447
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups

, &
Pages 1719-1732 | Received 01 Jul 2016, Accepted 03 Nov 2016, Published online: 09 Dec 2016

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Fernando Siqueira de Almeida & Marcelo Seido Nagano. (2023) Heuristics to optimize total completion time subject to makespan in no-wait flow shops with sequence-dependent setup times. Journal of the Operational Research Society 74:1, pages 362-373.
Read now
Chengkuan Zeng, Jiafu Tang, Zhiping Fan & Chongjun Yan. (2019) Auction-based approach for a flexible job-shop scheduling problem with multiple process plans. Engineering Optimization 51:11, pages 1902-1919.
Read now

Articles from other publishers (16)

ZiYan Zhao, MengChu Zhou & ShiXin Liu. (2022) Iterated Greedy Algorithms for Flow-Shop Scheduling Problems: A Tutorial. IEEE Transactions on Automation Science and Engineering 19:3, pages 1941-1959.
Crossref
Nitin Srinath, I. Ozan Yilmazlar, Mary E. Kurz & Kevin Taaffe. (2022) Introducing preferences in scheduling applications. Computers & Industrial Engineering 163, pages 107831.
Crossref
Yunus DEMİR. (2021) Tekrarlı Açgözlü Algoritma Üzerine Kapsamlı Bir AnalizA Comprehensive Analysis on the Iterated Greedy Algorithm. Iğdır Üniversitesi Fen Bilimleri Enstitüsü Dergisi 11:4, pages 2716-2728.
Crossref
Wenjie Wang, Guangdong Tian, Honghao Zhang, Kangkang Xu & Zheng Miao. (2021) Modeling and scheduling for remanufacturing systems with disassembly, reprocessing, and reassembly considering total energy consumption. Environmental Science and Pollution Research.
Crossref
Qazi Salman Khalid, Shakir Azim, Muhammad Abas, Abdur Rehman Babar & Imran Ahmad. (2021) Modified particle swarm algorithm for scheduling agricultural products. Engineering Science and Technology, an International Journal 24:3, pages 818-828.
Crossref
Xiangqi Liu, Jie Chen, Xiaoling Huang, Shanshan Guo, Shuai Zhang & Mengjiao Chen. (2021) A New Job Shop Scheduling Method for Remanufacturing Systems Using Extended Artificial Bee Colony Algorithm. IEEE Access 9, pages 132429-132441.
Crossref
Md. Humyun Fuad Rahman, Ripon K. Chakrabortty & Michael J. Ryan. (2021) Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach. IEEE Access 9, pages 45562-45586.
Crossref
Ripon K. Chakrabortty, Humyun Fuad Rahman, Khan M.A. Haque, Sanjoy Kumar Paul & Michael J. Ryan. (2021) An event-based reactive scheduling approach for the Resource Constrained Project Scheduling Problem with unreliable resources. Computers & Industrial Engineering 151, pages 106981.
Crossref
Lin Liu, Qingfei Zhang & Yun Sha. (2020) Research on Remanufacturing Scheduling optimization with Uncertain Process. Research on Remanufacturing Scheduling optimization with Uncertain Process.
Guanlong Deng, Qingtang Su, Zhiwang Zhang, Huixia Liu, Shuning Zhang & Tianhua Jiang. (2020) A population-based iterated greedy algorithm for no-wait job shop scheduling with total flow time criterion. Engineering Applications of Artificial Intelligence 88, pages 103369.
Crossref
Ziyan Zhao, MengChu Zhou, Shixin Liu, Xiwang Guo & Haoyue Liu. (2020) A Lexicographic Bi-objective Scheduling Problem From Steel Production Systems. IFAC-PapersOnLine 53:5, pages 158-163.
Crossref
Humyun Fuad Rahman & Izabela Nielsen. (2019) Scheduling automated transport vehicles for material distribution systems. Applied Soft Computing 82, pages 105552.
Crossref
Jae-Min Yu & Dong-Ho Lee. (2018) Scheduling algorithms for job-shop-type remanufacturing systems with component matching requirement. Computers & Industrial Engineering 120, pages 266-278.
Crossref
Thomas Stützle & Rubén Ruiz. 2017. Handbook of Heuristics. Handbook of Heuristics 1 31 .
Thomas Stützle & Rubén Ruiz. 2018. Handbook of Heuristics. Handbook of Heuristics 547 577 .
Jong-Min Kim, Yi-Dong Zhou & Dong-Ho Lee. (2017) Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines. The International Journal of Advanced Manufacturing Technology 91:9-12, pages 3697-3708.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.