23
Views
39
CrossRef citations to date
0
Altmetric
Original Articles

Interstage Storages for Three Stage Lines Subject to Stochastic Failures

&
Pages 354-358 | Received 01 Dec 1973, Published online: 09 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (23)

Sophie Weiss, Justus Arne Schwarz & Raik Stolletz. (2019) The buffer allocation problem in production lines: Formulations, solution methods, and instances. IISE Transactions 51:5, pages 456-485.
Read now
TOSHIROU IYAMA & TAKESHI ODAWARA. (1990) A Study of an Automatic Transfer Line System with a Sub-Line. IIE Transactions 22:3, pages 204-214.
Read now
WallaceJ. Hopp, Niranjan Pati & PhilipC. Jones. (1989) Optimal inventory control in a production flow system with failures. International Journal of Production Research 27:8, pages 1367-1384.
Read now
DANIEL SIPPER & REUVEN SHAPIRA. (1989) JIT vs. WIP— a trade-off analysis. International Journal of Production Research 27:6, pages 903-914.
Read now
HENRY D'ANGELO, MICHAEL CARAMANIS, SUSAN FINGER, ANTON MAVRETIC, YANNISA. PHILLIS & EDWARD RAMSDEN. (1988) Event-driven model of unreliable production lines with storage. International Journal of Production Research 26:7, pages 1173-1182.
Read now
W. E. WILHELM. (1986) A model to approximate transient performance of the flowshop. International Journal of Production Research 24:1, pages 33-50.
Read now
PETER KUBAT & USHIO SUMITA. (1985) Buffers and backup machines in automatic transfer lines. International Journal of Production Research 23:6, pages 1259-1270.
Read now
MEHMET SAVSAR & WILLIAME. BILES. (1984) Two-stage production lines with a single repair crew. International Journal of Production Research 22:3, pages 499-514.
Read now
YANNISA. PHILLIS. (1984) Maintenance decision-making and throughput rates in unreliable production systems. International Journal of Production Research 22:1, pages 157-168.
Read now
Tayfur Altiok & Shaler Stidham$suffix/text()$suffix/text(). (1983) The Allocation of Interstage Buffer Capacities in Production Lines. IIE Transactions 15:4, pages 292-299.
Read now
S. S. LAW. (1983) A factorial analysis of automatic transfer line systems. International Journal of Production Research 21:6, pages 827-834.
Read now
H. YAMASHINA & K. OKAMURA. (1983) Analysis of in-process buffers for multi-stage transfer line systems. International Journal of Production Research 21:2, pages 183-195.
Read now
S. S. LAW. (1981) A statistical analysis of system parameters in automatic transfer lines. International Journal of Production Research 19:6, pages 709-724.
Read now
J.G. Shanthikumar. (1980) On the Production Capacity of Automatic Transfer Lines with Unlimited Buffer Space. A I I E Transactions 12:3, pages 273-274.
Read now
E. A. ELSAYED & RICHARDE. TURLEY. (1980) Reliability analysis of production systems with buffer storage. International Journal of Production Research 18:5, pages 637-645.
Read now
Y. C. HO, M. A. EYLER & T. T. CHIEN. (1979) A gradient technique for general buffer storage design in a production line. International Journal of Production Research 17:6, pages 557-580.
Read now
W. E. WILHELM & T. SASTRI. (1979) An investigation of flow line operating characteristics during start-up. International Journal of Production Research 17:4, pages 345-358.
Read now
S.S. Panwalkar & M.L. Smith. (1979) A Predictive Equation for Average Output of K Stage Series Systems with Finite Interstage Queues. A I I E Transactions 11:2, pages 136-139.
Read now
RichardA. Murphy. (1978) Estimating the output of a series production system. A I I E Transactions 10:2, pages 139-148.
Read now
C.H. Lie, C.L. Hwang & F.A. Tillman. (1977) Availability of Maintained Systems: A State-of-the-Art Survey. A I I E Transactions 9:3, pages 247-259.
Read now
Edward Ignall & Alvin Silver. (1977) The Output of A Two-Stage System with Unreliable Machines and Limited Storage. A I I E Transactions 9:2, pages 183-188.
Read now

Articles from other publishers (16)

Fulya Altiparmak, Berna Dengiz & Akif A. Bulgak. (2007) Buffer allocation and performance modeling in asynchronous assembly system operations: An artificial neural network metamodeling approach. Applied Soft Computing 7:3, pages 946-956.
Crossref
A.A. Bulgak, P.D. Diwan & B. Inozu. (1995) Buffer size optimization in asynchronous assembly systems using genetic algorithms. Computers & Industrial Engineering 28:2, pages 309-322.
Crossref
S.C. Baral. (1993) Probabilistic modeling of the states of a buffer in a production flow system. IEEE Transactions on Engineering Management 40:4, pages 381-389.
Crossref
Akif Asil Bulgak. (1992) Impact of quality improvement on optimal buffer designs and productivity in automatic assembly systems. Journal of Manufacturing Systems 11:2, pages 124-136.
Crossref
Paul A. Jensen, Ramakrishnan Pakath & James R. Wilson. (1991) Optimal buffer inventories for multistage production systems with failures. European Journal of Operational Research 51:3, pages 313-326.
Crossref
Brian J. Melloy, Allen L. Soyster & M. Jeya Chandra. (1990) An observation on storage allocation in a flow line with a common buffer. European Journal of Operational Research 46:3, pages 388-392.
Crossref
Chih-Ming Liu & Jerry L. Sanders. (1988) Stochastic design optimization of asynchronous flexible assembly systems. Annals of Operations Research 15:1, pages 131-154.
Crossref
X Ma & A K Kochhar. (2006) Prediction of the System Efficiency of Balanced Automatic Transfer Lines. Proceedings of the Institution of Mechanical Engineers, Part B: Management and engineering manufacture 202:1, pages 51-59.
Crossref
Yannis A. Phillis, Henry D'Angelo & Gordon C. Saussy. (1986) Analysis of Series-Parallel Production Networks without Buffers. IEEE Transactions on Reliability 35:2, pages 179-184.
Crossref
Henry D'Angelo, Michael Caramanis, Susan Finger, Anton Mavretic, Yannis Phillis & Edward Ramsden. (1985) Event driven model of an unreliable production line with storage. Event driven model of an unreliable production line with storage.
Pierre L'Ecuyer. (1985) Computing transfer lines performance measures using dynamic programming. Computers & Industrial Engineering 9:4, pages 387-393.
Crossref
S.S. Law & V.C. Venkatesh. (1982) A Generalized Simulator for Automatic Transfer Line Systems. CIRP Annals 31:1, pages 359-364.
Crossref
Yosef S Sherif. (1982) Reliability analysis : Optimal inspection and maintenance schedules of failing systems. Microelectronics Reliability 22:1, pages 59-115.
Crossref
Yosef S Sherif. (1982) Optimal maintenance schedules of systems subject to stochastic failure. Microelectronics Reliability 22:1, pages 15-29.
Crossref
Y. S. Sherif & M. L. Smith. (2006) Optimal maintenance models for systems subject to failure–A Review. Naval Research Logistics Quarterly 28:1, pages 47-74.
Crossref
Richard C. Wilson. Capacity Planning and Productivity—A Tutorial. Capacity Planning and Productivity—A Tutorial.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.