8
Views
4
CrossRef citations to date
0
Altmetric
Short papers

Operations scheduling for the robot‐centered parallel‐processor workcell

, &
Pages 311-318 | Received 01 Aug 1989, Accepted 14 Sep 1990, Published online: 04 May 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Wu‐Der Jeng & JamesT. Lin. (1993) A branch and bound algorithm for scheduling problem of a robot‐centered manufacturing cell. Journal of the Chinese Institute of Engineers 16:3, pages 431-440.
Read now

Articles from other publishers (3)

Lei Yue, Hao Wang, Jabir Mumtaz, Mudassar Rauf & Zhifu Li. (2023) Energy-efficient scheduling of a two-stage flexible printed circuit board flow shop using a hybrid Pareto spider monkey optimisation algorithm. Journal of Industrial Information Integration 31, pages 100412.
Crossref
Hao Wang, Zailin Guan, Chaoyong Zhang, Lei Yue, Dan Luo & Saif Ullah. (2019) The Printed-Circuit-Board Electroplating Parallel-Tank Scheduling With Hoist and Group Constraints Using a Hybrid Guided Tabu Search Algorithm. IEEE Access 7, pages 61363-61377.
Crossref
Wu-Der Jeng, James T. Lin & Ue-Pyng Wen. (1993) Algorithms for sequencing robot activities in a robot-centered parallel-processor workcell. Computers & Operations Research 20:2, pages 185-197.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.