Philipp Melchiors, Rainer Kolisch & John J. Kanet. (2024) The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation. Annals of Operations Research.
Crossref
Xichao Su, Rongwei Cui, Changjiu Li, Wei Han & Jie Liu. (2023) A heuristic solution framework for the resource-constrained multi-aircraft scheduling problem with transfer of resources and aircraft. Expert Systems with Applications 228, pages 120430.
Crossref
Mariam Gómez Sánchez, Eduardo Lalla-Ruiz, Alejandro Fernández Gil, Carlos Castro & Stefan Voß. (2023) Resource-constrained multi-project scheduling problem: A survey. European Journal of Operational Research 309:3, pages 958-976.
Crossref
Samer Ben Issa, Raymond A. Patterson & Yiliu Tu. (2021) Solving resource-constrained multi-project environment under different activity assumptions. International Journal of Production Economics 232, pages 107936.
Crossref
Yuanxun Shi, Zongzhan Du & Jianxun Li. (2019) Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem. Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem.
Yanting Wang, Zhengwen He, Louis-Phillipe Kerkhove & Mario Vanhoucke. (2017) On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem. Computers & Industrial Engineering 114, pages 223-234.
Crossref
M. Suresh, Pankaj Dutta & Karuna Jain. (2016) Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times. Asia-Pacific Journal of Operational Research 32:06, pages 1550048.
Crossref
Philipp MelchiorsPhilipp Melchiors. 2015. Dynamic and Stochastic Multi-Project Planning. Dynamic and Stochastic Multi-Project Planning
51
71
.
Philipp MelchiorsPhilipp Melchiors. 2015. Dynamic and Stochastic Multi-Project Planning. Dynamic and Stochastic Multi-Project Planning
19
28
.
Xu Ying Zhu, Kai Hu Hou & Cheng Chen. (2014) Team Organization Model and its Algorithm for a Project under Complex Constraints. Applied Mechanics and Materials 599-601, pages 2134-2138.
Crossref
John M. Nicholas & Herman Steyn. 2012. Project Management for Engineering, Business, and Technology. Project Management for Engineering, Business, and Technology
237
280
.
Fangwei Zhu & Bin Song. (2010) Multiple project scheduling based on an improved hybrid genetic algorithm. Multiple project scheduling based on an improved hybrid genetic algorithm.
Fangwei Zhu, Bin Song & Xuanzheng Liu. (2010) Research on project management mode selection and project organization design of manufacturing enterprise. Research on project management mode selection and project organization design of manufacturing enterprise.
Shu-Shun LiuChang-Jung Wang. (2010) Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow. Journal of Construction Engineering and Management 136:12, pages 1268-1278.
Crossref
Xiaodong Zhang, Jianwei Wang, Le Luo & Yingzi Li. (2010) Real-time task scheduling behavior in agent-based product development process simulation. Real-time task scheduling behavior in agent-based product development process simulation.
Recep Kanit, Omer Ozkan & Murat Gunduz. (2009) Effects of project size and resource constraints on project duration through priority rule-base heuristics. Artificial Intelligence Review 32:1-4, pages 115-123.
Crossref
Po-Han Chen & Seyed Mohsen Shahandashti. (2009) Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Automation in Construction 18:4, pages 434-443.
Crossref
Haibin Liu & Yanbing Wang. (2009) A Method for Multi-project with Resource Constraints Based on Greedy Strategy. A Method for Multi-project with Resource Constraints Based on Greedy Strategy.
Piotr JaśkowskiAnna Sobotka. (2006) Scheduling Construction Projects Using Evolutionary Algorithm. Journal of Construction Engineering and Management 132:8, pages 861-870.
Crossref
Nick G. Blismas, William D. Sher, Antony Thorpe & Andrew N. Baldwin. (2004) Factors influencing project delivery within construction clients’ multi‐project environments. Engineering, Construction and Architectural Management 11:2, pages 113-125.
Crossref
M.Chelaka L. Abeyasinghe, David J. Greenwood & D.Eric Johansen. (2001) An efficient method for scheduling construction projects with resource constraints. International Journal of Project Management 19:1, pages 29-45.
Crossref
Sou-Sen LeuChung-Huei Yang. (1999) GA-Based Multicriteria Optimal Model for Construction Scheduling. Journal of Construction Engineering and Management 125:6, pages 420-427.
Crossref
Sou-Sen LeuAn-Ting ChenChung-Huei Yang. (1999) Fuzzy Optimal Model for Resource-Constrained Construction Scheduling. Journal of Computing in Civil Engineering 13:3, pages 207-216.
Crossref