88
Views
17
CrossRef citations to date
0
Altmetric
Original Articles

Model formulations for the machine scheduling problem with limited waiting time constraints

&
Pages 225-240 | Received 01 Jul 2005, Published online: 18 Jun 2013

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

Hyeon-Il Kim & Dong-Ho Lee. (2023) Scheduling algorithms for multi-stage flow shops with reworks under overlapped queue time limits. International Journal of Production Research 61:20, pages 6908-6922.
Read now
Vijaya K. Srivastava & Davide Spinello. (2015) A Two-Phase Combined Gradient-Tunneling Based Algorithm for Constrained Integer Programming Problems. Journal of Information and Optimization Sciences 36:4, pages 339-365.
Read now
S.F. Attar, M. Mohammadi, R. Tavakkoli-Moghaddam & S. Yaghoubi. (2014) Solving a new multi-objective hybrid flexible flowshop problem with limited waiting times and machine-sequence-dependent set-up time constraints. International Journal of Computer Integrated Manufacturing 27:5, pages 450-469.
Read now
J. Fondrevelle, A. Oulamara, M.-C. Portmann & A. Allahverdi. (2009) Permutation flow shops with exact time lags to minimise maximum lateness. International Journal of Production Research 47:23, pages 6759-6775.
Read now

Articles from other publishers (13)

Kan Wu, Edward Huang, Mengchang Wang & Meimei Zheng. (2022) Job scheduling of diffusion furnaces in semiconductor fabrication facilities. European Journal of Operational Research 301:1, pages 141-152.
Crossref
Teeradech Laisupannawong, Boonyarit Intiyot & Chawalit Jeenanunta. (2021) Improved Mixed-Integer Linear Programming Model for Short-Term Scheduling of the Pressing Process in Multi-Layer Printed Circuit Board Manufacturing. Mathematics 9:21, pages 2653.
Crossref
Antoine Perraudat, Alexandre Lima, Stephane Dauzere-Peres & Philippe Vialletelle. (2019) A decision support system for a critical time constraint tunnel. A decision support system for a critical time constraint tunnel.
Bailin Wang, Kai Huang & Tieke Li. (2018) Permutation flowshop scheduling with time lag constraints and makespan criterion. Computers & Industrial Engineering 120, pages 1-14.
Crossref
Tahir Majeed, Michael Handschuh & René Meier. 2018. Distributed Computing and Artificial Intelligence, 14th International Conference. Distributed Computing and Artificial Intelligence, 14th International Conference 309 317 .
Alexandre Lima, Valeria Borodin, Stephane Dauzere-Peres & Philippe Vialletelle. (2017) Analyzing different dispatching policies for probability estimation in time constraint tunnels in semiconductor manufacturing. Analyzing different dispatching policies for probability estimation in time constraint tunnels in semiconductor manufacturing.
Yinzhi Zhou & Kan Wu. (2017) Heuristic simulated annealing approach for diffusion scheduling in a semiconductor Fab. Heuristic simulated annealing approach for diffusion scheduling in a semiconductor Fab.
Alexandre Lima, Valeria Borodin, Stéphane Dauzère-Pérès & Philippe Vialletelle. (2017) A decision support system for managing line stops of time constraint tunnels: FA, IE. A decision support system for managing line stops of time constraint tunnels: FA, IE.
Yuanyuan Tan, Zhen Wei, Sen Wang, Wei Zhou & Shixin Liu. (2012) A scatter search for hybrid flow shop problems with transportation. A scatter search for hybrid flow shop problems with transportation.
J. Behnamian & M. Zandieh. (2011) A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties. Expert Systems with Applications 38:12, pages 14490-14498.
Crossref
Bailin Wang & Tieke Li. (2011) A comparison of permutation flowshop scheduling heuristics for limited waiting time constraints. A comparison of permutation flowshop scheduling heuristics for limited waiting time constraints.
Siyi Liu, Jianshuang Cui & Yan Li. (2008) Heuristic-Tabu Algorithm for Hybrid Flowshop Scheduling with Limited Waiting Time. Heuristic-Tabu Algorithm for Hybrid Flowshop Scheduling with Limited Waiting Time.
Tieke Li & Yan Li. (2007) Constructive Backtracking Heuristic for Hybrid Flowshop Scheduling with Limited Waiting Times. Constructive Backtracking Heuristic for Hybrid Flowshop Scheduling with Limited Waiting Times.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.