45
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

AN OPTIMIZATION METHOD FOR SIMULATING LARGE COMPLEX SYSTEMS

&
Pages 213-229 | Received 06 May 1995, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Mohamed Marzouk & Osama Moselhi. (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics 20:6, pages 535-543.
Read now

Articles from other publishers (11)

Chaojue YiMing Lu. (2017) Planning Rough-Grading Projects: CAT Handbook vs. RS Means. Planning Rough-Grading Projects: CAT Handbook vs. RS Means.
Ali Montaser, Magdy Ibrahim & Osama Moselhi. (2014) Adaptive Forecasting in Earthmoving Operation Using DES and Site Captured Data. Procedia Engineering 85, pages 377-384.
Crossref
Hany Zahran & Khaled Nassar. (2013) Modeling pipeline projects using computer simulation. Modeling pipeline projects using computer simulation.
Sanghyeok KangJongwon Seo. (2013) GIS Method for Haul Road Layout Planning in Large Earthmoving Projects: Framework and Analysis. Journal of Construction Engineering and Management 139:2, pages 236-246.
Crossref
Ali MontaserIbrahim BakryAdel AlshibaniOsama Moselhi. (2012) Estimating productivity of earthmoving operations using spatial technologies 1 This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management. . Canadian Journal of Civil Engineering 39:9, pages 1072-1082.
Crossref
Osama MoselhiAdel Alshibani. (2009) Optimization of Earthmoving Operations in Heavy Civil Engineering Projects. Journal of Construction Engineering and Management 135:10, pages 948-954.
Crossref
Hong Zhang. (2008) Multi-objective simulation-optimization for earthmoving operations. Automation in Construction 18:1, pages 79-86.
Crossref
Hong ZhangC. M. TamHeng LiJonathan Jingsheng Shi. (2006) Particle Swarm Optimization-Supported Simulation for Construction Operations. Journal of Construction Engineering and Management 132:12, pages 1267-1274.
Crossref
Mohamed MarzoukOsama Moselhi. (2004) Multiobjective Optimization of Earthmoving Operations. Journal of Construction Engineering and Management 130:1, pages 105-113.
Crossref
Jonathan Jingsheng Shi. (1999) Activity-Based Construction (ABC) Modeling and Simulation Method. Journal of Construction Engineering and Management 125:5, pages 354-360.
Crossref
B. McCabe. (1998) Belief networks in construction simulation. Belief networks in construction simulation.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.