Rauno Rusko, Sanna-Annika Koivisto & Sara Jestilä. 2023. Analytics Enabled Decision Making. Analytics Enabled Decision Making
23
44
.
Chin-Yin Huang, Sang Won Yoon & Shimon Y. Nof. 2023. Systems Collaboration and Integration. Systems Collaboration and Integration
3
50
.
Claudia-Melania Chituc & Shimon Y. Nof. (2007) The Join/Leave/Remain (JLR) decision in collaborative networked organizations. Computers & Industrial Engineering 53:1, pages 173-195.
Crossref
Serafettin Alpay & Mahmut Yavuz. 2007. New Trends in Applied Artificial Intelligence. New Trends in Applied Artificial Intelligence
334
343
.
Giuseppe Fogliazza. (2004) How Information Technology Enables the Potential flexibility and Re-Configurability of Highly Automated Manufacturing Plants. IFAC Proceedings Volumes 37:4, pages 399-405.
Crossref
Hong-Sen Yan, Zheng Wang & Xiao-Cheng Jiao. (2003) Modeling, scheduling and simulation of product development process by extended stochastic high-level evaluation Petri nets. Robotics and Computer-Integrated Manufacturing 19:4, pages 329-342.
Crossref
Hong Sen Yan & Jian Jiang. (1999) Agile concurrent engineering. Integrated Manufacturing Systems 10:2, pages 103-113.
Crossref
M. Grabowski & K.H. Roberts. (1996) Human and organizational error in large scale systems. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 26:1, pages 2-16.
Crossref
R. Agarwal, P. De & C.E. Wells. (1995) Cooperative distributed problem solving: an investigation in the domain of jobshop scheduling. Cooperative distributed problem solving: an investigation in the domain of jobshop scheduling.
Sandra Parker, Eric M. Malstrom, Lisa M. Irwin & Grant DuCote. (1994) A decision support system for personnel scheduling in a manufacturing environment. Computers & Industrial Engineering 27:1-4, pages 185-188.
Crossref
Suranjan De & Anita Lee. (1993) Flexible assembly scheduling using a knowledge-based approach. Expert Systems with Applications 6:3, pages 309-326.
Crossref
P. Tayanithi, S. Manivannan & J. Banks. (1993) Complexity reduction during interruption analysis in a flexible manufacturing system using knowledge-based on-line simulation. Journal of Manufacturing Systems 12:2, pages 153-169.
Crossref
Rambabu Kodali. (1992) A Knowledge‐based System for Selection of a Transport Path in Real‐time Control of FMS. International Journal of Operations & Production Management 12:9, pages 39-48.
Crossref
Atef Fahim & Kyunghyun Choi. (1992) Real-Time Cell Control for Flexible Manufacturing. IFAC Proceedings Volumes 25:20, pages 319-325.
Crossref
Oded Maimon & Mark Last. (1992) FMS control design: an information value approach. Journal of Intelligent Manufacturing 3:2, pages 123-132.
Crossref
Xianyu Cui, Hongsen Yan, Jinge Zhang, Yan Wang & Xiaoying Zhang. (1992) FMS modelling simulation based on Petri-nets and expert system. FMS modelling simulation based on Petri-nets and expert system.
Atef Fahim & Kyunghyun Choi. 1992. Algorithms and Architectures for Real-Time Control 1992. Algorithms and Architectures for Real-Time Control 1992
319
325
.
P. Tayanithi, S. Manivannan & J. Banks. (1992) A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system. Journal of Manufacturing Systems 11:3, pages 195-214.
Crossref
Li Lin, Jeffery K. Cochran & Joseph Sarkis. (1992) A metamodel-based decision support system for shop floor production control. Computers in Industry 18:2, pages 155-168.
Crossref
Kurt LittgerKurt Littger. 1992. Optimierung. Optimierung
241
249
.
William I. Bullers. (1991) A Tripartite Approach to Information Systems Development. Decision Sciences 22:1, pages 120-135.
Crossref
U.R. Dhar. (1991) Overview of models and DSS in planning and scheduling of FMS. International Journal of Production Economics 25:1-3, pages 121-127.
Crossref
D. Ben-Arieh. (1991) Concurrent modeling and simulation of multi-robot systems. Robotics and Computer-Integrated Manufacturing 8:1, pages 67-73.
Crossref
Suranjan De & Anita Lee. (1990) Flexible manufacturing system (FMS) scheduling using filtered beam search. Journal of Intelligent Manufacturing 1:3, pages 165-183.
Crossref
William I. BullersJr.Jr. & Richard A. Reid. (1990) Toward a comprehensive conceptual framework for computer integrated manufacturing. Information & Management 18:2, pages 57-67.
Crossref
F.G. Filip, D.A. Donciulescu & I. Socol. (1989) Models and Data Representation for Computer-aided Production Control in Large-scale Industrial Systems. IFAC Proceedings Volumes 22:10, pages 311-316.
Crossref
D.A. Hettenbach, C.M. Mitchell & T. Govindaraj. (1989) Decision making in supervisory control of a flexible manufacturing system. Decision making in supervisory control of a flexible manufacturing system.
S.Y. Nof. (1989) Knowledge-based real-time machines interaction. Knowledge-based real-time machines interaction.
Behnam Pourbabai. (1989) Effects of control strategies on the transient performance of an integrated manufacturing system. Robotics and Computer-Integrated Manufacturing 5:1, pages 83-89.
Crossref
M.C. Gupta, C. Judt, Y.P. Gupta & S. Balakrishnann. (1989) Expert scheduling system for a prototype flexible manufacturing cell: a framework. Computers & Operations Research 16:4, pages 363-378.
Crossref
Javad H. Ahmadi & Agha Iqbal ALI. (1988) Integrated production scheduling in large-scale flexible electronic parts manufacturing. Annals of Operations Research 15:1, pages 269-287.
Crossref
Suranjan DE. (1988) A knowledge-based approach to scheduling in an F.M.S.. Annals of Operations Research 12:1, pages 109-134.
Crossref
N. Badea-Dinca, F.G. Filip & G. Neagu. (1988) Computer Aids For Operations Cqntrol In Discrete Part Manufacturing-and Fms. Computer Aids For Operations Cqntrol In Discrete Part Manufacturing-and Fms.
J.C. Ammons, T. Govindaraj & C.M. Mitchell. (1988) Decision models for aiding FMS scheduling and control. IEEE Transactions on Systems, Man, and Cybernetics 18:5, pages 744-756.
Crossref
Oded Z. Maimon & Edward L. Fisher. (1988) An object-based representation method for a manufacturing cell controller. Artificial Intelligence in Engineering 3:1, pages 2-11.
Crossref
Abhijit Chaudhury, Shimon Y. Nof & Andrew B. Whinston. 1988. Computer Integrated Manufacturing. Computer Integrated Manufacturing
113
139
.
M. A. Head, R. J. Barson & M. C. Bonney. 1987. Advances in Manufacturing Technology II. Advances in Manufacturing Technology II
251
255
.
Efraim Turban & Mehran Sepehri. (1986) Applications of decision support and expert systems in flexible manufacturing systems. Journal of Operations Management 6:3-4, pages 433-448.
Crossref
W. Bullers. (1986) Logic programming for manufacturing system specification. Logic programming for manufacturing system specification.
Ramarathnam Ravichandran & Amiya K. Chakravarty. (1986) Decision support in flexible manufacturing systems using timed Petri nets. Journal of Manufacturing Systems 5:2, pages 89-101.
Crossref
A. Costa & M. Garetti. (1985) Design of a control system for a flexible manufacturing cell. Journal of Manufacturing Systems 4:1, pages 65-84.
Crossref
Suranjan De, Shimon Y Nof & Andrew B Whinston. (1985) Decision support in computer-integrated manufacturing. Decision Support Systems 1:1, pages 37-55.
Crossref
Shimon Y. Nof. 1983. Data Base Management: Theory and Applications. Data Base Management: Theory and Applications
325
348
.