Sharon Rose J.PRC Gopal & Ramkumar M. Arputham. (2021) Operational efficiency of tow trucks: a case based evidence from an Indian automobile manufacturer. Journal of Facilities Management 19:3, pages 304-326.
Crossref
Susmita Bandyopadhyay. 2018. Intelligent Vehicles and Materials Transportation in the Manufacturing Sector. Intelligent Vehicles and Materials Transportation in the Manufacturing Sector
27
76
.
Adamu I. Abubakar, Elbara Eldaw Elnour Mohamed & Akram M. Zeki. (2017) The Dynamics of Data Packet in Transmission Session. IEEE Access 5, pages 4329-4339.
Crossref
Hamed Fazlollahtabar & Mohammad Saidi-Mehrabad. (2013) RETRACTED ARTICLE: Methodologies to Optimize Automated Guided Vehicle Scheduling and Routing Problems: A Review Study. Journal of Intelligent & Robotic Systems 77:3-4, pages 525-545.
Crossref
Vinicius F. Carida, Orides Morandin, Paulo R. Cerioni & Carlos C.M. Tuma. (2014) Prediction Model Using Coverability Tree from a Modeling in Petri Nets Applied in AGVs Dispatching. Prediction Model Using Coverability Tree from a Modeling in Petri Nets Applied in AGVs Dispatching.
Bo Xing & Wen-Jing Gao. 2014. Computational Intelligence in Remanufacturing. Computational Intelligence in Remanufacturing
171
185
.
Meir J. Rosenblatt. 2013. Encyclopedia of Operations Research and Management Science. Encyclopedia of Operations Research and Management Science
945
948
.
Orides Morandin, Vinicius F. Carida, Edilson R. R. Kato & Carlos C. M. Tuma. (2011) Adaptive genetic fuzzy, predictive and multiobjective approach for AGVs dispatching. Adaptive genetic fuzzy, predictive and multiobjective approach for AGVs dispatching.
Shigang Song, Aiping Li & Liyun Xu. (2008) AGV Dispatching Strategy Based on Theory of Constraints. AGV Dispatching Strategy Based on Theory of Constraints.
J. Jerald, P. Asokan, R. Saravanan & A. Delphin Carolina Rani. (2005) Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm. The International Journal of Advanced Manufacturing Technology 29:5, pages 584-589.
Crossref
Iris F.A. Vis. (2006) Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research 170:3, pages 677-709.
Crossref
Ümit Bilge, Gökçe Esenduran, Nebibe Varol, Zeynep Öztürk, Burcu Aydın & Aysun Alp. (2006) Multi-attribute responsive dispatching strategies for automated guided vehicles. International Journal of Production Economics 100:1, pages 65-75.
Crossref
Pyung-Hoi Koo, Jaejin Jang & Jungdae Suh. (2005) Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first. International Journal of Flexible Manufacturing Systems 17:1, pages 23-38.
Crossref
Meir J. Rosenblatt. 2001. Encyclopedia of Operations Research and Management Science. Encyclopedia of Operations Research and Management Science
492
495
.
A.J.R.M. Gademann & S.L. van de Velde. (2000) Positioning automated guided vehicles in a loop layout. European Journal of Operational Research 127:3, pages 565-573.
Crossref
Sang Hwi Kim & Hark Hwang. (1999) An adaptive dispatching algorithm for automated guided vehicles based on an evolutionary process. International Journal of Production Economics 60-61, pages 465-472.
Crossref
P. Lacomme, N. Tchernev & C. Chu. (1999) An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport. An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport.
Hark Hwang & Sang Hwi Kim. (1998) Development of dispatching rules for automated guided vehicle systems. Journal of Manufacturing Systems 17:2, pages 137-143.
Crossref
Chang Wan Kim, J. M. A. Tanchoco & Pyung-Hoi Koo. (1997) Deadlock Prevention in Manufacturing Systems With AGV Systems: Banker’s Algorithm Approach. Journal of Manufacturing Science and Engineering 119:4B, pages 849-854.
Crossref
Gündüz Ulusoy, Funda Sivrikaya-Şerifoǧlu & Ümit Bilge. (1997) A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Computers & Operations Research 24:4, pages 335-351.
Crossref
Fataneh Taghaboni-Dutta. (1997) A value-added approach for automated guided vehicle task assignment. Journal of Manufacturing Systems 16:1, pages 24-34.
Crossref
Joom-Mock Um, Kil-Soo Kim, Bang-Jim Yam & Hark Hwang. (1996) Determination of an optimal configuration of operating policies for direct-input-output manufacturing systems using the Taguchi method. Computers & Industrial Engineering 31:3-4, pages 555-560.
Crossref
Qi Su & F.F. Chen. (1996) Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems. IEEE Transactions on Robotics and Automation 12:1, pages 22-30.
Crossref
Yavuz A. Bozer & Chih-kuan Yen. (1996) Intelligent dispatching rules for trip-based material handling systems. Journal of Manufacturing Systems 15:4, pages 226-239.
Crossref
F. Frank Chen & Qi Su. (1995) Scheduling single-gripper gantry robots in tightly coupled serial production lines: Optimum vs. push/pull concept based sequences. Journal of Manufacturing Systems 14:3, pages 139-147.
Crossref
C. W. Kim & J. M. A. Tanchoco. 1994. Material Flow Systems in Manufacturing. Material Flow Systems in Manufacturing
239
272
.
Ihsan Sabuncuoglu & Don L. Hommertzheim. (1993) Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules. International Journal of Flexible Manufacturing Systems 5:4, pages 301-323.
Crossref
Leon F. McGinnis. 1989. Advanced Information Technologies for Industrial Material Flow Systems. Advanced Information Technologies for Industrial Material Flow Systems
309
328
.