Khelil Kassoul, Naoufel Cheikhrouhou & Nicolas Zufferey. (2023) Adaptive Dynamic Jumping Particle Swarm Optimization for Buffer Allocation in Unreliable Production Lines. IEEE Access 11, pages 90410-90420.
Crossref
Paulo Afonso, Vishad Vyas, Ana Antunes, Sérgio Silva & Boris P. J. Bret. (2021) A Stochastic Approach for Product Costing in Manufacturing Processes. Mathematics 9:18, pages 2238.
Crossref
Özgün Yücel & Önder Bulut. (2021) Exact analysis of production lines with Coxian-2-distributed processing times and parallel machines. Computers & Industrial Engineering 159, pages 107471.
Crossref
Thiago Cantos Lopes, Adalberto Sato Michels, Ricardo Lüders & Leandro Magatão. (2020) A simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly lines. Computers & Operations Research 115, pages 104863.
Crossref
Wararit Panichkitkosolkul. (2019) Performance of Methods for Testing the Ratio of Coefficients of Variation of Two Gamma Distributions. Performance of Methods for Testing the Ratio of Coefficients of Variation of Two Gamma Distributions.
H. S. R. Martins, F. R. B. Cruz, A. R. Duarte & F. L. P. Oliveira. (2019) Modeling and optimization of buffers and servers in finite queueing networks. OPSEARCH 56:1, pages 123-150.
Crossref
Amir Rastpour, Mehmet A. Begen, Alexander V. Louie & Gregory S. Zaric. (2018) Variability of waiting times for the 4 most prevalent cancer types in Ontario: a retrospective population-based analysis. CMAJ Open 6:2, pages E227-E234.
Crossref
Salvador Hernandez-Gonzalez & Manuel Dario Hernandez Ripalda. 2018. Managerial Approaches Toward Queuing Systems and Simulations. Managerial Approaches Toward Queuing Systems and Simulations
172
211
.
Nabil Nahas. (2014) Buffer allocation and preventive maintenance optimization in unreliable production lines. Journal of Intelligent Manufacturing 28:1, pages 85-93.
Crossref
Edwards A. Silver, David F. Pyke & Douglas J. Thomas. 2016. Inventory and Production Management in Supply Chains. Inventory and Production Management in Supply Chains
661
712
.
Tom McNamara, Sabry Shaaban & Sarah Hudson. (2016) Fifty years of the bowl phenomenon. Journal of Manufacturing Systems 41, pages 1-7.
Crossref
Suffi Ur Rehman & Lianyu Zheng. (2015) Operation Time Variability in Multi Product Unpaced Production Lines. International Journal of Engineering and Technology 7:6, pages 490-496.
Crossref
A. Costa, A. Alfieri, A. Matta & S. Fichera. (2015) A parallel tabu search for solving the primal buffer allocation problem in serial production systems. Computers & Operations Research 64, pages 97-112.
Crossref
Nabil Nahas & Mustapha Nourelfath. (2015) Buffer allocation, machine selection and preventive maintenance optimization in unreliable production lines. Buffer allocation, machine selection and preventive maintenance optimization in unreliable production lines.
Simge Yelkenci Kose & Ozcan Kilincci. (2015) Hybrid approach for buffer allocation in open serial production lines. Computers & Operations Research 60, pages 67-78.
Crossref
Mehmet Savsar. 2013. Management Innovations for Intelligent Supply Chains. Management Innovations for Intelligent Supply Chains
235
256
.
Sabry Shaaban & Sarah Hudson. (2011) Transient behaviour of unbalanced lines. Flexible Services and Manufacturing Journal 24:4, pages 575-602.
Crossref
Dan R. Staley & David S. Kim. (2012) Experimental results for the allocation of buffers in closed serial production lines. International Journal of Production Economics 137:2, pages 284-291.
Crossref
Sabry Shaaban, Tom McNamara & Sarah Hudson. (2012) Performance of Reliable and Unreliable Unpaced Production Lines with Uneven Buffer Allocation. IFAC Proceedings Volumes 45:6, pages 384-390.
Crossref
Suk-Jae JEONG & Hosang JUNG. (2012) Optimal Buffer Allocation in Flexible Manufacturing Systems Using Genetic Algorithm and Simulation. Journal of Advanced Mechanical Design, Systems, and Manufacturing 6:7, pages 1071-1080.
Crossref
Mehmet Savsar. (2011) Modeling of Hybrid Production Systems with Constant WIP and Unreliable Equipment. International Journal of Information Systems and Supply Chain Management 4:4, pages 46-66.
Crossref
H. Kıvanç Aksoy & Surendra M. Gupta. (2010) Optimal management of remanufacturing systems with server vacations. The International Journal of Advanced Manufacturing Technology 54:9-12, pages 1199-1218.
Crossref
Guy L. Curry & Richard M. FeldmanGuy L. Curry & Richard M. Feldman. 2011. Manufacturing Systems Modeling and Analysis. Manufacturing Systems Modeling and Analysis
281
320
.
H. Kıvanç Aksoy & Surendra M. Gupta. (2010) Near optimal buffer allocation in remanufacturing systems with N-policy. Computers & Industrial Engineering 59:4, pages 496-508.
Crossref
Biman Das, Alberto Garcia-Diaz, Corinne A. MacDonald & Kalyan K. Ghoshal. (2010) A computer simulation approach to evaluating bowl versus inverted bowl assembly line arrangement with variable operation times. The International Journal of Advanced Manufacturing Technology 51:1-4, pages 15-24.
Crossref
Biman Das, Jesus M. Sanchez‐Rivas, Alberto Garcia‐Diaz & Corinne A. MacDonald. (2010) A computer simulation approach to evaluating assembly line balancing with variable operation times. Journal of Manufacturing Technology Management 21:7, pages 872-887.
Crossref
A. Kokangul, T. Khaniyev & J. K. Cochran. (2009) Optimal control of work‐in‐process inventory of a two‐station production line. Optimal Control Applications and Methods 31:3, pages 201-211.
Crossref
J. MacGregor Smith, F.R.B. Cruz & T. van Woensel. (2010) Topological network design of general, finite, multi-server queueing networks. European Journal of Operational Research 201:2, pages 427-441.
Crossref
Guy L. Curry & Richard M. Feldman. 2009. Manufacturing Systems Modeling and Analysis. Manufacturing Systems Modeling and Analysis
281
320
.
F.R.B. Cruz, A.R. Duarte & T. van Woensel. (2008) Buffer allocation in general single-server queueing networks. Computers & Operations Research 35:11, pages 3581-3598.
Crossref
Nabil Nahas, Daoud Ait-Kadi & Mustapha Nourelfath. (2006) A new approach for buffer allocation in unreliable production lines. International Journal of Production Economics 103:2, pages 873-881.
Crossref
Emre Enginarlar, Jingshan Li & Semyon M. Meerkov. 2006. Stochastic Modeling of Manufacturing Systems. Stochastic Modeling of Manufacturing Systems
29
53
.
Simin Huang, Rajan Batta & Rakesh Nagi. (2005) Distribution network design: Selection and sizing of congested connections. Naval Research Logistics (NRL) 52:8, pages 701-712.
Crossref
M.I. Vidalis, C.T. Papadopoulos & C. Heavey. (2005) On the workload and ‘phaseload’ allocation problems of short reliable production lines with finite buffers. Computers & Industrial Engineering 48:4, pages 825-837.
Crossref
Hasan Kivanc Aksoy & Surendra M. Gupta. (2005) Buffer allocation plan for a remanufacturing cell. Computers & Industrial Engineering 48:3, pages 657-677.
Crossref
Jingshan Li & Semyon M. Meerkov. 2005. Analysis, Control and Optimization of Complex Dynamic Systems. Analysis, Control and Optimization of Complex Dynamic Systems
61
90
.
Man-Soo Han & Dong-Jo Park. (2002) Optimal buffer allocation of serial production lines with quality inspection machines. Computers & Industrial Engineering 42:1, pages 75-89.
Crossref
Ming-Guang Huang, Pao-Long Chang & Ying-Chyi Chou. (2002) Buffer allocation in flow-shop-type production systems with general arrival and service patterns. Computers & Operations Research 29:2, pages 103-121.
Crossref
H.T. Papadopoulos & M.I. Vidalis. (2001) A heuristic algorithm for the buffer allocation in unreliable unbalanced production lines. Computers & Industrial Engineering 41:3, pages 261-277.
Crossref
H.T. Papadopoulos & M.I. Vidalis. (2001) Minimizing WIP inventory in reliable production lines. International Journal of Production Economics 70:2, pages 185-197.
Crossref
Nureddin Kırkavak & Cemal Dinçer. (1999) The general behavior of pull production systems: The allocation problems. European Journal of Operational Research 119:2, pages 479-494.
Crossref
H.T. Papadopoulos & M.I. Vidalis. (1999) Optimal buffer allocation in short μ-balanced unreliable production lines. Computers & Industrial Engineering 37:4, pages 691-710.
Crossref
G.A. Vouros & H.T. Papadopoulos. (1998) Buffer allocation in unreliable production lines using a knowledge based system. Computers & Operations Research 25:12, pages 1055-1067.
Crossref
Erdal Erel. (1998) A study on production lines with discrete batch WIP inventory transfer. International Journal of Production Economics 55:1, pages 71-85.
Crossref
S.T. Enns. (1998) Work flow analysis using queuing decomposition models. Computers & Industrial Engineering 34:2, pages 371-383.
Crossref
Ajay Singh & J.MacGregor Smitth. (1997) Buffer allocation for an integer nonlinear network design problem. Computers & Operations Research 24:5, pages 453-472.
Crossref
Shimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen WarneckeShimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen Warnecke. 1997. Industrial Assembly. Industrial Assembly
259
311
.
Michael J. Magazine & Kathryn E. Stecke. (1996) Throughput for production lines with serial work stations and parallel service facilities. Performance Evaluation 25:3, pages 211-232.
Crossref
Abraham Mehrez & Michael Y. Hu. (1996) A statistical analysis to design and operate an unreliable transfer line with exogenous random unit demand. Computers & Industrial Engineering 30:2, pages 185-192.
Crossref
Frederick S. Hillier & Kut C. So. (1996) On the robustness of the bowl phenomenon. European Journal of Operational Research 89:3, pages 496-515.
Crossref
Frederick S. Hillier & Kut C. So. (1995) On the optimal design of tandem queueing systems with finite buffers. Queueing Systems 21:3-4, pages 245-266.
Crossref
Kenneth R. Baker & Stephen G. Powell. (1995) A predictive model for the throughput of simple assembly systems. European Journal of Operational Research 81:2, pages 336-345.
Crossref
Selcuk Karabati & Panagiotis Kouvelis. (1994) The interface of buffer design and cyclic scheduling decisions in deterministic flow lines. Annals of Operations Research 50:1, pages 295-317.
Crossref
Abraham Mehrez & B.Eddy Patuwo. (1994) Discrete unreliable transfer lines with exogenous random unit demand. Computers & Industrial Engineering 26:2, pages 307-320.
Crossref
Layek Abdel-Malek & Chi Tang. (1993) An integrated approach to the layout of flexible transfer lines (FTLs): Buffer stocks allocation. International Journal of Production Economics 30-31, pages 489-499.
Crossref
L. Joseph Thomas. 1993. Perspectives in Operations Management. Perspectives in Operations Management
229
247
.
Kut C. So & Ke-tsai E. Chin. (1992) Performance bounds on multiserver exponential tandem queues with finite buffers. European Journal of Operational Research 63:3, pages 463-477.
Crossref
John A. Buzacott & J. George Shanthikumar. (1992) Design of manufacturing systems using queueing models. Queueing Systems 12:1-2, pages 135-213.
Crossref
Kenneth R. Baker. (1992) Tightly-coupled production systems: Models, analysis, and insights. Journal of Manufacturing Systems 11:6, pages 385-400.
Crossref
Emre Enginarlar. (2003) Lean Buffering in Production Systems: A Quantitative Approach. SSRN Electronic Journal.
Crossref