109
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

A joint monitoring scheme for automatically controlled processes

Pages 1201-1210 | Received 01 Mar 2002, Accepted 01 Jun 2004, Published online: 17 Aug 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Shichang Du & Rui Zhang. (2016) Modelling and joint monitoring of input and output of systems with arbitrary order autoregressive disturbance. International Journal of Production Research 54:6, pages 1822-1838.
Read now
Shui-Pin Lee, David Shan-Hill Wong, Cheng-I Sun, Wun-Hwa Chen & Shi-Shang Jang. (2015) Integrated statistical process control and engineering process control for a manufacturing process with multiple tools and multiple products. Journal of Industrial and Production Engineering 32:3, pages 174-185.
Read now
M. Park, J. Kim, M.K. Jeong, A.M.S. Hamouda, K.N. Al-Khalifa & E.A. Elsayed. (2012) Economic cost models of integrated APC controlled SPC charts. International Journal of Production Research 50:14, pages 3936-3955.
Read now
Kaibo Wang & Fugee Tsung. (2008) An Adaptive T2 Chart for Monitoring Dynamic Systems. Journal of Quality Technology 40:1, pages 109-123.
Read now
Kaibo Wang & Fugee Tsung. (2007) Monitoring feedback-controlled processes using adaptive 2 schemes. International Journal of Production Research 45:23, pages 5601-5619.
Read now
C. Park. (2007) An algorithm for the properties of the integrated process control with bounded adjustments and EWMA monitoring. International Journal of Production Research 45:23, pages 5571-5587.
Read now

Articles from other publishers (23)

Wei Jiang, Terrence E. Murphy, Kwok-Leung Tsui & Yang Zhao. 2023. Springer Handbook of Engineering Statistics. Springer Handbook of Engineering Statistics 199 220 .
Elaine Allen & Chris Seaman. 2014. Wiley StatsRef: Statistics Reference Online. Wiley StatsRef: Statistics Reference Online.
Gyo-Young Cho & Jong Suk Park. (2013) Parameter estimation in a readjustment procedure in the multivariate integrated process control. Journal of the Korean Data and Information Science Society 24:6, pages 1275-1283.
Crossref
Xiaolei Zhang & Zhen He. (2013) Integrated statistical and engineering process control based on smooth transition autoregressive model. Transactions of Tianjin University 19:2, pages 147-156.
Crossref
Hironobu Kawamura, Ken Nishina, Masanobu Higashide & Tomomichi Suzuki. (2012) Control characteristics: a case study on semiconductor manufacturing. Asian Journal on Quality 13:1, pages 37-52.
Crossref
Li Zhang, Yanfeng Yang & Mei Liu. (2011) The Effect Analysis of Adjustment and Monitoring Based on the AR(2) Process. The Effect Analysis of Adjustment and Monitoring Based on the AR(2) Process.
Hai Yu Wang. (2011) Statistical Process Control on Time Delay Feedback Adjustment Process. Advanced Materials Research 211-212, pages 305-309.
Crossref
Wang Haiyu. (2010) Statistical process control with vary- parameter based on average product length. Statistical process control with vary- parameter based on average product length.
Changsoon Park. (2010) Linear filter model representations for integrated process control with repeated adjustments and monitoring. Journal of the Korean Statistical Society 39:2, pages 177-187.
Crossref
Qiuxia Sun & Xiangrong Wang. (2010) Economic design of integrating SPC and APC with quality constraints. Economic design of integrating SPC and APC with quality constraints.
Marion R. ReynoldsJrJr & Changsoon Park. (2009) CUSUM charts for detecting special causes in integrated process control. Quality and Reliability Engineering International 26:3, pages 199-221.
Crossref
Fujee Tsung & Kaibo Wang. 2010. Frontiers in Statistical Quality Control 9. Frontiers in Statistical Quality Control 9 19 35 .
Hai-yu Wang. (2009) Statistical process control on time delay feedback controlled processes. Statistical process control on time delay feedback controlled processes.
Chang-Soon Park & Jae-Heon Lee. (2009) A Readjustment Procedure after Signalling in the Integrated Process Control. Communications for Statistical Applications and Methods 16:3, pages 429-436.
Crossref
Kaibo Wang & Fugee Tsung. (2008) An adaptive dimension reduction scheme for monitoring feedback‐controlled processes. Quality and Reliability Engineering International 25:3, pages 283-298.
Crossref
Zhang Wu, Penghui Wang & Qinan Wang. (2008) A loss function-based adaptive control chart for monitoring the process mean and variance. The International Journal of Advanced Manufacturing Technology 40:9-10, pages 948-959.
Crossref
Changsoon Park & Marion R. Reynolds Jr.. (2008) Economic design of an integrated process control procedure with repeated adjustments and EWMA monitoring. Journal of the Korean Statistical Society 37:2, pages 155-174.
Crossref
. (2008) An Integrated Process Control Scheme Based on the Future Loss. Korean Journal of Applied Statistics 21:2, pages 247-264.
Crossref
V. K. Butte & L. C. Tang. 2008. Handbook of Performability Engineering. Handbook of Performability Engineering 203 223 .
Elaine Allen & Chris Seaman. 2007. Encyclopedia of Statistics in Quality and Reliability. Encyclopedia of Statistics in Quality and Reliability.
Wei Jiang, Lianjie Shu & Fugee Tsung. (2006) A Comparative Study of Joint Monitoring Schemes for APC Processes. Quality and Reliability Engineering International 22:8, pages 939-952.
Crossref
Kaibo Wang & Fugee Tsung. (2006) Monitoring Multivariate Processes Using an Adaptive T2 Chart. Monitoring Multivariate Processes Using an Adaptive T2 Chart.
Wei Jiang, Terrence Murphy & Kwok-Leung Tsui. 2006. Springer Handbook of Engineering Statistics. Springer Handbook of Engineering Statistics 173 192 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.