164
Views
30
CrossRef citations to date
0
Altmetric
Original Articles

Two heuristics for scheduling multiple projects with resource constraints

Pages 325-340 | Published online: 21 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (7)

Yuvraj Gajpal & Ashraf Elazouni. (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics 33:7, pages 531-553.
Read now
Pinar Mizrak & G. Mirac Bayhan. (2006) COMPARATIVE STUDY OF DISPATCHING RULES IN A REAL-LIFE JOB SHOP ENVIRONMENT. Applied Artificial Intelligence 20:7, pages 585-607.
Read now
Piotr Jaśkowski & Anna Sobotka. (2004) Scheduling construction projects with resources accessibility limited and changeable in time. Journal of Civil Engineering and Management 10:4, pages 267-276.
Read now
Huan Neng Chiu & Deng Maw Tsai. (2003) An integer linear programming model and a modified branch and bound algorithm for the project material requirements planning problem. Journal of Information and Optimization Sciences 24:1, pages 151-196.
Read now
Sou-Sen Leu & Tzung-Heng Hung. (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics 20:2, pages 131-141.
Read now
Huan Neng Chiu & Deng Maw Tsai. (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics 20:1, pages 55-66.
Read now
Sou-Sen Leu & Chung-Huei Yang. (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics 17:6, pages 767-776.
Read now

Articles from other publishers (23)

Philipp Melchiors, Rainer Kolisch & John J. Kanet. (2024) The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation. Annals of Operations Research.
Crossref
Xichao Su, Rongwei Cui, Changjiu Li, Wei Han & Jie Liu. (2023) A heuristic solution framework for the resource-constrained multi-aircraft scheduling problem with transfer of resources and aircraft. Expert Systems with Applications 228, pages 120430.
Crossref
Mariam Gómez Sánchez, Eduardo Lalla-Ruiz, Alejandro Fernández Gil, Carlos Castro & Stefan Voß. (2023) Resource-constrained multi-project scheduling problem: A survey. European Journal of Operational Research 309:3, pages 958-976.
Crossref
Samer Ben Issa, Raymond A. Patterson & Yiliu Tu. (2021) Solving resource-constrained multi-project environment under different activity assumptions. International Journal of Production Economics 232, pages 107936.
Crossref
Yuanxun Shi, Zongzhan Du & Jianxun Li. (2019) Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem. Hierarchy Model for Distributed Resource Constrained Multi-project Scheduling Problem.
Yanting Wang, Zhengwen He, Louis-Phillipe Kerkhove & Mario Vanhoucke. (2017) On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem. Computers & Industrial Engineering 114, pages 223-234.
Crossref
M. Suresh, Pankaj Dutta & Karuna Jain. (2016) Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times. Asia-Pacific Journal of Operational Research 32:06, pages 1550048.
Crossref
Philipp MelchiorsPhilipp Melchiors. 2015. Dynamic and Stochastic Multi-Project Planning. Dynamic and Stochastic Multi-Project Planning 51 71 .
Philipp MelchiorsPhilipp Melchiors. 2015. Dynamic and Stochastic Multi-Project Planning. Dynamic and Stochastic Multi-Project Planning 19 28 .
Xu Ying Zhu, Kai Hu Hou & Cheng Chen. (2014) Team Organization Model and its Algorithm for a Project under Complex Constraints. Applied Mechanics and Materials 599-601, pages 2134-2138.
Crossref
John M. Nicholas & Herman Steyn. 2012. Project Management for Engineering, Business, and Technology. Project Management for Engineering, Business, and Technology 237 280 .
Fangwei Zhu & Bin Song. (2010) Multiple project scheduling based on an improved hybrid genetic algorithm. Multiple project scheduling based on an improved hybrid genetic algorithm.
Fangwei Zhu, Bin Song & Xuanzheng Liu. (2010) Research on project management mode selection and project organization design of manufacturing enterprise. Research on project management mode selection and project organization design of manufacturing enterprise.
Shu-Shun LiuChang-Jung Wang. (2010) Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow. Journal of Construction Engineering and Management 136:12, pages 1268-1278.
Crossref
Xiaodong Zhang, Jianwei Wang, Le Luo & Yingzi Li. (2010) Real-time task scheduling behavior in agent-based product development process simulation. Real-time task scheduling behavior in agent-based product development process simulation.
Recep Kanit, Omer Ozkan & Murat Gunduz. (2009) Effects of project size and resource constraints on project duration through priority rule-base heuristics. Artificial Intelligence Review 32:1-4, pages 115-123.
Crossref
Po-Han Chen & Seyed Mohsen Shahandashti. (2009) Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Automation in Construction 18:4, pages 434-443.
Crossref
Haibin Liu & Yanbing Wang. (2009) A Method for Multi-project with Resource Constraints Based on Greedy Strategy. A Method for Multi-project with Resource Constraints Based on Greedy Strategy.
Piotr JaśkowskiAnna Sobotka. (2006) Scheduling Construction Projects Using Evolutionary Algorithm. Journal of Construction Engineering and Management 132:8, pages 861-870.
Crossref
Nick G. Blismas, William D. Sher, Antony Thorpe & Andrew N. Baldwin. (2004) Factors influencing project delivery within construction clients’ multi‐project environments. Engineering, Construction and Architectural Management 11:2, pages 113-125.
Crossref
M.Chelaka L. Abeyasinghe, David J. Greenwood & D.Eric Johansen. (2001) An efficient method for scheduling construction projects with resource constraints. International Journal of Project Management 19:1, pages 29-45.
Crossref
Sou-Sen LeuChung-Huei Yang. (1999) GA-Based Multicriteria Optimal Model for Construction Scheduling. Journal of Construction Engineering and Management 125:6, pages 420-427.
Crossref
Sou-Sen LeuAn-Ting ChenChung-Huei Yang. (1999) Fuzzy Optimal Model for Resource-Constrained Construction Scheduling. Journal of Computing in Civil Engineering 13:3, pages 207-216.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.