180
Views
13
CrossRef citations to date
0
Altmetric
Original Articles

Common due date assignment and cumulative deterioration scheduling on a single machine

&
Pages 976-989 | Received 05 Jun 2016, Accepted 11 Aug 2016, Published online: 23 Sep 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Chuanli Zhao & Chou-Jung Hsu. (2019) Fully polynomial-time approximation scheme for single machine scheduling with proportional-linear deteriorating jobs. Engineering Optimization 51:11, pages 1938-1943.
Read now

Articles from other publishers (10)

Qinyu Jin, Shuai Zhang, Jiyuan Xu, Kang Jiang, Yuanzhe Cheng & Wenyu Zhang. (2023) Remanufacturing System Scheduling of Batch Products with the Consideration of Dynamic Changes in Machine Efficiency Using an Improved Artificial Bee Colony Algorithm. Computers & Industrial Engineering, pages 109817.
Crossref
Dvir Shabtay. (2022) A new perspective on single-machine scheduling problems with late work related criteria. Annals of Operations Research 322:2, pages 947-966.
Crossref
Jin Qian & Haiyan Han. (2021) The due date assignment scheduling problem with the deteriorating jobs and delivery time. Journal of Applied Mathematics and Computing 68:4, pages 2173-2186.
Crossref
Wen-Tso Huang, Ping-Shun Chen, Gary Yu-Hsin Chen & Jr-Fong Dang. (2022) The Dynamic Flow Shop Scheduling Problem with JIT Philosophy and Common Due Date. Mathematical Problems in Engineering 2022, pages 1-12.
Crossref
Maziar Yazdani, Kamyar Kabirifar, Amir M. Fathollahi-Fard & Mohammad Mojtahedi. (2021) Production scheduling of off-site prefabricated construction components considering sequence dependent due dates. Environmental Science and Pollution Research.
Crossref
Mehdi Abedi, Raymond Chiong, Nasimul Noman & Rui Zhang. (2020) A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines. Expert Systems with Applications 157, pages 113348.
Crossref
Shi-Sheng Li, Ren-Xia Chen, Qi Feng & Cheng-Wen Jiao. (2019) Parallel-machine scheduling with job-dependent cumulative deterioration effect and rejection. Journal of Combinatorial Optimization 38:3, pages 957-971.
Crossref
Cemal AKTÜRK & Sevinç GÜLSEÇEN. (2019) DETERMINING ORDER DELIVERY DATE BY REVENUE APPROACH: A CASE STUDY WITH NONWOVEN TEXTILE MANUFACTURERS IN TRC1 REGION. Tekstil ve Konfeksiyon 29:2, pages 133-141.
Crossref
Ren-Xia Chen & Shi-Sheng Li. (2018) Two-agent single-machine scheduling with cumulative deterioration. 4OR 17:2, pages 201-219.
Crossref
Mehdi Abedi, Raymond Chiong, Nasimul Noman & Rui Zhang. (2017) A hybrid particle swarm optimisation approach for energy-efficient single machine scheduling with cumulative deterioration and multiple maintenances. A hybrid particle swarm optimisation approach for energy-efficient single machine scheduling with cumulative deterioration and multiple maintenances.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.