309
Views
37
CrossRef citations to date
0
Altmetric
Original Articles

Optimization models for the machine scheduling problem with a single flexible maintenance activity

Pages 53-71 | Received 24 Aug 2004, Published online: 25 Jan 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Weiwei Cui, Huali Sun & Beixin Xia. (2020) Integrating production scheduling, maintenance planning and energy controlling for the sustainable manufacturing systems under TOU tariff. Journal of the Operational Research Society 71:11, pages 1760-1779.
Read now
O. Mashkani & G. Moslehi. (2016) Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints. International Journal of Computer Integrated Manufacturing 29:3, pages 323-341.
Read now
Shijin Wang & Ming Liu. (2013) A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning. International Journal of Production Research 51:3, pages 847-868.
Read now

Articles from other publishers (34)

Samane Babaeimorad, Parviz Fattahi & Hamed Fazlollahtabar. (2021) Integrated maintenance scheduling inventory policy adjustment considering back order disruptions using joint optimization approach. Journal of Quality in Maintenance Engineering 28:4, pages 748-767.
Crossref
Antonio Costa & Victor Fernandez-Viagas. (2022) A modified harmony search for the T-single machine scheduling problem with variable and flexible maintenance. Expert Systems with Applications 198, pages 116897.
Crossref
Pedram Beldar, Milad Moghtader, Adriana Giret & Amir Hossein Ansaripoor. (2022) Non-identical parallel machines batch processing problem with release dates, due dates and variable maintenance activity to minimize total tardiness. Computers & Industrial Engineering 168, pages 108135.
Crossref
Reza Yazdani, Mirpouya Mirmozaffari, Elham Shadkam & Mohammad Taleghani. (2022) Minimizing total absolute deviation of job completion times on a single machine with maintenance activities using a Lion Optimization Algorithm. Sustainable Operations and Computers 3, pages 10-16.
Crossref
Z. Chekoubi, N. Ettahiry, S. Dellagi, Wajdi Trabelsi & I. Majdouline. (2022) Integrated Production and Maintenance Scheduling with Environmental and Operational Considerations. IFAC-PapersOnLine 55:10, pages 1369-1374.
Crossref
Kadir Büyüközkan, Mehmet Emin Baysal, Cahit Yalçın & Ahmet Sarucan. 2022. Intelligent and Fuzzy Systems. Intelligent and Fuzzy Systems 864 869 .
Yu Liu, Qin Zhang, Zhiyuan Ouyang & Hong-Zhong Huang. (2021) Integrated production planning and preventive maintenance scheduling for synchronized parallel machines. Reliability Engineering & System Safety 215, pages 107869.
Crossref
Damla Rana DÜNDAR, İnci SARIÇİÇEK & Ahmet YAZİCİ. (2021) 737 BAKIM FAALİYETLERİNİ DİKKATE ALAN MAKİNE ÇİZELGELEME: LİTERATÜR ARAŞTIRMASI. Uludağ University Journal of The Faculty of Engineering, pages 737-756.
Crossref
Juan Zou & Jinjiang Yuan. (2020) Single-machine scheduling with maintenance activities and rejection. Discrete Optimization 38, pages 100609.
Crossref
Qinming Liu, Ming Dong, F. Frank Chen, Wenyi Liu & Chunming Ye. (2020) Multi-objective imperfect maintenance optimization for production system with an intermediate buffer. Journal of Manufacturing Systems 56, pages 452-462.
Crossref
Xingong Zhang, Shang-Chia Liu, Win-Chin Lin & Chin-Chia Wu. (2020) Parallel-machine scheduling with linear deteriorating jobs and preventive maintenance activities under a potential machine disruption. Computers & Industrial Engineering 145, pages 106482.
Crossref
Ya-Chih Tsai, Jihong Pang & Fuh-Der Chou. 2020. Artificial Intelligence Algorithms and Applications. Artificial Intelligence Algorithms and Applications 488 496 .
Mehdi Iranpoor & S. M. T. Fatemi Ghomi. (2019) Periodic flexible maintenance planning in a single-machine production environment. Journal of Industrial Engineering International 15:4, pages 627-635.
Crossref
Yarong Chen, Ling-Huey Su, Ya-Chih Tsai, Shenquan Huang & Fuh-Der Chou. (2019) Scheduling Jobs on a Single Machine With Dirt Cleaning Consideration to Minimize Total Completion Time. IEEE Access 7, pages 22290-22300.
Crossref
Costa Antonio, Corsini Roberto, Cappadonna F. Antonio & Fichera Sergio. (2018) MILP Models for Scheduling Dynamic Jobs with Sequence Dependent Setup Times and a Variable Maintenance on a Single Machine. Journal of Advances in Applied & Computational Mathematics 5, pages 29-36.
Crossref
Juan Zou & Jin-Jiang Yuan. (2017) Equivalence of Some Different Maintenance Activities in Single-Machine Scheduling. Journal of the Operations Research Society of China 6:4, pages 545-556.
Crossref
Jihong Pang, Hongming Zhou, Ya-Chih Tsai & Fuh-Der Chou. (2018) A scatter simulated annealing algorithm for the bi-objective scheduling problem for the wet station of semiconductor manufacturing. Computers & Industrial Engineering 123, pages 54-66.
Crossref
Zhijun Xu, Dehua Xu, Jie He, Qi Wang, Aihua Liu & Junfang Xiao. (2017) Mixed Integer Programming Formulations for Two-Machine Flow Shop Scheduling with an Availability Constraint. Arabian Journal for Science and Engineering 43:2, pages 777-788.
Crossref
Yunqiang Yin, Yan Wang, T.C.E. Cheng, Wenqi Liu & Jinhai Li. (2017) Parallel-machine scheduling of deteriorating jobs with potential machine disruptions. Omega 69, pages 17-28.
Crossref
Wei-Wei Cui & Zhiqiang Lu. (2017) Minimizing the makespan on a single machine with flexible maintenances and jobs’ release dates. Computers & Operations Research 80, pages 11-22.
Crossref
Ling-Huey Su & Hui-Mei Wang. (2017) Minimizing total absolute deviation of job completion times on a single machine with cleaning activities. Computers & Industrial Engineering 103, pages 242-249.
Crossref
Zhijun Xu, Aihua Liu & Qi Wang. (2016) Mixed 0–1 programming model for three parallel machines scheduling problem with machine-dependent unavailable constraints. Mixed 0–1 programming model for three parallel machines scheduling problem with machine-dependent unavailable constraints.
Bhupesh K. Lad, Divya Shrivastava & Makarand S. Kulkarni. 2016. Machine Tool Reliability. Machine Tool Reliability 277 295 .
Ling Nie, Jiuping Xu & Yan Tu. (2014) Maintenance Scheduling Problem with Fuzzy Random Time Windows on a Single Machine. Arabian Journal for Science and Engineering 40:3, pages 959-974.
Crossref
Wei-Wei Cui, Zhiqiang Lu & Ershun Pan. (2014) Integrated production scheduling and maintenance policy for robustness in a single machine. Computers & Operations Research 47, pages 81-91.
Crossref
Dehua Xu, Aihua Liu & Dar-Li Yang. (2014) Mathematical Programming Models for Competitive Two-Agent Single-Machine Scheduling with Flexible Periodic Maintenance Activities. Arabian Journal for Science and Engineering 39:5, pages 3715-3722.
Crossref
Ershun Pan, Wenzhu Liao & Lifeng Xi. (2011) A joint model of production scheduling and predictive maintenance for minimizing job tardiness. The International Journal of Advanced Manufacturing Technology 60:9-12, pages 1049-1061.
Crossref
Dehua Xu & Yunqiang Yin. (2011) On single-machine scheduling with flexible maintenance activities. The International Journal of Advanced Manufacturing Technology 56:9-12, pages 1139-1145.
Crossref
Shan-lin Yang, Ying Ma, Dong-ling Xu & Jian-bo Yang. (2011) Minimizing total completion time on a single machine with a flexible maintenance activity. Computers & Operations Research 38:4, pages 755-770.
Crossref
Anil Sharma, G.S. Yadava & S.G. Deshmukh. (2011) A literature review and future perspectives on maintenance optimization. Journal of Quality in Maintenance Engineering 17:1, pages 5-25.
Crossref
Chinyao Low, Chou-Jung Hsu & Chwen-Tzeng Su. (2010) A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance. Expert Systems with Applications 37:9, pages 6429-6434.
Crossref
Ershun Pan, Wenzhu Liao & Lifeng Xi. (2010) Single-machine-based production scheduling model integrated preventive maintenance planning. The International Journal of Advanced Manufacturing Technology 50:1-4, pages 365-375.
Crossref
Ling‐Huey Su & Hsiao‐Ling Tsai. (2010) Flexible preventive maintenance planning for two parallel machines problem to minimize makespan. Journal of Quality in Maintenance Engineering 16:3, pages 288-302.
Crossref
Chinyao Low, Min Ji, Chou-Jung Hsu & Chwen-Tzeng Su. (2010) Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Applied Mathematical Modelling 34:2, pages 334-342.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.