233
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

Selection of mobile cranes for building construction projects

Pages 519-527 | Published online: 21 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Anil Sawhney & André Mund. (2001) IntelliCranes: an integrated crane type and model selection system. Construction Management and Economics 19:2, pages 227-237.
Read now

Articles from other publishers (14)

Salman Tariq, Mohamed Hussein, Roy Dong Wang & Tarek Zayed. (2021) Trends and developments of on-site crane layout planning 1983–2020: bibliometric, scientometric and qualitative analyses. Construction Innovation 22:4, pages 1011-1035.
Crossref
Ramtin Azami, Zhen Lei, Ulrich Hermann & Travis Zubick. (2022) A Predictive Analytics Framework for Mobile Crane Configuration Selection in Heavy Industrial Construction Projects. Buildings 12:7, pages 960.
Crossref
Songbo Hu, Yihai Fang & Yu Bai. (2021) Automation and optimization in crane lift planning: A critical review. Advanced Engineering Informatics 49, pages 101346.
Crossref
Serdar Ulubeyli, Volkan Arslan, Ozer Uygun & Ismail Hakki Demir. (2021) Construction Equipment Selection through Scenario-Based FDEA: Truck-Mixer Drums. KSCE Journal of Civil Engineering 25:8, pages 2794-2808.
Crossref
Roy Dong Wang, Tarek Zayed, Wei Pan, Saina Zheng & Salman Tariq. (2021) A system boundary-based critical review on crane selection in building construction. Automation in Construction 123, pages 103520.
Crossref
Xiaoqing Lu, Yuan Fang & Yanjing Zeng. 2021. Proceedings of the 23rd International Symposium on Advancement of Construction Management and Real Estate. Proceedings of the 23rd International Symposium on Advancement of Construction Management and Real Estate 979 991 .
Dirk Briskorn & Michael Dienstknecht. (2018) Survey of quantitative methods in construction. Computers & Operations Research 92, pages 194-207.
Crossref
Aviad Shapira & Albert Ben-David. (2017) Characteristics of Equipment Planning for Multi-Crane Building Construction Sites. Buildings 7:3, pages 81.
Crossref
Kattiya Samee & Jakrapong Pongpeng. (2015) Structural equation model for construction equipment selection and contractor competitive advantages. KSCE Journal of Civil Engineering 20:1, pages 77-89.
Crossref
Donghoon Lee, Jun Young Park, Jongkwan Ho & Sunkuk Kim. (2014) Automatic design algorithms for securing the ground contact stability of mobile cranes. Visualization in Engineering 2:1.
Crossref
Begum Sertyesilisik, Ashley Tunstall & John McLouglin. (2010) An investigation of lifting operations on UK construction sites. Safety Science 48:1, pages 72-79.
Crossref
Aviad ShapiraMarat Goldenberg. (2007) “Soft” Considerations in Equipment Selection for Building Construction Projects. Journal of Construction Engineering and Management 133:10, pages 749-760.
Crossref
Marat GoldenbergAviad Shapira. (2007) Systematic Evaluation of Construction Equipment Alternatives: Case Study. Journal of Construction Engineering and Management 133:1, pages 72-85.
Crossref
Cynthia KingCliff J. Schexnayder. (2002) Tower Crane Selection at Jonathon W. Rogers Surface Water Treatment Plant Expansion. Practice Periodical on Structural Design and Construction 7:1, pages 5-8.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.