140
Views
46
CrossRef citations to date
0
Altmetric
Original Articles

An application of genetic algorithms to lot-streaming flow shop scheduling

&
Pages 779-787 | Received 01 Oct 2000, Accepted 01 Dec 2001, Published online: 17 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (14)

Augusto Ferraro, Daniel Rossit, Adrián Toncovich & Mariano Frutos. (2019) Lot Streaming Flow Shop with a Heterogeneous Machine. Engineering Management Journal 31:2, pages 113-126.
Read now
George Q. Huang, Ting Zhang, Su Xiu Xu & Ting Qu. (2014) Headquarter-centered Common Order Management: a simulation approach. Production Planning & Control 25:13-14, pages 1156-1168.
Read now
Yu-Yan Han, Dun-wei Gong, Xiao-Yan Sun & Quan-Ke Pan. (2014) An improved NSGA-II algorithm for multi-objective lot-streaming flow shop scheduling problem. International Journal of Production Research 52:8, pages 2211-2231.
Read now
G.Vijay Chakaravarthy, S. Marimuthu, S.G. Ponnambalam & G. Kanagaraj. (2014) Improved sheep flock heredity algorithm and artificial bee colony algorithm for scheduling m-machine flow shops lot streaming with equal size sub-lot problems. International Journal of Production Research 52:5, pages 1509-1527.
Read now
M. Cheng, N.J. Mukherjee & S.C. Sarin. (2013) A review of lot streaming. International Journal of Production Research 51:23-24, pages 7023-7046.
Read now
Deming Lei & Xiuping Guo. (2013) Scheduling job shop with lot streaming and transportation through a modified artificial bee colony. International Journal of Production Research 51:16, pages 4930-4941.
Read now
T'kindt Vincent. (2011) Multicriteria models for just-in-time scheduling. International Journal of Production Research 49:11, pages 3191-3209.
Read now
Celia A. Glass & Edgar Possani. (2011) Lot streaming multiple jobs in a flow shop. International Journal of Production Research 49:9, pages 2669-2681.
Read now
Cengiz Kahraman, Orhan Engin & Mustafa Kerim Yilmaz. (2009) A New Artificial Immune System Algorithm for Multiobjective Fuzzy Flow Shop. International Journal of Computational Intelligence Systems 2:3, pages 236-247.
Read now
Felix T.S. Chan, T.C. Wong & L.Y. Chan. (2009) The application of genetic algorithms to lot streaming in a job-shop scheduling problem. International Journal of Production Research 47:12, pages 3387-3412.
Read now
Jia-Yen Huang & Ming-Jong Yao. (2008) A genetic algorithm for solving the economic lot scheduling problem in flow shops. International Journal of Production Research 46:14, pages 3737-3761.
Read now
L.K. Gaafar & S.A. Masoud. (2005) Genetic algorithms and simulated annealing for scheduling in agile manufacturing. International Journal of Production Research 43:14, pages 3069-3085.
Read now
F. T. S. Chan , T. C. Wong & L. Y. Chan. (2005) A genetic algorithm-based approach to machine assignment problem. International Journal of Production Research 43:12, pages 2451-2472.
Read now
Jen Huei Chang & Huan Neng Chiu. (2005) A comprehensive review of lot streaming. International Journal of Production Research 43:8, pages 1515-1536.
Read now

Articles from other publishers (32)

Wenyan Wang, Zhenhao Xu & Xingsheng Gu. (2022) A two-stage discrete water wave optimization algorithm for the flowshop lot-streaming scheduling problem with intermingling and variable lot sizes. Knowledge-Based Systems 238, pages 107874.
Crossref
Jun-qing Li, Xin-rui Tao, Bao-xian Jia, Yu-yan Han, Chuang Liu, Peng Duan, Zhi-xin Zheng & Hong-yan Sang. (2020) Efficient multi-objective algorithm for the lot-streaming hybrid flowshop with variable sub-lots. Swarm and Evolutionary Computation 52, pages 100600.
Crossref
Yuyan Han, Junqing Li, Yiping Liu, Zhixin Zheng, Yuxia Pan, Hongyan Sang & Lili Liu. (2019) Migrating Birds Optimization for Lot-streaming flow shop scheduling problem. Migrating Birds Optimization for Lot-streaming flow shop scheduling problem.
Yuyan Han, Dunwei Gong, Yaochu Jin & Quanke Pan. (2019) Evolutionary Multiobjective Blocking Lot-Streaming Flow Shop Scheduling With Machine Breakdowns. IEEE Transactions on Cybernetics 49:1, pages 184-197.
Crossref
Yuyan Han, Jun-Qing Li, Dunwei Gong & Hongyan Sang. (2019) Multi-Objective Migrating Birds Optimization Algorithm for Stochastic Lot-Streaming Flow Shop Scheduling With Blocking. IEEE Access 7, pages 5946-5962.
Crossref
Dunwei Gong, Yuyan Han & Jianyong Sun. (2018) A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems. Knowledge-Based Systems 148, pages 115-130.
Crossref
Yuyan Han, Dunwei Gong, Yaochu Jin & Quan-ke Pan. (2016) Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time. Applied Soft Computing 42, pages 229-245.
Crossref
B. Naderi & M. Yazdani. (2014) A model and imperialist competitive algorithm for hybrid flow shops with sublots and setup times. Journal of Manufacturing Systems 33:4, pages 647-653.
Crossref
Kesheng Lu & Lingzhi Wang. (2013) A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems. A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems.
Jianqing Chen. (2012) Workshop Scheduling for Order Change of Machinery Enterprises. Workshop Scheduling for Order Change of Machinery Enterprises.
Hong-yan Sang & Jun-hua Duan. (2012) An efficient discrete artificial bee colony algorithm for total flowtime lot-streaming flowshop. An efficient discrete artificial bee colony algorithm for total flowtime lot-streaming flowshop.
Quan-Ke Pan & Rubén Ruiz. (2012) An estimation of distribution algorithm for lot-streaming flow shop problems with setup times. Omega 40:2, pages 166-180.
Crossref
Quan-Ke Pan, M. Fatih Tasgetiren, P.N. Suganthan & T.J. Chua. (2011) A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem. Information Sciences 181:12, pages 2455-2468.
Crossref
Taho Yang & Yu-An Shen. (2011) The dynamic transfer batch-size decision for thin film transistor–liquid crystal display array manufacturing by artificial neural-network. Computers & Industrial Engineering 60:4, pages 769-776.
Crossref
Quan-Ke Pan, P.N. Suganthan, J.J. Liang & M. Fatih Tasgetiren. (2011) A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem. Expert Systems with Applications 38:4, pages 3252-3259.
Crossref
Jun-Hua Duan, Quan-ke Pan, KaiZhuo Gao, Junqing Li & Zhenqiang Bao. (2010) Scheduling the lot-streaming flow shop problem using a shuffled frog-leaping algorithm. Scheduling the lot-streaming flow shop problem using a shuffled frog-leaping algorithm.
Hong-yan Sang. (2010) A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems. A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems.
Quan-Ke Pan, Mehmet Fatih Tasgetiren, Ponnuthurai Nagaratnam Suganthan & Yun-Chia Liang. (2010) Solving lot-streaming flow shop scheduling problems using a discrete harmony search algorithm. Solving lot-streaming flow shop scheduling problems using a discrete harmony search algorithm.
Yossi Bukchin, Michael Masin & Rinat Kirshner. (2010) Modeling and analysis of multiobjective lot splitting for N ‐product M ‐machine flowshop lines . Naval Research Logistics (NRL) 57:4, pages 354-366.
Crossref
Quan-Ke Pan, Jun-hua Duan, J. J. Liang, Kaizhou Gao & Junqing Li. (2010) A novel discrete harmony search algorithm for scheduling lot-streaming flow shops. A novel discrete harmony search algorithm for scheduling lot-streaming flow shops.
Felix T.S. Chan, T.C. Wong & L.Y. Chan. (2009) An evolutionary algorithm for assembly job shop with part sharing. Computers & Industrial Engineering 57:3, pages 641-651.
Crossref
S. Marimuthu, S.G. Ponnambalam & N. Jawahar. (2009) Threshold accepting and Ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Materials Processing Technology 209:2, pages 1026-1041.
Crossref
Chao-Tang Tseng & Ching-Jong Liao. (2008) A discrete particle swarm optimization for lot-streaming flowshop scheduling problem. European Journal of Operational Research 191:2, pages 360-373.
Crossref
Lotfi K. Gaafar, Sherif A. Masoud & Ashraf O. Nassef. (2008) A particle swarm-based genetic algorithm for scheduling in an agile environment. Computers & Industrial Engineering 55:3, pages 707-720.
Crossref
Rong-Hwa Huang & Chang-Lin Yang. (2008) Overlapping production scheduling planning with multiple objectives—An ant colony approach. International Journal of Production Economics 115:1, pages 163-170.
Crossref
F.T.S. Chan, T.C. Wong & L.Y. Chan. (2008) Lot streaming for product assembly in job shop environment. Robotics and Computer-Integrated Manufacturing 24:3, pages 321-331.
Crossref
Subhash C. Sarin, Adar A. Kalir & Ming Chen. (2008) A single-lot, unified cost-based flow shop lot-streaming problem. International Journal of Production Economics 113:1, pages 413-424.
Crossref
F.T.S. Chan, T.C. Wong & L.Y. Chan. (2008) The Application of Lot Streaming to Assembly Job Shop under Resource Constraints. IFAC Proceedings Volumes 41:2, pages 14852-14857.
Crossref
Felix T. S. Chan, T. C. Wong & L. Y. Chan. (2007) Lot splitting under different job shop conditions. Lot splitting under different job shop conditions.
KwanWoo Kim & In-Jae Jeong. (2007) Flow Shop Scheduling with No-wait Flexible Lot Streaming using Adaptive Genetic Algorithm. Flow Shop Scheduling with No-wait Flexible Lot Streaming using Adaptive Genetic Algorithm.
Sang M. Lee & Arben A. Asllani. (2004) Job scheduling with dual criteria and sequence-dependent setups: mathematical versus genetic programming. Omega 32:2, pages 145-153.
Crossref
F.T.S. Chan, T.C. Wong & P.L.Y. Chan. (2004) Equal size lot streaming to job-shop scheduling problem using genetic algorithms. Equal size lot streaming to job-shop scheduling problem using genetic algorithms.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.