248
Views
125
CrossRef citations to date
0
Altmetric
Original Articles

Analysis of Transfer Lines Consisting of Two Unreliable Machines with Random Processing Times and Finite Storage Buffers

&
Pages 2-11 | Received 01 Jan 1979, Published online: 06 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (35)

Gudrun P. Kiesmüller & Julia Zimmermann. (2018) The influence of spare parts provisioning on buffer size in a production system. IISE Transactions 50:5, pages 367-380.
Read now
Tullio A.M. Tolio & Andrea Ratti. (2018) Performance evaluation of two-machine lines with generalized thresholds. International Journal of Production Research 56:1-2, pages 926-949.
Read now
J. Behnamian, S.M.T. Fatemi Ghomi, B. Karimi & M. Fadaei Moludi. (2017) A Markovian approach for multi-level multi-product multi-period capacitated lot-sizing problem with uncertainty in levels. International Journal of Production Research 55:18, pages 5330-5340.
Read now
Zhang Yingjie & Ge Liling. (2015) Reliability analysis of machining systems by considering system cost. International Journal of Computer Integrated Manufacturing 28:8, pages 836-843.
Read now
Elisa Gebennini & Andrea Grassi. (2015) Discrete-time model for two-machine one-buffer transfer lines with buffer bypass and two capacity levels. IIE Transactions 47:7, pages 715-727.
Read now
P. Fernandes, M.E.J. O’Kelly, C.T. Papadopoulos & A. Sales. (2013) Analysis of exponential reliable production lines using Kronecker descriptors. International Journal of Production Research 51:14, pages 4240-4257.
Read now
Seok Ho Chang & StanleyB. Gershwin. (2010) Modeling and analysis of two unreliable batch machines with a finite buffer in between. IIE Transactions 42:6, pages 405-421.
Read now
T. Freiheit, M. Shpitalni, S. J. Hu & Y. Koren. (2004) Productivity of synchronized serial production lines with flexible reserve capacity. International Journal of Production Research 42:10, pages 2009-2027.
Read now
Shine-Der Lee & Siu-Hwa Ho. (2002) Buffer sizing in manufacturing production systems with complex routings. International Journal of Computer Integrated Manufacturing 15:5, pages 440-452.
Read now
Wen-Hai Chih, Chinyao Low & Hong Wang. (2000) 多站平行佈置流程式彈性裝配系統之動態可靠度探討. Journal of the Chinese Institute of Industrial Engineers 17:4, pages 393-404.
Read now
HIDEAKI YAMASHITA & TAYFUR ALTIOK. (1998) Buffer capacity allocation for a desired throughput in production lines. IIE Transactions 30:10, pages 883-891.
Read now
Upset Robert, P.Van Til Robert & Sengupta Sankar. (1998) Development of a model for a two-station serial transfer line subject to machine and buffer failure. Mathematical and Computer Modelling of Dynamical Systems 4:3, pages 231-246.
Read now
KEUN-CHAE JEONG & YEONG-DAE KIM. (1998) Performance analysis of assembly/disassembly systems with unreliable machines and random processing times. IIE Transactions 30:1, pages 41-53.
Read now
MEHMET SAVSAR. (1996) Stochastic modelling of an integrated pulp and paper factory with intermediate storage. International Journal of Systems Science 27:12, pages 1251-1264.
Read now
S. DOWLATSHAHI. (1996) An efficient solution for determining location and size of buffer stocks. Production Planning & Control 7:3, pages 282-291.
Read now
YUSHIN HONG$suffix/text()$suffix/text(), C. ROGER GLASSEY$suffix/text()$suffix/text() & DEOKHYUN SEONG. (1992) The Analysis of a Production Line with Unreliable Machines and Random Processing Times. IIE Transactions 24:1, pages 77-83.
Read now
GEORGE TSIOTRAS, HUSSEIN BADR & ED BELTRAMI. (1991) Blocking Probabilities for a Class of Two-Station Tandem Queueing Models. IIE Transactions 23:4, pages 331-345.
Read now
FREDERICKS. HILLIER & KUTC. SO. (1991) The effect of machine breakdowns and interstage storage on the performance of production line systems. International Journal of Production Research 29:10, pages 2043-2055.
Read now
JEAN FIGOUR, BRIGITTE JOLLÉS & CHRISTIAN MASCLE. (1991) Free-transfer lines with unreliable assembly stations and small buffers. International Journal of Production Research 29:5, pages 979-996.
Read now
V. MANI, Y. P. ANEJA & N. SINGH. (1990) Throughput analysis of a two station closed queueing network with blocking and server breakdown. International Journal of Systems Science 21:4, pages 611-619.
Read now
Y Narahari & N Viswanadham. (1989) Performance Modelling of Flexible Manufacturing Systems. IETE Journal of Research 35:4, pages 221-236.
Read now
CHRISTOSP. KOULAMAS. (1989) Optimal buffer space size in two-stage machining systems with Markovian or non-Markovian tool life processes. International Journal of Production Research 27:7, pages 1167-1178.
Read now
LAYEKL. ABDEL-MALEK$suffix/text()$suffix/text(). (1988) The Effect Of Robots With Overlapping Envelopes On The Performance Of Flexible Transfer Lines. IIE Transactions 20:2, pages 213-222.
Read now
J.A. Buzacott & Drazen Kostelski. (1987) Matrix-geometric and Recursive Algorithm Solution of a Two-stage Unreliable How Line. IIE Transactions 19:4, pages 429-438.
Read now
M.A. Jafari & J.G. Shanthikumar. (1987) Exact and Approximate Solutions to Two-Stage Transfer Lines with General Uptime and Downtime Distributions. IIE Transactions 19:4, pages 412-420.
Read now
ABRAHAM SEIDMANN. (1987) On-line scheduling of a robotic manufacturing cell with stochastic sequence-dependent processing rates. International Journal of Production Research 25:6, pages 907-924.
Read now
S. Chakravarthy. (1987) Analysis of production line systems with two unreliable machines with phase type processing timesand a finite storage buffer. Communications in Statistics. Stochastic Models 3:3, pages 369-391.
Read now
E. A. ELSAYED & C. C. HWANG. (1986) Analysis of two-stage manufacturing systems with buffer storage and redundant machines. International Journal of Production Research 24:1, pages 187-201.
Read now
BhabaR. Sarker. (1984) Some Comparative and Design Aspects of Series Production Systems. IIE Transactions 16:3, pages 229-239.
Read now
Tayfur Altiok & Shaler Stidham$suffix/text()$suffix/text(). (1983) The Allocation of Interstage Buffer Capacities in Production Lines. IIE Transactions 15:4, pages 292-299.
Read now
TayfurM. Altiok & Shaler Stidham$suffix/text()$suffix/text(). (1982) A Note On Transfer Lines With Unreliable Machines, Random Processing Times, and Finite Buffers. A I I E Transactions 14:2, pages 125-127.
Read now
JohnL. Bryant & RichardA. Murphy. (1981) Availability Characteristics of an Unbalanced Buffered Series Production System With Repair Priority. A I I E Transactions 13:3, pages 249-257.
Read now

Articles from other publishers (90)

Salvatore Scrivano, Barış Tan & Tullio Tolio. (2023) Continuous-flow simulation of manufacturing systems with assembly/disassembly machines, multiple loops and general layout. Journal of Manufacturing Systems 69, pages 103-118.
Crossref
Hatice Ucar Guner, Alper Murat & Ratna Babu Chinnam. (2023) Performance analysis of a production system with two deteriorating machines and a finite buffer. Central European Journal of Operations Research.
Crossref
Theodor Freiheit. (2023) A discrete state Markov chain model and decomposition solution method for the transient behaviour of buffered long serial transfer lines. Journal of Manufacturing Systems 68, pages 493-507.
Crossref
F.E. Sachs, S. Helber & G.P. Kiesmüller. (2022) Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning. European Journal of Operational Research 302:2, pages 544-559.
Crossref
Ying Mei & Zhigang Zeng. (2022) Compensating for part arrival uncertainties in two-processing-machine, one-buffer flow lines: Inventory flexibility design based on the system transient performances. Robotics and Computer-Integrated Manufacturing 76, pages 102312.
Crossref
Maria Chiara Magnanini & Tullio A.M. Tolio. (2021) Performance evaluation of asynchronous two-stage manufacturing lines fabricating discrete parts. CIRP Journal of Manufacturing Science and Technology 33, pages 488-505.
Crossref
Ping-Chen Chang, Yi-Kuei Lin & Yu-Min Chiang. (2019) System reliability estimation and sensitivity analysis for multi-state manufacturing network with joint buffers––A simulation approach. Reliability Engineering & System Safety 188, pages 103-109.
Crossref
Xinze Huang, Zhenyuan Ding, Zijian Bi, Yili Wang, Kai Zheng & Xin Huang. (2018) Model Checking of Systems with Unreliable Machines Using PRISM. Model Checking of Systems with Unreliable Machines Using PRISM.
Jun-Qiang Wang, Fei-Yi Yan, Peng-Hao Cui, Tian Xia, Fu-Dong Cui & Sicco Verwer. (2017) Modeling and analysis of non-homogenous fabrication/assembly systems with multiple failure modes. The International Journal of Advanced Manufacturing Technology 94:9-12, pages 3309-3325.
Crossref
Geni Gupur. (2016) Point spectrum of the operator corresponding to a reliability model and application. Journal of Pseudo-Differential Operators and Applications 7:3, pages 411-429.
Crossref
Ünsal Özdoğru & Tayfur Altiok. (2012) Continuous material flow systems: analysis of marine ports handling bulk materials. Annals of Operations Research 231:1, pages 79-104.
Crossref
Michael Manitz. (2014) Analysis of assembly/disassembly queueing networks with blocking after service and general service times. Annals of Operations Research 226:1, pages 417-441.
Crossref
Yael Perlman, Amir Elalouf & Eyal Bodinger. (2014) Dynamic repair priority for a transfer line with a finite buffer. Journal of Manufacturing Systems 33:1, pages 16-26.
Crossref
Seungchul Lee, Xi Gu & Jun Ni. (2013) Stochastic maintenance opportunity windows for unreliable two-machine one-buffer system. Expert Systems with Applications 40:13, pages 5385-5394.
Crossref
Elisa Gebennini, Andrea Grassi, Cesare Fantuzzi, Stanley B. Gershwin & Irvin Cemil Schick. (2011) Discrete time model for two-machine one-buffer transfer lines with restart policy. Annals of Operations Research 209:1, pages 41-65.
Crossref
P. Fernandes, M. E. J. O’Kelly, C. T. Papadopoulos & A. Sales. 2013. Handbook of Stochastic Models and Analysis of Manufacturing System Operations. Handbook of Stochastic Models and Analysis of Manufacturing System Operations 73 113 .
Geni Gupur & M. W. Wong. (2011) On a dynamical system for a reliability model. Journal of Pseudo-Differential Operators and Applications 2:4, pages 509-542.
Crossref
A. Kokangul, T. Khaniyev & J. K. Cochran. (2009) Optimal control of work‐in‐process inventory of a two‐station production line. Optimal Control Applications and Methods 31:3, pages 201-211.
Crossref
Marcello Colledani & Tullio Tolio. (2009) Performance evaluation of production systems monitored by statistical process control and off-line inspections. International Journal of Production Economics 120:2, pages 348-367.
Crossref
Na Li, Li Zheng & Quan-Lin Li. (2009) Performance analysis of two-loop closed production systems. Computers & Operations Research 36:1, pages 119-134.
Crossref
V. Madhusudanan Pillai & M.P. Chandrasekharan. (2008) An absorbing Markov chain model for production systems with rework and scrapping. Computers & Industrial Engineering 55:3, pages 695-706.
Crossref
Michael Manitz. (2008) Queueing-model based analysis of assembly lines with finite buffers and general service times. Computers & Operations Research 35:8, pages 2520-2536.
Crossref
Jun-Tian Zhao, Jun Liu, Zhi-Yuan Rui & E-Min Li. (2008) A new extended system aggregation method of hybrid production lines. A new extended system aggregation method of hybrid production lines.
Seok Ho Chang & Stanley B. Gershwin. (2007) Analysis of an unreliable batch machine and a finite buffer fed by an unreliable single-item machine: partial batches. Analysis of an unreliable batch machine and a finite buffer fed by an unreliable single-item machine: partial batches.
Walid Abdul-Kader. (2006) Capacity improvement of an unreliable production line—an analytical approach. Computers & Operations Research 33:6, pages 1695-1712.
Crossref
Stefan Helber. 2006. Stochastic Modeling of Manufacturing Systems. Stochastic Modeling of Manufacturing Systems 55 76 .
Jingshan Li & Semyon M. Meerkov. 2005. Analysis, Control and Optimization of Complex Dynamic Systems. Analysis, Control and Optimization of Complex Dynamic Systems 61 90 .
Li Qiu & Shigemichi Suzuki. (2004) SOLUTION METHODS FOR A PRODUTION LINE WITH MACHINE FAILURES AND INTERMEDIATE BUFFERS. Transactions of the Operations Research Society of Japan 47:0, pages 67-82.
Crossref
Kenneth Sörensen & Gerrit K Janssens. (2004) A Petri net model of a continuous flow transfer line with unreliable machines. European Journal of Operational Research 152:1, pages 248-262.
Crossref
R. Levantesi, A. Matta & T. Tolio. 2003. Analysis and Modeling of Manufacturing Systems. Analysis and Modeling of Manufacturing Systems 181 200 .
C.H. Paik, H.G. Kim & H.S. Cho. (2002) Performance analysis for closed-loop production systems with unreliable machines and random processing times. Computers & Industrial Engineering 42:2-4, pages 207-220.
Crossref
Simonetta Balsamo, Vittoria de Nitto Personé & Raif OnvuralSimonetta Balsamo, Vittoria de Nitto Personé & Raif Onvural. 2001. Analysis of Queueing Networks with Blocking. Analysis of Queueing Networks with Blocking 25 50 .
S.M.A. Suliman. (2000) A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device. International Journal of Production Economics 63:1, pages 69-81.
Crossref
R. Lipset, R.P. Van Til & S. Sengupta. (1999) Steady-state performance analysis of serial transfer lines subject to machine and buffer failure. IEEE Transactions on Automatic Control 44:2, pages 319-325.
Crossref
Manish K. Govil & Michael C. Fu. (1999) Queueing theory in manufacturing: A survey. Journal of Manufacturing Systems 18:3, pages 214-240.
Crossref
Stefan Helber. (1998) Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times. European Journal of Operational Research 109:1, pages 24-42.
Crossref
T. Tolio, A. Matta & F. Jovane. (1998) A Method for Performance Evaluation of Automated Flow Lines. CIRP Annals 47:1, pages 373-376.
Crossref
S. Yeralan & B. Tan. (1997) Analysis of multistation production systems with limited buffer capacity part 1: The subsystem model. Mathematical and Computer Modelling 25:7, pages 109-122.
Crossref
Tayfur AltiokTayfur Altiok. 1997. Performance Analysis of Manufacturing Systems. Performance Analysis of Manufacturing Systems 118 184 .
H.T. Papadopoulos & C. Heavey. (1996) Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research 92:1, pages 1-27.
Crossref
Abraham Mehrez & Michael Y. Hu. (1996) A statistical analysis to design and operate an unreliable transfer line with exogenous random unit demand. Computers & Industrial Engineering 30:2, pages 185-192.
Crossref
Samia Siha. (1996) Modeling the blocking phenomenon in JIT environment: An alternative scenario. Computers & Industrial Engineering 30:1, pages 61-75.
Crossref
F.Frank Chen & Satanapa Thinphangnga. (1996) Analytical modeling and analysis of flexible manufacturing systems considering system component failure/repair rates. Journal of Manufacturing Systems 15:3, pages 143-154.
Crossref
Yi-Cheng Su & M.Jeya Chandra. (1995) An approximation analysis for multistage production lines. Computers & Operations Research 22:8, pages 779-791.
Crossref
Tan Min. (1995) The Optimal Apportionment to the Capacity of Buffers in a Transfer Line with Unreliable Machines. IFAC Proceedings Volumes 28:16, pages 311-315.
Crossref
R. Lipset, R.P. Van Til & S. Sengupta. (1995) Derivation of repair and processing rates for decomposition of serial transfer lines with unreliable buffers. Derivation of repair and processing rates for decomposition of serial transfer lines with unreliable buffers.
Thomas F. Hassett & Duane L. Dietrich. (1995) Availability/reliability engineering analysis of three, four, and five-stage unreliable series transfer lines. Journal of Manufacturing Systems 14:6, pages 427-438.
Crossref
Rajan Suri & Bor-Ruey Fu. (1994) On using continuous flow lines to model discrete production lines. Discrete Event Dynamic Systems: Theory and Applications 4:2, pages 129-169.
Crossref
Abraham Mehrez & B.Eddy Patuwo. (1994) Discrete unreliable transfer lines with exogenous random unit demand. Computers & Industrial Engineering 26:2, pages 307-320.
Crossref
Simonetta Balsamo & Vittoria de Nitto Personè. (1994) A survey of product form queueing networks with blocking and their equivalences. Annals of Operations Research 48:1, pages 31-61.
Crossref
R. Lipset, S. Sengupta & R.P. Van Til. (1994) Analytic modeling of the unreliable buffer in the serial transfer line. Analytic modeling of the unreliable buffer in the serial transfer line.
R. Macchiaroli. (1994) Modelling flexible flow lines with generalized stochastic Petri nets. Modelling flexible flow lines with generalized stochastic Petri nets.
V.S. Kouikoglou & Y.A. Phillis. (1994) A continuous flow model for networks with finite queues, unreliable servers, and multiple customers. A continuous flow model for networks with finite queues, unreliable servers, and multiple customers.
R. Lipset, S. Sengupta & R.P. Van Til. (1994) A decomposition technique for steady-state performance evaluation of serial transfer lines subject to machine and buffer failures. A decomposition technique for steady-state performance evaluation of serial transfer lines subject to machine and buffer failures.
Kurapati Venkatesh, Mehdi Kaighobadi, MengChu Zhou & Reggie J. Caudill. (1994) Augmented timed petri nets for modeling, simulation, and analysis of robotic systems with breakdowns. Journal of Manufacturing Systems 13:4, pages 289-301.
Crossref
Max-Olivier Hongler. 1994. Chaotic and Stochastic Behaviour in Automatic Production Lines. Chaotic and Stochastic Behaviour in Automatic Production Lines 81 85 .
Yushin Hong & Deokhyun Seong. (1993) The analysis of an unreliable two-machine production line with random processing times. European Journal of Operational Research 68:2, pages 228-235.
Crossref
C. Heavey, H.T. Papadopoulos & J. Browne. (1993) The throughput rate of multistation unreliable production lines. European Journal of Operational Research 68:1, pages 69-89.
Crossref
Rajan Suri, Jerry L. Sanders & Manjunath Kamath. 1993. Logistics of Production and Inventory. Logistics of Production and Inventory 199 286 .
S. Balsamo. 1993. Performance Evaluation of Computer and Communication Systems. Performance Evaluation of Computer and Communication Systems 21 52 .
Hark Hwang & Shie-Gheun Koh. (1992) Optimal control of work-in-process with dual limit switches in two-stage transfer line. European Journal of Operational Research 63:1, pages 66-75.
Crossref
N. Viswanadham, Y. Narahari & T.L. Johnson. (1992) Stochastic modelling of flexible manufacturing systems. Mathematical and Computer Modelling 16:3, pages 15-34.
Crossref
Yves Dallery & Stanley B. Gershwin. (1992) Manufacturing flow line systems: a review of models and analytical results. Queueing Systems 12:1-2, pages 3-94.
Crossref
A. Desrochers, H. Jungrritz & M. Silva. (1992) An Approximation Method For The Performance Analysis Of Manufacturing Systems Based On GSPNs. An Approximation Method For The Performance Analysis Of Manufacturing Systems Based On GSPNs.
Paul A. Jensen, Ramakrishnan Pakath & James R. Wilson. (1991) Optimal buffer inventories for multistage production systems with failures. European Journal of Operational Research 51:3, pages 313-326.
Crossref
S. Balsamo & V. De Nitto-Personé. (1991) Closed queueing networks with finite capacities: blocking types, product-form solution and performance indices. Performance Evaluation 12:2, pages 85-102.
Crossref
YANNIS A. PHILLIS & VASSILIS S. KOUIKOGLOU. 1991. Manufacturing and Automation Systems: Techniques and Technologies, Part 3 of 5. Manufacturing and Automation Systems: Techniques and Technologies, Part 3 of 5 1 50 .
Cheng Xin-Gang & Zheng Ying-Ping. 1991. Automatic Control 1990. Automatic Control 1990 497 499 .
Cheng Xin-Gang & Zheng Ying-Ping. (1990) Some Results on Near-complete Decomposability of Discrete Event Systems. IFAC Proceedings Volumes 23:8, pages 497-499.
Crossref
Raif O. Onvural. (1990) Survey of closed queueing networks with blocking. ACM Computing Surveys 22:2, pages 83-121.
Crossref
Brian J. Melloy, Allen L. Soyster & M. Jeya Chandra. (1990) An observation on storage allocation in a flow line with a common buffer. European Journal of Operational Research 46:3, pages 388-392.
Crossref
M. Aicardi, R. Minciardi & P.P. Puliafito. (1990) Multiclass closed queueing networks with deterministic service times and finite local buffers: an approximate performance analysis method. Multiclass closed queueing networks with deterministic service times and finite local buffers: an approximate performance analysis method.
R.Y. Al-Jaar & A.A. Desrochers. (1990) Performance evaluation of automated manufacturing systems using generalized stochastic Petri nets. IEEE Transactions on Robotics and Automation 6:6, pages 621-639.
Crossref
H.G Perros. (1989) A bibliography of papers on queueing networks with finite capacity queues. Performance Evaluation 10:3, pages 255-260.
Crossref
S. Balsamo & L. Donatiello. (1989) On the Cycle Time Distribution in a Two-Stage Cyclic Network with Blocking. IEEE Transactions on Software Engineering 15:10, pages 1206-1216.
Crossref
G.J. Miltenburg & A.Z. Szendrovits. (1989) Determining safety stocks of large transfer lines for a preset efficiency. Engineering Costs and Production Economics 16:2, pages 137-150.
Crossref
B. Maione, M. P. Fanti & B. Turchiano. 1989. Operations Research Models in Flexible Manufacturing Systems. Operations Research Models in Flexible Manufacturing Systems 193 211 .
S. Balsamo & L. Donatiello. 1990. Modeling Techniques and Tools for Computer Performance Evaluation. Modeling Techniques and Tools for Computer Performance Evaluation 439 450 .
Chih-Ming Liu & Jerry L. Sanders. (1988) Stochastic design optimization of asynchronous flexible assembly systems. Annals of Operations Research 15:1, pages 131-154.
Crossref
Debasis Mitra. (2016) Stochastic theory of a fluid model of producers and consumers coupled by a buffer. Advances in Applied Probability 20:3, pages 646-676.
Crossref
Abraham Seidmann. (1988) Regenerative pull (Kanban) production control policies. European Journal of Operational Research 35:3, pages 401-413.
Crossref
Hideaki Yamashita & Shigemichi Suzuki. (1988) An approximation method for line production rate of a serial production line with a common buffer. Computers & Operations Research 15:5, pages 395-402.
Crossref
S. B. Gershwin. (1987) Representation and analysis of transfer lines with machines that have different processing rates. Annals of Operations Research 9:1, pages 511-530.
Crossref
G. J. Miltenburg. (1987) Variance of the number of units produced on a transfer line with buffer inventories during a period of lengthT. Naval Research Logistics 34:6, pages 811-822.
Crossref
S. Balsamo, V. De Nitto Personè & G. Lazeolla. 1987. Flow Control of Congested Networks. Flow Control of Congested Networks 243 254 .
Raif O. Onvural & H.G. Perros. (1986) On equivalencies of blocking mechanisms in queueing networks with blocking. Operations Research Letters 5:6, pages 293-297.
Crossref
H. G. Perros. (1984) Queueing networks with blocking. ACM SIGMETRICS Performance Evaluation Review 12:2, pages 8-12.
Crossref
Stanley B. Gershwin. 1984. Analysis and Optimization of Systems. Analysis and Optimization of Systems 645 658 .
Jessica O. Matson & John A. White. (1982) Operational research and material handling. European Journal of Operational Research 11:4, pages 309-318.
Crossref
Oded Berman. (1982) Efficiency and production rate of a transfer line with two machines and a finite storage buffer. European Journal of Operational Research 9:3, pages 295-308.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.