52
Views
14
CrossRef citations to date
0
Altmetric
Original Articles

Crane Scheduling Problems

&
Pages 304-311 | Received 01 Apr 1980, Published online: 06 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Y. YIH. (1994) An algorithm for hoist scheduling problems. International Journal of Production Research 32:3, pages 501-516.
Read now
R.W. Lieberman & I.B. Turksen. (1982) Two-Operation Crane Scheduling Problems. A I I E Transactions 14:3, pages 147-155.
Read now

Articles from other publishers (12)

Guodong Zhao, Jiyin Liu, Lixin Tang, Ren Zhao & Yun Dong. (2020) Model and Heuristic Solutions for the Multiple Double-Load Crane Scheduling Problem in Slab Yards. IEEE Transactions on Automation Science and Engineering 17:3, pages 1307-1319.
Crossref
Florian Jaehn & Andreas Wiehl. (2020) Approximation algorithms for the twin robot scheduling problem. Journal of Scheduling 23:1, pages 117-133.
Crossref
Yunxing Lan & Li Wang. (2019) Comparison between Two Different Handling Modes of Gantry Cranes in Railway Container Terminals. Journal of Physics: Conference Series 1176, pages 052001.
Crossref
Nils Boysen, Dirk Briskorn & Frank Meisel. (2017) A generalized classification scheme for crane scheduling with interference. European Journal of Operational Research 258:1, pages 343-357.
Crossref
Simon Emde & Nils Boysen. (2013) One-dimensional vehicle scheduling with a front-end depot and non-crossing constraints. OR Spectrum 36:2, pages 381-400.
Crossref
Tao Zhang & Oliver Rose. (2013) Simulation-based overhead-crane scheduling for a manufacturing plant. Simulation-based overhead-crane scheduling for a manufacturing plant.
Zhili Zhou & Ling Li. (2012) Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines. Computers & Operations Research 39:8, pages 1850-1856.
Crossref
Yves Crama & Joris Van de Klundert. (1999) Cyclic scheduling in 3-machine robotic flow shops. Journal of Scheduling 2:1, pages 35-54.
Crossref
Yves Crama. (1997) Combinatorial optimization models for production scheduling in automated manufacturing systems. European Journal of Operational Research 99:1, pages 136-153.
Crossref
C. Varnier, O. Grunder & P. Baptiste. (1995) Improving the productivity of electroplating lines by changing the layout of the tanks. Improving the productivity of electroplating lines by changing the layout of the tanks.
Ronald Armstrong, Lei Lei & Shanhong Gu. (1994) A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints. European Journal of Operational Research 78:1, pages 130-140.
Crossref
I.B. Turksen. (1987) A brief report on fuzzy set related research at University of Toronto. Fuzzy Sets and Systems 22:1-2, pages 190-192.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.