26
Views
41
CrossRef citations to date
0
Altmetric
Original Articles

Justifying New Technology Acquisition Through its Impact on the Cost of Running an Inventory Policy

&
Pages 284-291 | Received 01 Dec 1986, Published online: 30 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (12)

S. Sarkar & B. C. Giri. (2020) Stochastic supply chain model with imperfect production and controllable defective rate. International Journal of Systems Science: Operations & Logistics 7:2, pages 133-146.
Read now
B. C. Giri & S. Sharma. (2017) Integrated model for an imperfect production-inventory system with a generalised shipment policy, errors in quality inspection and ordering cost reduction. International Journal of Systems Science: Operations & Logistics 4:3, pages 260-274.
Read now
Kuo-Lung Hou. (2005) Economic production cycles and setup reduction in an imperfect production system. Journal of Statistics and Management Systems 8:2, pages 331-341.
Read now
K.-L. Hou & L.-C. Lin. (2004) Optimal production run length and capital investment in quality improvement with an imperfect production process. International Journal of Systems Science 35:2, pages 133-137.
Read now
Shu-Lu Hsu. (2004) Ordering cost reductions in joint inventory systems with time discounted. Journal of Information and Optimization Sciences 25:1, pages 63-75.
Read now
Liang-Yuh Ouyang & Hung-Chi Chang. (2002) Lot size reorder point inventory model with controllable lead time and set-up cost. International Journal of Systems Science 33:8, pages 635-642.
Read now
JAE-DONG HONG. (1995) The effects of manufacturing lead time and process quality in a multi-process production system. Production Planning & Control 6:4, pages 311-319.
Read now
CHANG SUP SUNG & WOON SIK LEE. (1995) SETUP COST REDUCTION IN A DYNAMIC LOT SIZE MODEL WITH MULTIPLE FINITE PRODUCTION RATES. Engineering Optimization 24:1, pages 19-37.
Read now
JAE-DONG HONG. (1994) Effects of WIP inventories on integrated production lot sizing in cellular manufacturing. International Journal of Production Research 32:5, pages 1001-1012.
Read now
JAE-DONG HONG, S. H. XU & J. C. HAYYA. (1993) Process quality improvement and setup reduction in dynamic lot-sizing. International Journal of Production Research 31:11, pages 2693-2708.
Read now
YOUNGK. SON. (1992) A Comprehensive Bibliography on Justification of Advanced Manufacturing Technologies. The Engineering Economist 38:1, pages 59-71.
Read now
M. SINAN KAYALlGIL. (1990) Part-mix allocation between automated and conventional manufacturing. International Journal of Production Research 28:10, pages 1847-1859.
Read now

Articles from other publishers (29)

Emre Berk, Onurcan Ayas & M. Ali Ülkü. (2023) Optimizing Process-Improvement Efforts for Supply Chain Operations under Disruptions: New Structural Results. Sustainability 15:17, pages 13117.
Crossref
Shaktipada Bhuniya, Sarla Pareek & Biswajit Sarkar. (2021) A supply chain model with service level constraints and strategies under uncertainty. Alexandria Engineering Journal 60:6, pages 6035-6052.
Crossref
S. Sarkar & B. C. Giri. (2018) A vendor–buyer integrated inventory system with variable lead time and uncertain market demand. Operational Research 20:1, pages 491-515.
Crossref
Sunil Tiwari, Shib Sankar Sana & Sumon Sarkar. (2017) Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A. Matemáticas 112:4, pages 1075-1099.
Crossref
M. Vijayashree & R. Uthayakumar. (2017) A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time. Journal of Industrial Engineering International 13:3, pages 393-416.
Crossref
Biswajit Sarkar, Arunava Majumder, Mitali Sarkar, Bikash Koli Dey & Gargi Roy. (2017) Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction. Journal of Industrial & Management Optimization 13:2, pages 1085-1104.
Crossref
Rustem Baris Yesilay, Ilker Murat Ar & Serdal Temel. (2015) The Relationship Between Direct Government Support for R&D and Patents in Emerging Economies: A Turkish Case Study. International Journal of Innovation and Technology Management 12:05, pages 1550021.
Crossref
Asieh Varyani, Amir Jalilvand-Nejad & Parviz Fattahi. (2014) Determining the optimum production quantity in three-echelon production system with stochastic demand. The International Journal of Advanced Manufacturing Technology 72:1-4, pages 119-133.
Crossref
W. L. Pearn, R. H. Su, M. W. Weng & C. H. Hsu. (2010) Optimal production run time for two-stage production system with imperfect processes and allowable shortages. Central European Journal of Operations Research 19:4, pages 533-545.
Crossref
Guido Voigt & Karl Inderfurth. (2009) Supply chain coordination and setup cost reduction in case of asymmetric information. OR Spectrum 33:1, pages 99-122.
Crossref
Guido VoigtGuido Voigt. 2011. Supply Chain Coordination in Case of Asymmetric Information. Supply Chain Coordination in Case of Asymmetric Information 45 66 .
Yu-Jen Lin. (2009) An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Computers & Industrial Engineering 56:4, pages 1597-1606.
Crossref
Kuo-Lung Hou. (2007) An EPQ model with setup cost and process quality as functions of capital expenditure. Applied Mathematical Modelling 31:1, pages 10-17.
Crossref
Hung-Chi Chang, Liang-Yuh Ouyang, Kun-Shan Wu & Chia-Huei Ho. (2006) Integrated vendor–buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research 170:2, pages 481-495.
Crossref
Liang-Yuh Ouyang, Cheng-Kang Chen & Hung-Chi Chang. (2002) Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Computers & Operations Research 29:12, pages 1701-1717.
Crossref
CHUNG‐LUN LI, STEVEN J. ERLEBACHER & DEAN H. KROPP. (2009) INVESTMENT IN SETUP COST, LEAD TIME, AND DEMAND PREDICTABILITY IMPROVEMENT IN THE EOQ MODEL. Production and Operations Management 6:4, pages 341-351.
Crossref
Jae-Dong Hong. (1997) Optimal production cycles, procurement schedules, and joint investment in an imperfect production system. European Journal of Operational Research 100:3, pages 413-428.
Crossref
Antonio Batocchio & Shahrukh Adi Irani. (1996) Design of manufacturing cells: strategy, software and performance measurement. Gestão & Produção 3:3, pages 248-261.
Crossref
Jae-Dong Hong, Seung-Lae Kim & Jack C. Hayya. (1996) Dynamic setup reduction in production lot sizing with nonconstant deterministic demand. European Journal of Operational Research 90:1, pages 182-196.
Crossref
Moustapha Diaby. (1995) Optimal setup time reduction for a single product with dynamic demands. European Journal of Operational Research 85:3, pages 532-540.
Crossref
Jae-Dong Hong & Jack C. Hayya. (1995) Joint investment in quality improvement and setup reduction. Computers & Operations Research 22:6, pages 567-574.
Crossref
Philip J. Lederer & Vinod R. Singhal. (1994) The effect of financing decisions on the choice of manufacturing technologies. International Journal of Flexible Manufacturing Systems 6:4, pages 333-360.
Crossref
Michael Corbey & Rutger Jansen. (1993) The economic lot size and relevant costs. International Journal of Production Economics 30-31, pages 519-530.
Crossref
Jae-Dong Hong & Jack C. Hayya. (1993) Dynamic lot sizing with setup reduction. Computers & Industrial Engineering 24:2, pages 209-218.
Crossref
Jae-Dong Hong & Jack C. Hayya. (1992) An (s,Q) policy with setup reduction in a single-stage batch manufacturing system. Computers & Operations Research 19:1, pages 9-19.
Crossref
M. Jeya Chandra & Catherine M. Harmonosky. 1992. Economics of Advanced Manufacturing Systems. Economics of Advanced Manufacturing Systems 113 125 .
Yigal Gerchak & Mahmut Parlar. (1991) Investing in reducing lead-time randomness in continuous-review inventory models. Engineering Costs and Production Economics 21:2, pages 191-197.
Crossref
Vinod R. Singhal & Amitabh S. Raturi. (1990) The effect of inventory decisions and parameters on the opportunity cost of capital. Journal of Operations Management 9:3, pages 406-420.
Crossref
David F. Rogers. 1989. Cost Analysis Applications of Economics and Operations Research. Cost Analysis Applications of Economics and Operations Research 298 310 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.