17
Views
14
CrossRef citations to date
0
Altmetric
Original Articles

Scheduling on Parallel Machines to Minimize Two Criteria Related to Job Tardiness

&
Pages 288-296 | Received 01 May 1976, Published online: 09 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

M. BRANDOLESE, M. FRANCI & A. POZZETTI*. (1996) Production and maintenance integrated planning. International Journal of Production Research 34:7, pages 2059-2075.
Read now
M. GARETTI, C. LANZA & A. POZZETTI. (1994) An algorithm for the weekly production planning of flexible assembly systems. International Journal of Computer Integrated Manufacturing 7:4, pages 249-259.
Read now

Articles from other publishers (12)

Agostino G. Bruzzone & Francesco Longo. (2013) An Advanced Modeling & Simulation Tool for Investigating the Behavior of a Manufacturing System in the Hazelnuts Industry Sector. International Journal of Food Engineering 9:3, pages 241-257.
Crossref
Duilio Curcio, Francesco Longo & Giovanni Mirabelli. (2007) Manufacturing process management using a flexible modeling and simulation approach. Manufacturing process management using a flexible modeling and simulation approach.
Subhash C. Sarin & R. Hariharan. (2000) A two machine bicriteria scheduling problem. International Journal of Production Economics 65:2, pages 125-139.
Crossref
Miae Woo, Reha Uzsoy & Arif Ghafoor. (1999) Media Streams Scheduling for Synchronization in Distributed Multimedia Systems. Journal of Parallel and Distributed Computing 56:3, pages 272-295.
Crossref
V. Suresh & Dipak Chaudhuri. (1996) Bicriteria scheduling problem for unrelated parallel machines. Computers & Industrial Engineering 30:1, pages 77-82.
Crossref
Johnny C. Ho & Yih-Long Chang. (1995) Minimizing the number of tardy jobs for m parallel machines. European Journal of Operational Research 84:2, pages 343-355.
Crossref
Jiaqin Yang & Richard H. Deane. (2007) An Appellate Court Case Assignment Algorithm. Decision Sciences 24:3, pages 509-528.
Crossref
Johnny C. Ho & Yih-Long Chang. (1991) Heuristics for minimizing mean tardiness form parallel machines. Naval Research Logistics 38:3, pages 367-381.
Crossref
R.F.H. Musier & L.B. Evans. (1989) An approximate method for the production scheduling of industrial batch processes with parallel units. Computers & Chemical Engineering 13:1-2, pages 229-238.
Crossref
Jae Kyu Lee & Min Soo Suh. (2007) PAMS: A Domain‐specific Knowledge‐based Parallel Machine Scheduling System. Expert Systems 5:3, pages 198-214.
Crossref
B.L. Foote, A. Ravindran & S. Lashine. (1988) Production planning & scheduling. Computers & Industrial Engineering 15:1-4, pages 129-138.
Crossref
Tapan Sen & Sushil K Gupta. (1984) A state-of-art survey of static scheduling research involving due dates. Omega 12:1, pages 63-76.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.