Nguyen Van Tam. (2024) Impact of self-efficacy on construction labor productivity: the mediating role of work motivation. Engineering, Construction and Architectural Management.
Crossref
James T. O'Connor, Fernanda Leite & Jong Won Ma. (2022) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation 23:5, pages 939-960.
Crossref
Pinki Deb & Kh. Lakshman Singh. (2022) Experimental Investigation on the Mechanical Performance of Cold Mix Asphalt Using Construction Demolition Waste as Filler. International Journal of Pavement Research and Technology 16:6, pages 1618-1635.
Crossref
Oluseyi Julius Adebowale & Justus Ngala Agumba. (2023) Construction SMEs labour productivity: causal layered analysis. Journal of Engineering, Design and Technology.
Crossref
Solmaz Ahmadzadeh Amid, Esmatullah Noorzai & Mahmood Golabchi. (2022) Identifying factors affecting waste production throughout the construction project life cycle and proposing BIM-based solutions. The TQM Journal 35:6, pages 1449-1470.
Crossref
Uche Emmanuel Edike. (2021) Material management practices and factors influencing material conservation on construction sites in Nigeria. Journal of Engineering, Design and Technology 21:4, pages 1197-1211.
Crossref
Argaw Tarekegn Gurmu. (2023) Preconstruction Phase Management Practices Enhancing Labor Productivity in Multistory Building Projects. Journal of Construction Engineering and Management 149:6.
Crossref
Ha Duy Khanh, Soo Yong Kim & Le Quoc Linh. (2022) Construction productivity prediction through Bayesian networks for building projects: case from Vietnam. Engineering, Construction and Architectural Management 30:5, pages 2075-2100.
Crossref
Soraya Nassri, Saeed Talebi, Faris Elghaish, Kayvan Koohestani, Stephen McIlwaine, M. Reza Hosseini, Mani Poshdar & Michail Kagioglou. (2021) Labor waste in housing construction projects: an empirical study. Smart and Sustainable Built Environment 12:2, pages 325-340.
Crossref
Bao Pham Van & Vachara Peansupap. (2023) Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management.
Crossref
Mohammed Rady, Ahmed Farouk Kineber, Mohammed Magdy Hamed & Ahmed Osama Daoud. (2023) Partial Least Squares Structural Equation Modeling of Constraint Factors Affecting Project Performance in the Egyptian Building Industry. Mathematics 11:3, pages 497.
Crossref
Tshweu Given Masoetsa, Babatunde Fatai Ogunbayo, Clinton Ohis Aigbavboa & Bankole Osita Awuzie. (2022) Assessing Construction Constraint Factors on Project Performance in the Construction Industry. Buildings 12:8, pages 1183.
Crossref
Ryan HeatonHector Martin, Aaron Chadee, Amrita MillingSian DunneFiona Borthwick. (2022) The Construction Materials Conundrum: Practical Solutions to Address Integrated Supply Chain Complexities. Journal of Construction Engineering and Management 148:8.
Crossref
Aliyeh Kazemi, Eun-Seok Kim & Mohammad-Hossein Kazemi. (2020) Identifying and prioritizing delay factors in Iran’s oil construction projects. International Journal of Energy Sector Management 15:3, pages 476-495.
Crossref
Ilia Farahani & Shadi Yousefi. (2021) Public housing, intersectoral competition, and urban ground rent: Iran’s first public housing program that never was. Human Geography 14:1, pages 45-61.
Crossref
D. K. Choudhury. (2021) Modelling of Materials Management System for Cross-country Pipeline Project from Client’s Perspective. Metamorphosis: A Journal of Management Research 19:2, pages 106-120.
Crossref
Ewelina Kania, Elżbieta Radziszewska-Zielina & Grzegorz Śladowski. (2020) Communication and Information Flow in Polish Construction Projects. Sustainability 12:21, pages 9182.
Crossref
Saurav Dixit & Kaaraayaarthi Sharma. 2020. Emerging Trends in Civil Engineering. Emerging Trends in Civil Engineering
121
129
.
Sulaiman Hasim, Mohd Azrizal Fauzi, Intan Rohani Endut, Zulkiflee Yusof & Ahmad Ruslan Mohd Ridzuan. 2020. ICACE 2019. ICACE 2019
53
59
.
Nor Janna Tammy, Muhammad Mazasry Medani, Rozaini Ramli, Juzailah Nur Yunus & Raja Nor Husna Raja Mohd Noor. 2020. Proceedings of AICCE'19. Proceedings of AICCE'19
1549
1561
.
Majid Parchami Jalal & Shahab Shoar. (2019) A hybrid framework to model factors affecting construction labour productivity. Journal of Financial Management of Property and Construction 24:3, pages 630-654.
Crossref
Saurav Dixit, Satya N. Mandal, Joseph V. Thanikal & Kinshuk Saurabh. (2019) Evolution of studies in construction productivity: A systematic literature review (2006–2017). Ain Shams Engineering Journal 10:3, pages 555-564.
Crossref
Svetlana Besklubova & Xueqing Zhang. (2019) Improving Construction Productivity by Integrating the Lean Concept and the Clancey Heuristic Model. Sustainability 11:17, pages 4535.
Crossref
Patraporn Pornthepkasemsant & Santi Charoenpornpattana. (2019) Identification of factors affecting productivity in Thailand’s construction industry and proposed maturity model for improvement of the productivity. Journal of Engineering, Design and Technology 17:5, pages 849-861.
Crossref
Nima Gerami Seresht & Aminah Robinson Fayek. (2019) Factors influencing multifactor productivity of equipment-intensive activities. International Journal of Productivity and Performance Management 69:9, pages 2021-2045.
Crossref
Serdar Durdyev & M. Reza Hosseini. (2019) Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business 13:1, pages 20-46.
Crossref
Rintih Prastianing Atas Kasih & Tri Joko Wahyu Adi. (2019) Construction project productivity assesment model and its implementation in Indonesia construction industry. MATEC Web of Conferences 258, pages 02026.
Crossref
Nima Gerami SereshtAminah Robinson Fayek. (2018) Dynamic Modeling of Multifactor Construction Productivity for Equipment-Intensive Activities. Journal of Construction Engineering and Management 144:9.
Crossref
Abid Hasan, Bassam Baroudi, Abbas Elmualim & Raufdeen Rameezdeen. (2018) Factors affecting construction productivity: a 30 year systematic review. Engineering, Construction and Architectural Management 25:7, pages 916-937.
Crossref
Kiyanoosh Golchin Rad & Soo-Yong Kim. (2018) Factors Affecting Construction Labor Productivity: Iran Case Study. Iranian Journal of Science and Technology, Transactions of Civil Engineering 42:2, pages 165-180.
Crossref
Mostafa KhanzadiFarnad NasirzadehMohammad Saleh Dashti. (2018) Fuzzy Cognitive Map Approach to Analyze Causes of Change Orders in Construction Projects. Journal of Construction Engineering and Management 144:2.
Crossref
Tareq Khaleel & Yasser Nassar. (2018) Identification and analysis of factors affecting labour productivity in Iraq. MATEC Web of Conferences 162, pages 02032.
Crossref
Bahareh Nikmehr, M. Reza Hosseini, Raufdeen Rameezdeen, Nicholas Chileshe, Parviz Ghoddousi & Mehrdad Arashpour. (2017) An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management 24:6, pages 1246-1268.
Crossref
Saeed Fatemi & Reza Imaninasab. (2016) Performance evaluation of recycled asphalt mixtures by construction and demolition waste materials. Construction and Building Materials 120, pages 450-456.
Crossref
Xiaodong Li, Kwan Hang Chow, Yimin Zhu & Ying Lin. (2016) Evaluating the impacts of high-temperature outdoor working environments on construction labor productivity in China: A case study of rebar workers. Building and Environment 95, pages 42-52.
Crossref
Gholamreza HeraviEhsan Eslamdoost. (2015) Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity. Journal of Construction Engineering and Management 141:10.
Crossref
Parviz Ghoddousi, Omid Poorafshar, Nicholas Chileshe & M. Reza Hosseini. (2015) Labour productivity in Iranian construction projects. International Journal of Productivity and Performance Management 64:6, pages 811-830.
Crossref
Paul John Kulemeka, Grant Kululanga & Danny Morton. (2015) Critical Factors Inhibiting Performance of Small- and Medium-Scale Contractors in Sub-Saharan Region: A Case for Malawi. Journal of Construction Engineering 2015, pages 1-17.
Crossref
Patraporn Porntepkasemsant & Santi Charoenpornpattana. (2015) Factor affecting construction labor productivity in Thailand. Factor affecting construction labor productivity in Thailand.
Parviz Ghoddousi and, Behzad T. Alizadeh, M. Reza Hosseini & Nicholas Chileshe. (2014) Implementing the international benchmarking labour productivity theoretical model. Benchmarking: An International Journal 21:6, pages 1041-1061.
Crossref
R. Ibrahim, A. Rashidi, N. S. Said & M. S. Othman. (2014) Engaging Capability Training in Serious Game Technology for Delivering Industrialized Construction. Engaging Capability Training in Serious Game Technology for Delivering Industrialized Construction.
Khaled Mahmoud El-GoharyRemon Fayek Aziz. (2014) Factors Influencing Construction Labor Productivity in Egypt. Journal of Management in Engineering 30:1, pages 1-9.
Crossref
Ibrahim Mahamid. (2013) Contractors perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management 20:5, pages 446-460.
Crossref
Fara Diva Mustapa, Muzani Mustapa, Mohd Saidin Misnan & Syamsul Hendra Mahmud. (2012) ICT adoption in materials management among construction firms in construction industry. ICT adoption in materials management among construction firms in construction industry.
Mustafa Oral, Emel Laptali Oral & Ahmet Aydın. (2012) Supervised vs. unsupervised learning for construction crew productivity prediction. Automation in Construction 22, pages 271-276.
Crossref
Narimah Kasim. (2011) ICT Implementation for Materials Management in Construction Projects: Case Studies. Journal of Construction Engineering and Project Management 1:1, pages 31-36.
Crossref
Emel Laptali Oral & Mustafa Oral. (2010) Predicting construction crew productivity by using Self Organizing Maps. Automation in Construction 19:6, pages 791-797.
Crossref
Shahriyar Mojahed & Fereydoun Aghazadeh. (2008) Major factors influencing productivity of water and wastewater treatment plant construction: Evidence from the deep south USA. International Journal of Project Management 26:2, pages 195-202.
Crossref
Paul W. Chan & Ammar Kaka. (2007) Productivity improvements: understand the workforce perceptions of productivity first. Personnel Review 36:4, pages 564-584.
Crossref
H. Alinaitwe, J.A. Mwakali & B. Hansson. 2006. Proceedings from the International Conference on Advances in Engineering and Technology. Proceedings from the International Conference on Advances in Engineering and Technology
277
284
.
M.R. Abdul Kadir, W.P. Lee, M.S. Jaafar, S.M. Sapuan & A.A.A. Ali. (2005) Factors affecting construction labour productivity for Malaysian residential projects. Structural Survey 23:1, pages 42-54.
Crossref