James C. Chen, Tzu-Li Chen & Hsiao-Ching Hung. (2020) Capacity allocation with lot splitting in photolithography area using hybrid genetic algorithm based on self-tuning strategy. Computers & Industrial Engineering 148, pages 106656.
Crossref
A S Indrapriyatna & H Triha. (2018) A Modified Branch and Bound Algorithm for Batch Scheduling in Discrete Manufacture System. IOP Conference Series: Materials Science and Engineering 319, pages 012074.
Crossref
Tao Meng, Jun-hua Duan, Quan-ke Pan & Qing-da Chen. (2017) An enhanced migrating birds optimization for a lot-streaming flow shop scheduling problem. An enhanced migrating birds optimization for a lot-streaming flow shop scheduling problem.
Kesheng Lu & Lingzhi Wang. (2013) A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems. A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems.
Rock Lin & Ching-Jong Liao. (2012) A case study of batch scheduling for an assembly shop. International Journal of Production Economics 139:2, pages 473-483.
Crossref
Hong-yan Sang & Jun-hua Duan. (2012) An efficient discrete artificial bee colony algorithm for total flowtime lot-streaming flowshop. An efficient discrete artificial bee colony algorithm for total flowtime lot-streaming flowshop.
Quan-Ke Pan & Rubén Ruiz. (2012) An estimation of distribution algorithm for lot-streaming flow shop problems with setup times. Omega 40:2, pages 166-180.
Crossref
Quan-Ke Pan, M. Fatih Tasgetiren, P.N. Suganthan & T.J. Chua. (2011) A discrete artificial bee colony algorithm for the lot-streaming flow shop scheduling problem. Information Sciences 181:12, pages 2455-2468.
Crossref
Quan-Ke Pan, P.N. Suganthan, J.J. Liang & M. Fatih Tasgetiren. (2011) A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem. Expert Systems with Applications 38:4, pages 3252-3259.
Crossref
Jun-Hua Duan, Quan-ke Pan, KaiZhuo Gao, Junqing Li & Zhenqiang Bao. (2010) Scheduling the lot-streaming flow shop problem using a shuffled frog-leaping algorithm. Scheduling the lot-streaming flow shop problem using a shuffled frog-leaping algorithm.
Hong-yan Sang. (2010) A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems. A discrete differential evolution algorithm for lot-streaming flow shop scheduling problems.
Quan-Ke Pan, Mehmet Fatih Tasgetiren, Ponnuthurai Nagaratnam Suganthan & Yun-Chia Liang. (2010) Solving lot-streaming flow shop scheduling problems using a discrete harmony search algorithm. Solving lot-streaming flow shop scheduling problems using a discrete harmony search algorithm.
Yossi Bukchin, Michael Masin & Rinat Kirshner. (2010)
Modeling and analysis of multiobjective lot splitting for
N
‐product
M
‐machine flowshop lines
. Naval Research Logistics (NRL) 57:4, pages 354-366.
Crossref
Quan-Ke Pan, Jun-hua Duan, J. J. Liang, Kaizhou Gao & Junqing Li. (2010) A novel discrete harmony search algorithm for scheduling lot-streaming flow shops. A novel discrete harmony search algorithm for scheduling lot-streaming flow shops.
S. Marimuthu, S.G. Ponnambalam & N. Jawahar. (2009) Threshold accepting and Ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Materials Processing Technology 209:2, pages 1026-1041.
Crossref
Chao-Tang Tseng & Ching-Jong Liao. (2008) A discrete particle swarm optimization for lot-streaming flowshop scheduling problem. European Journal of Operational Research 191:2, pages 360-373.
Crossref
Rong-Hwa Huang & Chang-Lin Yang. (2008) Overlapping production scheduling planning with multiple objectives—An ant colony approach. International Journal of Production Economics 115:1, pages 163-170.
Crossref
Ali Allahverdi, C.T. Ng, T.C.E. Cheng & Mikhail Y. Kovalyov. (2008) A survey of scheduling problems with setup times or costs. European Journal of Operational Research 187:3, pages 985-1032.
Crossref
Subhash C. Sarin, Adar A. Kalir & Ming Chen. (2008) A single-lot, unified cost-based flow shop lot-streaming problem. International Journal of Production Economics 113:1, pages 413-424.
Crossref
Inneke Van Nieuwenhuyse & Nico Vandaele. (2006) The impact of delivery lot splitting on delivery reliability in a two-stage supply chain. International Journal of Production Economics 104:2, pages 694-708.
Crossref
Inneke Van Nieuwenhuyse & Nico Vandaele. (2004) Determining the optimal number of sublots in a single-product, deterministic flow shop with overlapping operations. International Journal of Production Economics 92:3, pages 221-239.
Crossref
Gur Mosheiov, Daniel Oron & Yaacov Ritov. (2004) Flow‐shop batch scheduling with identical processing‐time jobs. Naval Research Logistics (NRL) 51:6, pages 783-799.
Crossref