346
Views
30
CrossRef citations to date
0
Altmetric
Original Articles

Construction cost prediction for public school buildings in Jordan

Pages 311-317 | Published online: 21 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Salman Saeidlou & Nikdokht Ghadiminia. (2023) A construction cost estimation framework using DNN and validation unit. Building Research & Information 0:0, pages 1-11.
Read now
Wassim Albalkhy & Rateb Sweis. (2022) Assessing lean construction conformance amongst the second-grade Jordanian construction contractors. International Journal of Construction Management 22:5, pages 900-912.
Read now
Ibrahim Mahamid. (2014) Contractors’ perception of risk factors affecting cost overrun in building projects in Palestine. The IES Journal Part A: Civil & Structural Engineering 7:1, pages 38-50.
Read now
Goh Bee Hua & Teo Ho Pin. (2000) Forecasting construction industry demand, price and productivity in Singapore: the BoxJenkins approach. Construction Management and Economics 18:5, pages 607-618.
Read now

Articles from other publishers (25)

Zainab Hasan Ali & Abbas M. Burhan. (2023) Hybrid machine learning approach for construction cost estimation: an evaluation of extreme gradient boosting model. Asian Journal of Civil Engineering 24:7, pages 2427-2442.
Crossref
Suhair Alkilani & Martin Loosemore. (2022) An investigation of how stakeholders influence construction project performance: a small and medium sized contractor’s perspective in the Jordanian construction industry. Engineering, Construction and Architectural Management.
Crossref
Zainab Hasan Ali, Abbas M. Burhan, Murizah Kassim & Zainab Al-Khafaji. (2022) Developing an Integrative Data Intelligence Model for Construction Cost Estimation. Complexity 2022, pages 1-18.
Crossref
Ran Wang, Vahid Asghari, Clara Man Cheung, Shu-Chien Hsu & Chia-Jung Lee. (2022) Assessing effects of economic factors on construction cost estimation using deep neural networks. Automation in Construction 134, pages 104080.
Crossref
Yi-Kai Juan & Ling-Er Liou. (2021) PREDICTING THE SCHEDULE AND COST PERFORMANCE IN PUBLIC SCHOOL BUILDING PROJECTS IN TAIWAN. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 28:1, pages 51-67.
Crossref
Ja’far A. Aldiabat Al-Btoosh. (2021) Building Information Modelling Technology in Mitigating Cost Overruns and change orders in Construction Projects. Journal of Advanced Sciences and Engineering Technologies 4:1, pages 50-64.
Crossref
Mohammed A.KA. Al-Btoush. (2021) INVESTIGATION ON THE CAUSES AND EFFECTS OF VARIATION ORDERS IN THE CONSTRUCTION PROJECTS IN JORDAN. Journal of Advanced Sciences and Engineering Technologies 4:1, pages 65-73.
Crossref
Wassim Al Balkhy, Rateb Sweis & Zoubeir Lafhaj. (2021) Barriers to Adopting Lean Construction in the Construction Industry—The Case of Jordan. Buildings 11:6, pages 222.
Crossref
Chrispin PettangMarcelline Blanche Manjia & F. Henry Abanda. 2020. Sustainable Infrastructure. Sustainable Infrastructure 264 303 .
Sang Quang Van, Long Le-Hoai & Chau Ngoc Dang. (2019) Predicting implementation cost contingencies for residential construction projects in flood-prone areas. International Journal of Managing Projects in Business 12:4, pages 1097-1119.
Crossref
Sabrinaji Dahmas, Zhongfu Li & Sha Liu. (2019) Solving the Difficulties and Challenges Facing Construction Based on Concurrent Engineering in Yemen. Sustainability 11:11, pages 3146.
Crossref
Mohamed Aldhaheri, Amal Bakchan & Maqsood Ahmad Sandhu. (2018) A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects. Engineering, Construction and Architectural Management 25:9, pages 1226-1252.
Crossref
Chau Ngoc Dang & Long Le-Hoai. (2018) Revisiting storey enclosure method for early estimation of structural building construction cost. Engineering, Construction and Architectural Management 25:7, pages 877-895.
Crossref
Ernest Kissi, Divine Kwaku Ahadzie, Theophilus Adjei-Kumi & Edward Badu. (2017) Rethinking the challenges to the pricing of projects in the Ghanaian construction industry. Journal of Engineering, Design and Technology 15:5, pages 700-719.
Crossref
Murat Gunduz & Mohanad H. A. AbuHassan. (2017) Mapping the Industrial Perception of Delay Data Through Importance Rating. Arabian Journal for Science and Engineering 42:9, pages 3799-3808.
Crossref
Ibrahim Mahamid. (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction 22:2, pages 192-210.
Crossref
Richard Ohene Asiedu, Nana Kena Frempong & Hans Wilhelm Alfen. (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management 24:1, pages 21-39.
Crossref
Chrispin Pettang, Marcelline Blanche Manjia & F. Henry Abanda. 2016. Decision Support for Construction Cost Control in Developing Countries. Decision Support for Construction Cost Control in Developing Countries 28 76 .
Chrispin Pettang, Marcelline Blanche Manjia & F. Henry Abanda. 2016. Decision Support for Construction Cost Control in Developing Countries. Decision Support for Construction Cost Control in Developing Countries 6 27 .
Olusegun Akinsiku, Adeyemi Akintola, Oko Ameh & Ayokunle Ige. (2014) Contributions of the Construction Project Team to Cost Overruns: The Contractors' Perspective. Contributions of the Construction Project Team to Cost Overruns: The Contractors' Perspective.
Ibrahim Mahamid. (2011) Risk matrix for factors affecting time delay in road construction projects: owners' perspective. Engineering, Construction and Architectural Management 18:6, pages 609-617.
Crossref
Matti Siemiatycki. (2008) Managing optimism biases in the delivery of large-infrastructure projects: A corporate performance benchmarking approach. Managing optimism biases in the delivery of large-infrastructure projects: A corporate performance benchmarking approach.
Heng Li, Q.P. Shen & Peter E.D. Love. (2005) Cost modelling of office buildings in Hong Kong: an exploratory study. Facilities 23:9/10, pages 438-452.
Crossref
Ayman H Al-Momani. (2000) Examining service quality within construction processes. Technovation 20:11, pages 643-651.
Crossref
Ayman H. Al-Momani. (2000) Construction delay: a quantitative analysis. International Journal of Project Management 18:1, pages 51-59.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.