57
Views
10
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure

, &
Pages 921-929 | Received 01 Apr 1999, Accepted 01 Nov 1999, Published online: 31 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

L. Mönch, M. Stehli, J. Zimmermann & I. Habenicht. (2006) The FABMAS multi-agent-system prototype for production control of water fabs: design, implementation and performance assessment. Production Planning & Control 17:7, pages 701-716.
Read now
M. Bruccoleri , P. Renna & G. Perrone. (2005) Reconfiguration: a key to handle exceptions and performance deteriorations in manufacturing operations. International Journal of Production Research 43:19, pages 4125-4145.
Read now
V. Subramaniam , A. S. Raheja & K. Rama Bhupal Reddy. (2005) Reactive repair tool for job shop schedules. International Journal of Production Research 43:1, pages 1-23.
Read now

Articles from other publishers (7)

Jose M. Framinan & Rubén Ruiz. (2010) Architecture of manufacturing scheduling systems: Literature review and an integrated proposal. European Journal of Operational Research 205:2, pages 237-246.
Crossref
Masao Sugi, Mingang Cheng, Masashi Yamamoto, Hiroki Ito, Kazuyoshi Inoue & Jun Ota. (2010) Online Rescheduling in Semiconductor Manufacturing. International Journal of Automation Technology 4:2, pages 184-197.
Crossref
Seungyub Lee, Young-Jun Son & Richard A. Wysk. (2007) Simulation-based planning and control: From shop floor to top floor. Journal of Manufacturing Systems 26:2, pages 85-98.
Crossref
Manfredi Bruccoleri, Zbigniew J. Pasek & Yoram Koren. (2006) Operation management in reconfigurable manufacturing systems: Reconfiguration for error handling. International Journal of Production Economics 100:1, pages 87-100.
Crossref
Lars Mönch & René Drießel. (2005) A distributed shifting bottleneck heuristic for complex job shops. Computers & Industrial Engineering 49:3, pages 363-380.
Crossref
Walter O. Rom, Oya Icmeli Tukel & Joseph R. Muscatello. (2002) MRP in a job shop environment using a resource constrained project scheduling model. Omega 30:4, pages 275-286.
Crossref
M. Bruccoleri & Z.J. Pasek. (2002) Operational issues in reconfigurable manufacturing systems: exception handling. Operational issues in reconfigurable manufacturing systems: exception handling.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.