adoption in Off-Site Construction: Current Status and Future Direction towards Industry 4.0. Buildings 10:11, pages 204.
Crossref
Seyed Armin Mirhosseini, Reza Kiani Mavi, Neda Kiani Mavi, Behzad Abbasnejad & Farzaneh Rayani. (2020) Interrelations among Leadership Competencies of BIM Leaders: A Fuzzy DEMATEL-ANP Approach. Sustainability 12:18, pages 7830.
Crossref
Sungjin Kim, Javier IrizarryRuth Kanfer. (2020) Multilevel Goal Model for Decision-Making in UAS Visual Inspections in Construction and Infrastructure Projects. Journal of Management in Engineering 36:4.
Crossref
Saeed Talebi, Lauri Koskela, Patricia Tzortzopoulos, Michail Kagioglou & Alex Krulikowski. (2020) Deploying Geometric Dimensioning and Tolerancing in Construction. Buildings 10:4, pages 62.
Crossref
Lizi LuoXin Jin, Geoffrey Qiping Shen, Yingjie WangXin LiangXiao LiClyde Zhengdao Li. (2020) Supply Chain Management for Prefabricated Building Projects in Hong Kong. Journal of Management in Engineering 36:2.
Crossref
Guofeng Ma, Jianyao Jia, Tiancheng Zhu & Shan Jiang. (2019) A Critical Design Structure Method for Project Schedule Development under Rework Risks. Sustainability 11:24, pages 7229.
Crossref
Tatjana Vilutiene, Diana Kalibatiene, M. Reza Hosseini, Eugenio Pellicer & Edmundas Kazimieras Zavadskas. (2019) Building Information Modeling (BIM) for Structural Engineering: A Bibliometric Analysis of the Literature. Advances in Civil Engineering 2019, pages 1-19.
Crossref
Sheng’en Liu, Hui Yi, Xiangning Chen, Decheng Wang & Wei Jin. (2019) Multifaceted Geometric Assessment towards Simplified Urban Surfaces Built by 3D Reconstruction. ISPRS International Journal of Geo-Information 8:8, pages 360.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.