85
Views
56
CrossRef citations to date
0
Altmetric
Original Articles

When Is The Economic Lot Scheduling Problem Easy?

&
Pages 11-20 | Received 01 Mar 1987, Published online: 31 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (19)

João Vitor Tomotani & Marco Aurélio de Mesquita. (2018) Lot sizing and scheduling: a survey of practices in Brazilian companies. Production Planning & Control 29:3, pages 236-246.
Read now
Heechul Bae, Ilkyeong Moon & Wonyoung Yun. (2016) A time-varying lot sizes approach for the economic lot scheduling problem with returns. International Journal of Production Research 54:11, pages 3380-3396.
Read now
Daniel Adelman & Christiane Barz. (2014) A price-directed heuristic for the economic lot scheduling problem. IIE Transactions 46:12, pages 1343-1356.
Read now
Onur A. Kilic, Renzo Akkerman, Dirk Pieter van Donk & Martin Grunow. (2013) Intermediate product selection and blending in the food processing industry. International Journal of Production Research 51:1, pages 26-42.
Read now
Jiao Wang, Xueping Li & Xiaoyan Zhu. (2012) Intelligent dynamic control of stochastic economic lot scheduling by agent-based reinforcement learning. International Journal of Production Research 50:16, pages 4381-4395.
Read now
Shahram Taj, Galia Novakova Nedeltcheva, George Pfeil & Michael Roumaya. (2012) A spread-sheet model for efficient production and scheduling of a manufacturing line/cell. International Journal of Production Research 50:4, pages 1141-1154.
Read now
Vinay A. Shirodkar, V. Madhusudanan Pillai & R. Sridharan. (2011) On the feasibility of sequence-dependent economic lot scheduling problem. International Journal of Production Research 49:10, pages 2925-2939.
Read now
I. K. Moon, B. C. Cha & H. C. Bae. (2006) Hybrid genetic algorithm for group technology economic lot scheduling problem. International Journal of Production Research 44:21, pages 4551-4568.
Read now
Joongkyu Choi, J. James Cao, H. Edwin Romeijn, Joseph Geunes & ShermanX. Bai. (2005) A stochastic multi-item inventory model with unequal replenishment intervals and limited warehouse capacity. IIE Transactions 37:12, pages 1129-1141.
Read now
BRUCEH. FAALAND, THOMASG. SCHMITT & ANTONIO ARREOLA-RISA. (2004) Economic lot scheduling with lost sales and setup times. IIE Transactions 36:7, pages 629-640.
Read now
I. Moon, E. A. Silver & S. Choi. (2002) Hybrid genetic algorithm for the economic lot-scheduling problem. International Journal of Production Research 40:4, pages 809-824.
Read now
ILKYEONG MOON, JUHO HAHM & CHUL LEE. (1998) The effect of the stabilization period on the economic lot scheduling problem. IIE Transactions 30:11, pages 1009-1017.
Read now
KARLAE. BOURLAND & CANDACEA. YANO. (1997) A comparison of solution approaches for the fixed-sequence economic lot scheduling problem. IIE Transactions 29:2, pages 103-108.
Read now
RENATO DE MATTA & MONIQUE GUIGNARD. (1995) The performance of rolling production schedules in a process industry. IIE Transactions 27:5, pages 564-573.
Read now
C. KOULAMAS. (1995) Application of ELSP solution techniques to the deterministic robotic scheduling problem. International Journal of Production Research 33:10, pages 2933-2944.
Read now
RASOUL HAJI & MASUD MANSURI. (1995) Optimum common cycle for scheduling a single-machine multiproduct system with a budgetary constraint. Production Planning & Control 6:2, pages 151-156.
Read now
ILKYEONG MOON, GUILLERMO GALLEGO & DAVID SIMCHI-LEVI. (1991) Controllable production rates in a family production context. International Journal of Production Research 29:12, pages 2459-2470.
Read now
GUILLERMO GALLEGO$suffix/text()$suffix/text(). (1990) An Extension to the Class of Easy Economic Lot Scheduling Problems. IIE Transactions 22:2, pages 189-190.
Read now
HSIU-WEI KUO & ROBERTR. INMAN. (1990) A practical heuristic for the group technology economic lot scheduling problem. International Journal of Production Research 28:4, pages 709-722.
Read now

Articles from other publishers (37)

Mozart B.C. Menezes, Hamed Jalali & Alejandro Lamas. (2021) One too many: Product proliferation and the financial performance in manufacturing. International Journal of Production Economics 242, pages 108285.
Crossref
James A. Rappold & Keenan D. Yoho. (2014) Setting safety stocks for stable rotation cycle schedules. International Journal of Production Economics 156, pages 146-158.
Crossref
David Simchi-Levi, Xin Chen & Julien BramelDavid Simchi-Levi, Xin Chen & Julien Bramel. 2014. The Logic of Logistics. The Logic of Logistics 117 136 .
Fidel Torres & Gonzalo Mejía. 2013. Supply Chain Management. Supply Chain Management 1239 1249 .
Christoph H. Glock. (2012) Coordination of a production network with a single buyer and multiple vendors. International Journal of Production Economics 135:2, pages 771-780.
Crossref
Ramesh Bollapragada, Federico Della Croce & Marco Ghirardi. (2011) Discrete-time, economic lot scheduling problem on multiple, non-identical production lines. European Journal of Operational Research 215:1, pages 89-96.
Crossref
Fidel Torres & Gonzalo Mejía. 2011. Supply Chain Optimization, Management and Integration. Supply Chain Optimization, Management and Integration 153 163 .
James J. Cochran, Louis A. CoxJr.Jr., Pinar Keskinocak, Jeffrey P. Kharoufeh & J. Cole SmithRajesh Tyagi & Srinivas Bollapragada. 2011. Wiley Encyclopedia of Operations Research and Management Science. Wiley Encyclopedia of Operations Research and Management Science.
Pilar I. Vidal-Carreras. (2010) Enfoques para la Resolución del Problema ELSP. WPOM-Working Papers on Operations Management 1:2, pages 31.
Crossref
O.A. Kilic, R. Akkerman, M. Grunow & D.P. van Donk. (2009) Modeling intermediate product selection under production and storage capacity limitations in food processing. Modeling intermediate product selection under production and storage capacity limitations in food processing.
Avijit Banerjee. (2009) Simultaneous determination of multiproduct batch and full truckload shipment schedules. International Journal of Production Economics 118:1, pages 111-117.
Crossref
Selma Öner & Taner Bilgiç. (2008) Economic lot scheduling with uncontrolled co-production. European Journal of Operational Research 188:3, pages 793-810.
Crossref
Asif S. Raza & Ali Akgunduz. (2008) A comparative study of heuristic algorithms on Economic Lot Scheduling Problem. Computers & Industrial Engineering 55:1, pages 94-109.
Crossref
Rasoul Haji, Alireza Haji, Mehdi Sajadifar & Saeed Zolfaghari. (2008) Lot sizing with non-zero setup times for rework. Journal of Systems Science and Systems Engineering 17:2, pages 230-240.
Crossref
S. A. Raza, A. Akgunduz & M. Y. Chen. (2006) A tabu search algorithm for solving economic lot scheduling problem. Journal of Heuristics 12:6, pages 413-426.
Crossref
Alireza Haji, Rasoul Haji & S.M. Sajadifar. (2006) Lot Sizing with Non-Zero Setup Times for Rework. Lot Sizing with Non-Zero Setup Times for Rework.
S.A. Torabi, B. Karimi & S.M.T. Fatemi Ghomi. (2005) The common cycle economic lot scheduling in flexible job shops: The finite horizon case. International Journal of Production Economics 97:1, pages 52-65.
Crossref
Alessandro AlleJose M. PintoLazaros G. Papageorgiou. (2004) The Economic Lot Scheduling Problem under Performance Decay. Industrial & Engineering Chemistry Research 43:20, pages 6463-6475.
Crossref
B.C. Giri, I. Moon & W.Y. Yun. (2003) Scheduling economic lot sizes in deteriorating production systems. Naval Research Logistics (NRL) 50:6, pages 650-661.
Crossref
Raffaele Pesenti & Walter Ukovich. (2003) Economic lot scheduling on multiple production lines with resource constraints. International Journal of Production Economics 81-82, pages 469-481.
Crossref
Gin Hor Chan & Yuyue Song. (2001) Rotation cycle schedulings for multi-item production systems. European Journal of Operational Research 135:2, pages 361-372.
Crossref
Ramesh Bollapragada & Uday Rao. (1999) Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines. Management Science 45:6, pages 889-904.
Crossref
Somkiat Eiamkanchanalai & Avijit Banerjee. (1999) Production lot sizing with variable production rate and explicit idle capacity cost. International Journal of Production Economics 59:1-3, pages 251-259.
Crossref
Moutaz Khouja, Zgibniew Michalewicz & Michael Wilmot. (1998) The use of genetic algorithms to solve the economic lot size scheduling problem. European Journal of Operational Research 110:3, pages 509-524.
Crossref
Philip C. Jones, Leon N. Moses & James L. Zydiak. (1998) Inventory investment, product cycles, and the imperfectly competitive firm. International Journal of Production Economics 54:3, pages 267-276.
Crossref
Moutaz Khouja. (1997) The scheduling of economic lot sizes on volume flexible production systems. International Journal of Production Economics 48:1, pages 73-86.
Crossref
Renato De Matta & Tan Miller. (2009) EVALUATING THE TRADE‐OFFS BETWEEN IDLING AND SHUTTING DOWN PRODUCTION LINES IN PROCESS INDUSTRIES. Production and Operations Management 5:4, pages 371-390.
Crossref
Mohsen Elhafsi & Sherman X. Bai. (1996) Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times. Journal of Global Optimization 9:2, pages 183-216.
Crossref
Guillermo Gallego & Ilkyeong Moon. (1995) Strategic investment to reduce setup times in the economic lot scheduling problem. Naval Research Logistics 42:5, pages 773-790.
Crossref
Christos P. Koulamas. (1995) Simultaneous determination of the cutting speed and lot size values in machining systems. European Journal of Operational Research 84:2, pages 356-370.
Crossref
Gregory Dobson & Candace Arai Yano. (1994) Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research 75:2, pages 441-461.
Crossref
Roelof Kuik, Marc Salomon & Luk N. van Wassenhove. (1994) Batching decisions: structure and models. European Journal of Operational Research 75:2, pages 243-263.
Crossref
Derek Atkins & Shrikanta De. (1993) A performance bound on single cycle lot-sizing policies for an assembly system with stochastic demand. Operations Research Letters 14:5, pages 265-273.
Crossref
Gerard M. Campbell. (2007) Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals. Decision Sciences 23:2, pages 312-331.
Crossref
Robert R. Inman, Philip C. Jones & Guillermo M. Gallego. (1991) Economic lot scheduling of fully loaded processes with external setups. Naval Research Logistics 38:5, pages 699-713.
Crossref
Ali Sharifnia, Michael Caramanis & Stanley B. Gershwin. (1991) Dynamic setup scheduling and flow control in manufacturing systems. Discrete Event Dynamic Systems 1:2, pages 149-175.
Crossref
C.A. Yano. (1990) The product cycling problem in systems with uncertain production yields. IEEE Transactions on Robotics and Automation 6:6, pages 640-651.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.