238
Views
28
CrossRef citations to date
0
Altmetric
Original Articles

Economic lot sizing for an imperfect production system subject to random breakdowns

&
Pages 73-92 | Received 21 Jul 2004, Published online: 25 Jan 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

Ali Salmasnia & Sepideh Dehghani. (2023) A production-inventory model under quality-maintenance policy with rework process in the presence of random failures and multiple assignable causes. International Journal of Modelling and Simulation 43:6, pages 832-848.
Read now
Soroush Aghamohammadi-Bosjin, Masoud Rabbani & Reza Tavakkoli-Moghaddam. (2020) Agile two-stage lot-sizing and scheduling problem with reliability, customer satisfaction and behaviour under uncertainty: a hybrid metaheuristic algorithm. Engineering Optimization 52:8, pages 1323-1343.
Read now
Ya-Hui Lin, Yan-Chun Chen & Wen-Ying Wang. (2017) Optimal production model for imperfect process with imperfect maintenance, minimal repair and rework. International Journal of Systems Science: Operations & Logistics 4:3, pages 229-240.
Read now
W.C. Tsai & Chih-Hsiung Wang. (2017) Extended economic maintenance scheduling for a batch production system. Journal of Information and Optimization Sciences 38:2, pages 219-231.
Read now
Jonas C.P. Yu, Kung-Jeng Wang & Yu-Siang Lin. (2016) Managing dual warehouses with an incentive policy for deteriorating items. International Journal of Systems Science 47:3, pages 586-602.
Read now
L Chwif, J Banks & D R Vieira. (2015) Simulating breakdowns: a taxonomy for modelling. Journal of Simulation 9:1, pages 43-53.
Read now
M. Karimi-Nasab & K. Sabri-Laghaie. (2014) Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection. International Journal of Production Research 52:8, pages 2388-2421.
Read now
Vinod Kumar Mishra & Lal Sahab Singh. (2011) Production inventory model for time dependent deteriorating items with production disruptions. International Journal of Management Science and Engineering Management 6:4, pages 256-259.
Read now
Singa Wang Chiu, Kuang-Ku Chen & Jyh-Chau Yang. (2009) Optimal replenishment policy for manufacturing systems with failure in rework, backlogging and random breakdown. Mathematical and Computer Modelling of Dynamical Systems 15:3, pages 255-274.
Read now

Articles from other publishers (19)

Pankaj Narang, Mamta Kumari & Pijus Kanti De. (2023) A Three-Layer Imperfect Production Supply Chain Model with Green Investment Under Trade Credit and Cap-Trade Policy. Journal of Industrial Integration and Management, pages 1-37.
Crossref
Harish Garg, Chandrasekaran Sugapriya, Vadivelu Kuppulakshmi & Deivanayagampillai Nagarajan. (2023) Optimization of fuzzy inventory lot-size with scrap and defective items under inspection policy. Soft Computing 27:5, pages 2231-2250.
Crossref
Harun Öztürk. (2018) Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs. Operational Research 21:1, pages 167-204.
Crossref
Nita H. Shah, Dushyantkumar G. Patel & Digeshkumar B. Shah. (2016) EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand. Operational Research 18:2, pages 343-359.
Crossref
Jiawen Hu, Zuhua Jiang & Hong Wang. (2017) Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game. Asia-Pacific Journal of Operational Research 34:04, pages 1750012.
Crossref
Nan Li, Felix T. S. Chan, S. H. Chung & Allen H. Tai. (2017) A Stochastic Production-Inventory Model in a Two-State Production System With Inventory Deterioration, Rework Process, and Backordering. IEEE Transactions on Systems, Man, and Cybernetics: Systems 47:6, pages 916-926.
Crossref
N. Li, Felix T. S. Chan, S. H. Chung & Allen H. Tai. (2015) An EPQ Model for Deteriorating Production System and Items with Rework. Mathematical Problems in Engineering 2015, pages 1-10.
Crossref
Shixiong Zhao, Liya Wang & Yu Zheng. (2014) Integrating production planning and maintenance: an iterative method. Industrial Management & Data Systems 114:2, pages 162-182.
Crossref
Yuan-Shyi Peter Chiu & Huei-Hsin Chang. (2014) Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note. Economic Modelling 37, pages 143-148.
Crossref
Yan-Chun Chen. (2013) An optimal production and inspection strategy with preventive maintenance error and rework. Journal of Manufacturing Systems 32:1, pages 99-106.
Crossref
Angus Jeang. (2012) Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown. Omega 40:6, pages 774-781.
Crossref
E. Noorollahi, M. Karimi-Nasab & M.B. Aryanezhad. (2012) An economic production quantity model with random yield subject to process compressibility. Mathematical and Computer Modelling 56:3-4, pages 80-96.
Crossref
Elhadj Zeraoulia. 2011. Models and Applications of Chaos Theory in Modern Sciences. Models and Applications of Chaos Theory in Modern Sciences 290 303 .
Carles Sitompul & El‐Houssaine Aghezzaf. (2011) An integrated hierarchical production and maintenance‐planning model. Journal of Quality in Maintenance Engineering 17:3, pages 299-314.
Crossref
Yuan-Shyi Peter Chiu, Hong-Dar Lin & Huei-Hsin Chang. (2011) Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown. Computers & Industrial Engineering 60:4, pages 576-584.
Crossref
Singa Wang Chiu. (2010) Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Computers & Operations Research 37:5, pages 899-908.
Crossref
Yong He & Ju He. (2010) A Production Model for Deteriorating Inventory Items with Production Disruptions. Discrete Dynamics in Nature and Society 2010, pages 1-14.
Crossref
Yuan-Shyi Peter Chiu, Kuang-Ku Chen, Feng-Tsung Cheng & Mei-Fang Wu. (2010) Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. Computers & Mathematics with Applications 59:2, pages 919-932.
Crossref
Tulika Chakraborty, B.C. Giri & K.S. Chaudhuri. (2009) Production lot sizing with process deterioration and machine breakdown under inspection schedule. Omega 37:2, pages 257-271.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.