57
Views
41
CrossRef citations to date
0
Altmetric
Original Articles

Component Inventory Costs in an Assembly Problem with Uncertain Supplier Lead-Times

Pages 112-121 | Received 01 Apr 1987, Published online: 30 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Azeem Shami & Ashesh Kumar Sinha. (2023) Simulation based model for component replenishment in multi-product ATO systems with shared resources. International Journal of Modelling and Simulation 43:6, pages 864-878.
Read now
Qinyu Song, Yaodong Ni & Dan A. Ralescu. (2021) The impact of lead-time uncertainty in product configuration. International Journal of Production Research 59:3, pages 959-981.
Read now
B. C. Giri & M. Masanta. (2020) Developing a closed-loop supply chain model with price and quality dependent demand and learning in production in a stochastic environment. International Journal of Systems Science: Operations & Logistics 7:2, pages 147-163.
Read now
Oussama Ben-Ammar & Alexandre Dolgui. (2018) Optimal order release dates for two-level assembly systems with stochastic lead times at each level. International Journal of Production Research 56:12, pages 4226-4242.
Read now
Dan Trietsch. (2006) Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result. International Journal of Production Research 44:4, pages 627-637.
Read now

Articles from other publishers (36)

O. Ben-Ammar, A. Dolgui, F. Hnaien & M.-A. Ould-Louly. (2022) Supply planning and inventory control under lead time uncertainty: a literature review and future directions. IFAC-PapersOnLine 55:10, pages 2749-2754.
Crossref
Oussama Ben-Ammar, Philippe Castagliola, Alexandre Dolgui & Faicel Hnaien. (2020) A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead times. Computers & Industrial Engineering 149, pages 106794.
Crossref
Hasan Murat Afsar, Oussama Ben-Ammar, Alexandre Dolgui & Faicel Hnaien. (2020) Supplier Replacement Model in a One-Level Assembly System under Lead-Time Uncertainty. Applied Sciences 10:10, pages 3366.
Crossref
Kenneth R. Baker & Dan Trietsch. 2018. Principles of Sequencing and Scheduling. Principles of Sequencing and Scheduling 537 570 .
Shi Chen & Hau Lee. (2017) Incentive Alignment and Coordination of Project Supply Chains. Management Science 63:4, pages 1011-1025.
Crossref
M.A. Hoque. (2013) A manufacturer–buyer integrated inventory model with stochastic lead times for delivering equal- and/or unequal-sized batches of a lot. Computers & Operations Research 40:11, pages 2740-2751.
Crossref
M.A. Hoque. (2013) A vendor–buyer integrated production–inventory model with normal distribution of lead time. International Journal of Production Economics 144:2, pages 409-417.
Crossref
Mohamed-Aly Louly & Alexandre Dolgui. (2013) Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint. International Journal of Production Economics 143:1, pages 35-40.
Crossref
Oussama Ben Ammar, Alexandre Dolgui, Faicel Hnaien & Mohamed Aly Louly. (2013) Supply planning and inventory control under lead time uncertainty: A review. IFAC Proceedings Volumes 46:9, pages 359-370.
Crossref
F. Hnaien, H.M. Afsar & A. Dolgui. (2013) Integration of additional purchase cost to reduce the lead time uncertainty for one level assembly system. IFAC Proceedings Volumes 46:9, pages 383-388.
Crossref
Mohamed-Aly Louly, Alexandre Dolgui & Abdulrahman Al-Ahmari. (2011) Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint. Journal of Intelligent Manufacturing 23:6, pages 2485-2495.
Crossref
Dan Trietsch. 2012. Computer Engineering. Computer Engineering 484 495 .
Dan Trietsch. 2012. Project Management Techniques and Innovations in Information Technology. Project Management Techniques and Innovations in Information Technology 21 32 .
Mohamed-Aly Louly & Alexandre Dolgui. (2011) Optimal time phasing and periodicity for MRP with POQ policy. International Journal of Production Economics 131:1, pages 76-86.
Crossref
Faicel Hnaien, Xavier Delorme & Alexandre Dolgui. (2010) Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times. Computers & Operations Research 37:11, pages 1835-1843.
Crossref
Xiang Fang & Yunzeng Wang. (2009) A Model for Partial Product Complementarity and Strategic Production Decisions under Demand Uncertainty. Production and Operations Management 19:3, pages 322-342.
Crossref
Dan Trietsch. (2010) Optimal Crashing and Buffering of Stochastic Serial Projects. International Journal of Information Technology Project Management 1:1, pages 30-41.
Crossref
Yongbo Xiao, Jian Chen & Chung-Yee Lee. (2010) Optimal decisions for assemble-to-order systems with uncertain assembly capacity. International Journal of Production Economics 123:1, pages 155-165.
Crossref
Mohamed-Aly Ould Louly & Alexandre Dolgui. (2009) Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm. European Journal of Operational Research 199:3, pages 723-731.
Crossref
Yimin Wang & Brian Tomlin. (2009) To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating. Naval Research Logistics (NRL) 56:8, pages 766-779.
Crossref
Ke Fu. (2009) Inventory decisions for an assemble-to-order system with two ordering opportunities and multiple transportation modes. Inventory decisions for an assemble-to-order system with two ordering opportunities and multiple transportation modes.
Ke Fu, Vernon N. Hsu & Chung-Yee Lee. (2009) Note —Optimal Component Acquisition for a Single-Product, Single-Demand Assemble-to-Order Problem with Expediting . Manufacturing & Service Operations Management 11:2, pages 229-236.
Crossref
Kenneth R. Baker & Dan Trietsch. 2009. Principles of Sequencing and Scheduling. Principles of Sequencing and Scheduling 418 443 .
Douglas J. Thomas, Donald P. Warsing & Xueyi Zhang. (2009) Forecast Updating and Supplier Coordination for Complementary Component Purchases. Production and Operations Management 18:2, pages 167-184.
Crossref
Mohamed-Aly Louly & Alexandre Dolgui. (2009) Generalized Newsboy model for MRP parameterization under uncertainties. IFAC Proceedings Volumes 42:4, pages 834-839.
Crossref
Vernon Ning Hsu, Chung Yee Lee & Kut C. So. (2007) Managing components for assemble‐to‐order products with lead‐time‐dependent pricing: The full‐shipment model. Naval Research Logistics (NRL) 54:5, pages 510-523.
Crossref
Ke Fu, Vernon Ning Hsu & Chung-Yee Lee. (2006) Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity. Operations Research 54:6, pages 1137-1150.
Crossref
Yao Zhao & David Simchi-Levi. (2006) Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times. Operations Research 54:4, pages 706-724.
Crossref
Eungab Kim, Kaphoon Lee & Suk-Ho Kang. (2005) Optimal purchasing policy in a two-component assembly system with different purchasing contracts for each component. Mathematical Methods of Operations Research 63:2, pages 301-327.
Crossref
Vernon Ning Hsu, Chung Yee Lee & Kut C. So. (2006) Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing. Management Science 52:3, pages 337-351.
Crossref
Sven Axsäter. 2006. Stochastic Modeling of Manufacturing Systems. Stochastic Modeling of Manufacturing Systems 333 344 .
Dan Trietsch. (2005) The effect of systemic errors on optimal project buffers. International Journal of Project Management 23:4, pages 267-274.
Crossref
Dan Trietsch. (2005) Why a Critical Path by Any Other Name Would Smell Less Sweet?. Project Management Journal 36:1, pages 27-36.
Crossref
Jing-Sheng Song, Candace A. Yano & Panupol Lerssrisuriya. (2000) Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty. Manufacturing & Service Operations Management 2:3, pages 287-296.
Crossref
Okitsugu Fujiwara & Dayani Sedarage. (1997) An optimal (Q,r) policy for a multipart assembly system under stochastic part procurement lead times. European Journal of Operational Research 100:3, pages 550-556.
Crossref
Ricardo Ernst & David F. Pyke. (1992) Component part stocking policies. Naval Research Logistics 39:4, pages 509-529.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.