68
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

A Dual-Cost Heuristic For The Capacitated Lot Sizing Problem

Pages 67-72 | Received 01 Aug 1985, Published online: 09 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

Fayez F. Boctor. (2022) Single-machine capacitated lot-sizing and scheduling with delivery dates and quantities. International Journal of Production Research 60:24, pages 7345-7359.
Read now
Marco Caserta & Stefan Voß. (2021) Accelerating mathematical programming techniques with the corridor method. International Journal of Production Research 59:9, pages 2739-2771.
Read now
G. I. Zobolas, C. D. Tarantilis & G. Ioannou. (2008) Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling. International Journal of Production Research 46:12, pages 3359-3386.
Read now
LINET ÖZDAMAR & MEHMETALI BOZYEL. (2000) The capacitated lot sizing problem with overtime decisions and setup times. IIE Transactions 32:11, pages 1043-1057.
Read now

Articles from other publishers (17)

Marco A. Boschetti, Adam N. Letchford & Vittorio Maniezzo. (2023) Matheuristics: survey and synthesis. International Transactions in Operational Research 30:6, pages 2840-2866.
Crossref
G. Rius-Sorolla, J. Maheut, S. Estellés-Miguel & J. P. García-Sabater. (2020) Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes. Central European Journal of Operations Research 29:4, pages 1289-1315.
Crossref
Lisbeth Buschkühl, Florian Sahling, Stefan Helber & Horst Tempelmeier. (2008) Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spectrum 32:2, pages 231-261.
Crossref
E. Powell Robinson & F. Barry Lawrence. (2004) Coordinated Capacitated Lot-Sizing Problem with Dynamic Demand: A Lagrangian Heuristic. Decision Sciences 35:1, pages 25-53.
Crossref
B. Karimi, S.M.T. Fatemi Ghomi & J.M. Wilson. (2003) The capacitated lot sizing problem: a review of models and algorithms. Omega 31:5, pages 365-378.
Crossref
Hartmut Stadtler. (2003) Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows. Operations Research 51:3, pages 487-502.
Crossref
M.Selim Akturk & Siraceddin Onen. (2002) Dynamic lot sizing and tool management in automated manufacturing systems. Computers & Operations Research 29:8, pages 1059-1079.
Crossref
Ömer Kirca & Melih Kökten. (1994) A new heuristic approach for the multi-item dynamic lot sizing problem. European Journal of Operational Research 75:2, pages 332-341.
Crossref
Horst Tempelmeier & Matthias Derstroff. (1993) Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen und genereller Erzeugnisstruktur. OR Spektrum 15:2, pages 63-73.
Crossref
Kenneth R. Baker. 1993. Logistics of Production and Inventory. Logistics of Production and Inventory 571 627 .
Yaakov Roll & Reuven Karni. (1991) Multi-item, multi-level lot sizing with an aggregate capacity constraint. European Journal of Operational Research 51:1, pages 73-87.
Crossref
N. Singh & Divakar Rajamani. (1991) An incremental cost and resource smoothing heuristic for the capacitated lot sizing problem. Computers & Industrial Engineering 20:4, pages 469-474.
Crossref
Ömer Kirca. (1990) An efficient algorithm for the capacitated single item dynamic lot size problem. European Journal of Operational Research 45:1, pages 15-24.
Crossref
James M. Pruett & Vinay K. Vasudev. (2016) MOSES: Manufacturing Organization Simulation and Evaluation System. SIMULATION 54:1, pages 37-45.
Crossref
N. Singh & Divakar Rajamani. (1990) An incremental cost and resource smoothing heuristic for the capacitated lot sizing problem. Computers & Industrial Engineering 19:1-4, pages 42-46.
Crossref
William W. Trigeiro. (1989) A Simple Heuristic for Lot Sizing with Setup Times. Decision Sciences 20:2, pages 294-303.
Crossref
Chen Zhen & Zhang Renqian. (2015) A Single Item Lot Sizing Problem Considering Capital Flow and Trade Credit. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.