821
Views
100
CrossRef citations to date
0
Altmetric
Original Articles

The use of artificial neural networks in construction management: a review

Pages 427-436 | Published online: 21 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

Aaditya Pratap Sanyal & Shankha Pratim Bhattacharya. (2024) A comparative analysis between CBR based prediction models and MRA models for high-rise construction delay prediction. International Journal of Construction Management 24:2, pages 124-136.
Read now
J. L. Dias, A. Silva, C. Chai, P. L. Gaspar & J. de Brito. (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information 42:3, pages 371-380.
Read now
A. Silva, J. L. Dias, P. L. Gaspar & J. de Brito. (2011) Service life prediction models for exterior stone cladding. Building Research & Information 39:6, pages 637-653.
Read now
S. Umit Dikmen & Murat Sonmez. (2011) An Artificial Neural Networks Model for the Estimation of Formwork Labour. Journal of Civil Engineering and Management 17:3, pages 340-347.
Read now
John Rooke, Ella-Mae Molloy, Murray Sinclair, Lauri Koskela, Mohan Siriwardena, Mike Kagioglou & Carys Siemieniuch. (2008) Models and metaphors: complexity theory and through-life management in the built environment. Architectural Engineering and Design Management 4:1, pages 47-57.
Read now
Krzysztof Schabowicz & Bozena Hola. (2007) Mathematical‐neural model for assessing productivity of earthmoving machinery. Journal of Civil Engineering and Management 13:1, pages 47-54.
Read now
Obaid Saad Al‐Sobiei, David Arditi & Gul Polat. (2005) Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Construction Management and Economics 23:4, pages 423-430.
Read now
A.H. Boussabaine & A.P. Kaka. (1998) A neural networks approach for cost flow forecasting. Construction Management and Economics 16:4, pages 471-479.
Read now

Articles from other publishers (91)

Parth PatelD. V. PatelV. H. LadK. A. PatelD. A. Patel. (2024) Predicting Construction Crew Productivity for Concrete-Pouring Operations. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 16:2.
Crossref
Rita AwwadMohamed S. EidAmr Mekki. (2024) An Agent-Based Modeling Approach for Evaluating Dynamic Risk Behavior in Competitive Bidding. An Agent-Based Modeling Approach for Evaluating Dynamic Risk Behavior in Competitive Bidding.
Mohamed Marzouk, Ahmed Elhakeem & Kareem Adel. (2024) Artificial neural networks applications in construction and building engineering (1991–2021): Science mapping and visualization. Applied Soft Computing 152, pages 111174.
Crossref
Ramin Kazemi & Aliakbar Gholampour. (2023) Evaluating the rapid chloride permeability of self-compacting concrete containing fly ash and silica fume exposed to different temperatures: An artificial intelligence framework. Construction and Building Materials 409, pages 133835.
Crossref
Ramin Kazemi & M.Z. Naser. (2023) Towards sustainable use of foundry by-products: Evaluating the compressive strength of green concrete containing waste foundry sand using hybrid biogeography-based optimization with artificial neural networks. Journal of Building Engineering 76, pages 107252.
Crossref
Xinying Zhang, Yuanqing Wang, Yanan Gao, Yuanyuan Liu & Shuo Feng. (2023) Evaluation and Improvement of Employee Performance with respect to Health, Safety, and Environment (HSE) Factors: A Case of Complex Transport Construction Project. Computational Intelligence and Neuroscience 2023, pages 1-20.
Crossref
Subir Kumar PodderVishal Anand Jha. (2023) Application of ANN Model to Determine Primary Drivers of Road Construction Cost. Application of ANN Model to Determine Primary Drivers of Road Construction Cost.
Qasim Zaheer, Mir Majaid Manzoor & Muhammad Jawad Ahamad. (2023) A review on developing optimization techniques in civil engineering. Engineering Computations 40:2, pages 348-377.
Crossref
Khoshnaw Y.B. HusseinSergey A. BolotinNadim Q.R. НurainiHaitham Boxan. (2023) Regression rationing of labour costs based on the estimation of their actual values by neural network modelling. Vestnik MGSU:4, pages 638-650.
Crossref
Emad S. Bakhoum, Arsani Amir, Fady Osama & Mohamed Adel. (2023) Prediction model for the compressive strength of green concrete using cement kiln dust and fly ash. Scientific Reports 13:1.
Crossref
Jianling Huang, Xiaoye Zeng, Jing Fu, Yang Han & Huihua Chen. (2022) Safety Risk Assessment Using a BP Neural Network of High Cutting Slope Construction in High-Speed Railway. Buildings 12:5, pages 598.
Crossref
Ying Hong, Ahmed W.A. Hammad & Ali Akbar Nezhad. (2022) Optimising the implementation of BIM: A 2-stage stochastic programming approach. Automation in Construction 136, pages 104170.
Crossref
Rita AwwadWiam El Irani. (2022) Adaptation of a Contractor’s Risk Behavior in a Competitive Bidding Environment. Adaptation of a Contractor’s Risk Behavior in a Competitive Bidding Environment.
Vassilis Panopoulos, Apostolos Bougas, Borja Garcia de Soto & Bryan T Adey. (2022) Using Bayesian networks to estimate bridge characteristics in early road designs. Infrastructure Asset Management 9:1, pages 40-56.
Crossref
Khalegh BaratiXuesong ShenNan LiDavid G. Carmichael. (2022) Automatic Mass Estimation of Construction Vehicles by Modeling Operational and Engine Data. Journal of Construction Engineering and Management 148:3.
Crossref
Iwona Foryś. (2022) Machine learning in house price analysis: regression models versus neural networks. Procedia Computer Science 207, pages 435-445.
Crossref
Jeri Adin Ardani, Christiono Utomo, Yani Rahmawati & Cahyono Bintang Nurcahyo. 2022. Proceedings of the 5th International Conference on Sustainable Civil Engineering Structures and Construction Materials. Proceedings of the 5th International Conference on Sustainable Civil Engineering Structures and Construction Materials 1273 1286 .
A. Silva & J. de Brito. (2021) Service life of building envelopes: A critical literature review. Journal of Building Engineering 44, pages 102646.
Crossref
Shicheng Liu, Ruidong Chang, Jian Zuo, Ronald J. Webber, Feng Xiong & Na Dong. (2021) Application of Artificial Neural Networks in Construction Management: Current Status and Future Directions. Applied Sciences 11:20, pages 9616.
Crossref
Ding Tan, Xingyu Xu, Kaixiang Yu, Sihai Zhang & Tianchi Chen. (2021) Multi-Feature Shuffle Algorithm for Root Cause Detection in Semiconductor Manufacturing. Multi-Feature Shuffle Algorithm for Root Cause Detection in Semiconductor Manufacturing.
Tahereh Korouzhdeh, Hamid Eskandari-Naddaf & Ramin Kazemi. (2021) Hybrid artificial neural network with biogeography-based optimization to assess the role of cement fineness on ecological footprint and mechanical properties of cement mortar expose to freezing/thawing. Construction and Building Materials 304, pages 124589.
Crossref
Mykhailo R. Luchko, Nataliia Dziubanovska & Oksana Arzamasova. (2021) Artificial Neural Networks in Export and Import Forecasting: An Analysis of Opportunities. Artificial Neural Networks in Export and Import Forecasting: An Analysis of Opportunities.
Md. Abul Kalam Azad, Abu Reza Md. Towfiqul Islam, Md. Siddiqur Rahman & Kurratul Ayen. (2021) Development of novel hybrid machine learning models for monthly thunderstorm frequency prediction over Bangladesh. Natural Hazards 108:1, pages 1109-1135.
Crossref
Sushreeta Paul, Vijay Kumar & Priyanka Jha. 2021. Applications of Artificial Intelligence in Process Systems Engineering. Applications of Artificial Intelligence in Process Systems Engineering 187 206 .
Ying Hong, Ahmed W.A. Hammad, Ali Akbarnezhad & Mehrdad Arashpour. (2020) A neural network approach to predicting the net costs associated with BIM adoption. Automation in Construction 119, pages 103306.
Crossref
Saraa Naseer Kadhim & Kadhim Raheim Erzaij. (2020) Prediction of the Performance Related to Financial Capabilities Using Multilayer Perceptron. IOP Conference Series: Materials Science and Engineering 870:1, pages 012046.
Crossref
Yousif Babakr Hussein Khoshnaw, Sergey Bolotin, Valeriya Bagulya & Haitham Bohan. (2020) Algorithm for neural network regeneration of labor costs based on the assessment of relevant construction data. IOP Conference Series: Materials Science and Engineering 869:6, pages 062003.
Crossref
Mohamed S. Yamany, Tariq Usman Saeed, Matthew Volovski & Anwaar Ahmed. (2020) Characterizing the Performance of Interstate Flexible Pavements Using Artificial Neural Networks and Random Parameters Regression. Journal of Infrastructure Systems 26:2.
Crossref
Akshay Gavali & Srijeet Halder. (2019) Identifying critical success factors of ERP in the construction industry. Asian Journal of Civil Engineering 21:2, pages 311-329.
Crossref
Pablo MartinezEmad Mohamed, Osama MohsenYasser Mohamed. (2020) Comparative Study of Data Mining Models for Prediction of Bridge Future Conditions. Journal of Performance of Constructed Facilities 34:1.
Crossref
Jiang Shen, Ling-ling Li & Dong-ming Lin. 2020. IE&EM 2019. IE&EM 2019 21 27 .
Ming Shan, Yun Le, Albert P.C. Chan & Yi HuMing Shan, Yun Le, Albert P. C. Chan & Yi Hu. 2020. Corruption in the Public Construction Sector. Corruption in the Public Construction Sector 155 179 .
Giuliano Marella & Valentina Antoniucci. (2019) Time Overrun in Public Works—Evidence from North-East Italy. Sustainability 11:24, pages 7057.
Crossref
Po-Hsun Wang, Gu-Hong Lin & Yu-Cheng Wang. (2019) Application of Neural Networks to Explore Manufacturing Sales Prediction. Applied Sciences 9:23, pages 5107.
Crossref
Aksel Seitllari, Yogesh Shamsunder Kumbargeri, Krishna Prapoorna Biligiri & Ilker Boz. (2019) A soft computing approach to predict and evaluate asphalt mixture aging characteristics using asphaltene as a performance indicator. Materials and Structures 52:5.
Crossref
Alex O. Acheampong & Emmanuel B. Boateng. (2019) Modelling carbon emission intensity: Application of artificial neural network. Journal of Cleaner Production 225, pages 833-856.
Crossref
Ashok Kumar Dwivedi & Usha Chouhan. (2018) Classification of Hot and Cold Recombination Regions in Saccharomyces cerevisiae: Comparative Analysis of Two Machine Learning Techniques. Proceedings of the National Academy of Sciences, India Section A: Physical Sciences 89:2, pages 249-256.
Crossref
Wahyudi P. Utama, Albert P.C. Chan, Hafiz Zahoor, Ran Gao & Dwifitra Y. Jumas. (2019) Making decision toward overseas construction projects. Engineering, Construction and Architectural Management 26:2, pages 285-302.
Crossref
Borja García de Soto, Andreas Bumbacher, Markus Deublein & Bryan T Adey. (2018) Predicting road traffic accidents using artificial neural network models. Infrastructure Asset Management 5:4, pages 132-144.
Crossref
Ming Shan, Yun Le, Kenneth T. W. Yiu, Albert P. C. Chan, Yi Hu & You Zhou. (2018) ASSESSING COLLUSION RISKS IN MANAGING CONSTRUCTION PROJECTS USING ARTIFICIAL NEURAL NETWORK. Technological and Economic Development of Economy 24:5, pages 2003-2025.
Crossref
Olalekan Shamsideen Oshodi & Ka Chi Lam. 2018. Fuzzy Hybrid Computing in Construction Engineering and Management. Fuzzy Hybrid Computing in Construction Engineering and Management 389 411 .
Xianghui Deng, Tian Xu & Rui Wang. (2018) Risk Evaluation Model of Highway Tunnel Portal Construction Based on BP Fuzzy Neural Network. Computational Intelligence and Neuroscience 2018, pages 1-16.
Crossref
Rotimi Boluwatife Abidoye & Albert P.C. Chan. (2017) Artificial neural network in property valuation: application framework and research trend. Property Management 35:5, pages 554-571.
Crossref
S. H. MousaviA. SilvaJ. de BritoA. EkhlassiS. B. Hosseini. (2017) Service Life Prediction of Natural Stone Claddings with an Indirect Fastening System. Journal of Performance of Constructed Facilities 31:4.
Crossref
Ivan LeungMin SongCalvin Kam. (2017) AEC Project Performance Prediction and Validation Using the Artificial Neural Network. AEC Project Performance Prediction and Validation Using the Artificial Neural Network.
Michał Juszczyk. Self-organizing maps application for the clustering of the provinces of Poland according to the construction industry activity. Self-organizing maps application for the clustering of the provinces of Poland according to the construction industry activity.
Xin Hu, Bo Xia, Martin Skitmore & Qing Chen. (2016) The application of case-based reasoning in construction management research: An overview. Automation in Construction 72, pages 65-74.
Crossref
Weisheng Lu, Yi Peng, Xi Chen, Martin Skitmore & Xiaoling Zhang. (2016) The S-curve for forecasting waste generation in construction projects. Waste Management 56, pages 23-34.
Crossref
Farid Mirahadi & Tarek Zayed. (2016) Simulation-based construction productivity forecast using Neural-Network-Driven Fuzzy Reasoning. Automation in Construction 65, pages 102-115.
Crossref
Rita Awwad. (2016) Evolutionary Simulation of Contractors’ Learning and Behavior under Two Bid-Tendering Approaches. Journal of Management in Engineering 32:2.
Crossref
RunZhi JinSangwon HanChangTaek HyunYongwoon Cha. (2016) Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. Journal of Construction Engineering and Management 142:2.
Crossref
Ana Silva, Jorge de Brito & Pedro Lima GasparAna Silva, Jorge de Brito & Pedro Lima Gaspar. 2016. Methodologies for Service Life Prediction of Buildings. Methodologies for Service Life Prediction of Buildings 219 262 .
D. A. PatelK. N. Jha. (2015) Neural Network Approach for Safety Climate Prediction. Journal of Management in Engineering 31:6.
Crossref
Ossama A. Hosny, Mohamed M.G. Elbarkouky & Ahmed Elhakeem. (2015) Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization. Journal of Construction Engineering and Project Management 5:1, pages 11-19.
Crossref
D. A. PatelK. N. Jha. (2015) Neural Network Model for the Prediction of Safe Work Behavior in Construction Projects. Journal of Construction Engineering and Management 141:1.
Crossref
D. A. Patel & K. N. Jha. (2014) Prediction of Safety Climate through a Neural Network. Prediction of Safety Climate through a Neural Network.
Zahir Irani & Muhammad Mustafa Kamal. (2014) Intelligent Systems Research in the Construction Industry. Expert Systems with Applications 41:4, pages 934-950.
Crossref
R. JafarzadehJ. M. InghamS. WilkinsonV. GonzálezA. A. Aghakouchak. (2014) Application of Artificial Neural Network Methodology for Predicting Seismic Retrofit Construction Costs. Journal of Construction Engineering and Management 140:2.
Crossref
Sy Dzung Nguyen, Kieu Nhi Ngo, Quang Thinh Tran & Seung-Bok Choi. (2013) A new method for beam-damage-diagnosis using adaptive fuzzy neural structure and wavelet analysis. Mechanical Systems and Signal Processing 39:1-2, pages 181-194.
Crossref
A. Silva, J.L. Dias, P.L. Gaspar & J. de Brito. (2013) Statistical models applied to service life prediction of rendered façades. Automation in Construction 30, pages 151-160.
Crossref
Hong-Gyu Cho, Kyong-Gon Kim, Jang-Young Kim & Gwang-Hee Kim. (2013) A Comparison of Construction Cost Estimation Using Multiple Regression Analysis and Neural Network in Elementary School Project. Journal of the Korea Institute of Building Construction 13:1, pages 66-74.
Crossref
Kosa Golic. (2013) Application of a Neural Network Model for Solving Prediction Problems in Business Management. Journal of Economics, Business and Management, pages 146-149.
Crossref
Long Le-Hoai, Young Dai Lee & Anh Tuan Nguyen. (2013) Estimating time performance for building construction projects in Vietnam. KSCE Journal of Civil Engineering 17:1, pages 1-8.
Crossref
Carlos Oliveira Cruz & Rui Cunha MarquesCarlos Oliveira Cruz & Rui Cunha Marques. 2013. Infrastructure Public-Private Partnerships. Infrastructure Public-Private Partnerships 21 51 .
Muhammad Salim Javed, Ahmad Kamil Bin Mahmood & Suziah Bt. Sulaiman. (2012) The role of artificial neural network in project performance of Higher Learning Institutions, Pakistan. The role of artificial neural network in project performance of Higher Learning Institutions, Pakistan.
Omer Tatari & Murat Kucukvar. (2011) Cost premium prediction of certified green buildings: A neural network approach. Building and Environment 46:5, pages 1081-1086.
Crossref
Caiyu SunJiuping Xu. (2011) Estimation of Time for Wenchuan Earthquake Reconstruction in China. Journal of Construction Engineering and Management 137:3, pages 179-187.
Crossref
Murat Gunduz, Latif Onur Ugur & Erhan Ozturk. (2011) Parametric cost estimation system for light rail transit and metro trackworks. Expert Systems with Applications 38:3, pages 2873-2877.
Crossref
K. Dutta Roy, B. Thakur, T. S. Konar & S. N. Chakrabarty. (2011) Water supply project feasibilities in fringe areas of Kolkata, India. Drinking Water Engineering and Science 4:1, pages 9-23.
Crossref
K. Dutta Roy, B. Thakur, T. S. Konar & S. N. Chakrabarty. (2010) Rapid evaluation of water supply project feasibility in Kolkata, India. Drinking Water Engineering and Science 3:1, pages 29-42.
Crossref
Li-Chung Chao & Ching-Fa Chien. (2010) A Model for Updating Project S-curve by Using Neural Networks and Matching Progress. Automation in Construction 19:1, pages 84-91.
Crossref
Xin Zhao. (2008) A Study of Corporate Financial Crisis Prediction System: Based on BP Artificial Neural Network. A Study of Corporate Financial Crisis Prediction System: Based on BP Artificial Neural Network.
Nabil El‐Sawalhi, David Eaton & Rifat Rustom. (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre‐qualification model. Construction Innovation 8:4, pages 280-298.
Crossref
K. SCHABOWICZ & B. HOŁA. (2008) Application of artificial neural networks in predicting earthmoving machinery effectiveness ratios. Archives of Civil and Mechanical Engineering 8:4, pages 73-84.
Crossref
Sung-Hoon An, Gwang-Hee Kim & Kyung-In Kang. (2007) A case-based reasoning cost estimating model using experience by analytic hierarchy process. Building and Environment 42:7, pages 2573-2579.
Crossref
Yousheng Cheng & Hani G. Melhem. (2005) Monitoring bridge health using fuzzy case-based reasoning. Advanced Engineering Informatics 19:4, pages 299-315.
Crossref
Obaid Saad Al-SobieiDavid ArditiGul Polat. (2005) Managing Owner’s Risk of Contractor Default. Journal of Construction Engineering and Management 131:9, pages 973-978.
Crossref
Michail Soutos & David J. Lowe. (2005) ProCost — Towards a Powerful Early Stage Cost Estimating Tool. ProCost — Towards a Powerful Early Stage Cost Estimating Tool.
G. Morcous & Z. Lounis. (2005) Prediction of Onset of Corrosion in Concrete Bridge Decks Using Neural Networks and Case‐Based Reasoning. Computer-Aided Civil and Infrastructure Engineering 20:2, pages 108-117.
Crossref
Gwang-Hee Kim, Jie-Eon Yoon, Sung-Hoon An, Hun-Hee Cho & Kyung-In Kang. (2004) Neural network model incorporating a genetic algorithm in estimating construction costs. Building and Environment 39:11, pages 1333-1340.
Crossref
Gwang-Hee Kim, Sung-Hoon An & Kyung-In Kang. (2004) Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Building and Environment 39:10, pages 1235-1242.
Crossref
ROBBY SOETANTO & DAVID G. PROVERBS. (2004) INTELLIGENT MODELS FOR PREDICTING LEVELS OF CLIENT SATISFACTION. Journal of Construction Research 05:02, pages 233-253.
Crossref
Irem DikmenM. Talat Birgonul. (2004) Neural Network Model to Support International Market Entry Decisions. Journal of Construction Engineering and Management 130:1, pages 59-66.
Crossref
Xiaoli Zhang & Jianguo Liu. (2004) Fuzzy neural networks with application to prediction of market prices of residential properties. Fuzzy neural networks with application to prediction of market prices of residential properties.
K. C. Lam, Tiesong Hu, S. O. Cheung, R. K. K. Yuen & Z. M. Deng. (2001) Multi-project cash flow optimization: non-inferior solution through neuro-multiobjective algorithm. Engineering Construction and Architectural Management 8:2, pages 130-144.
Crossref
K.C. LAM, TIESONG HU, S.O. CHEUNG, R.K.K. YUEN & Z.M. DENG. (2001) Multi‐project cash flow optimization: non‐inferior solution through neuro‐multiobjective algorithm. Engineering, Construction and Architectural Management 8:2, pages 130-144.
Crossref
A.H. BOUSSABAINE. (2001) Neurofuzzy modelling of construction projects' duration I: principles. Engineering, Construction and Architectural Management 8:2, pages 104-113.
Crossref
A. H. Boussabaine, R. Thomas & T. M. S. Elhag. (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering Construction and Architectural Management 6:3, pages 213-224.
Crossref
A.H. BOUSSABAINE, R. THOMAS & T.M.S. ELHAG. (1999) Modelling cost‐flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management 6:3, pages 213-224.
Crossref
A.H. Boussabaine. (2016) Artificial Neural Networks for Predicting Noise from Construction Sites. Building Acoustics 4:3, pages 211-221.
Crossref
Rafia Nawaz Awan, Muhammad Usman Hassan, Rafiq M. Choudhry, Saima Ehsan & Sameer Ud Din. (2022) Modeling the Behavior of Construction Workers to Predict Their Propensity for Unsafe Acts. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.