677
Views
186
CrossRef citations to date
0
Altmetric
Original Articles

A survey on the resource-constrained project scheduling problem

&
Pages 574-586 | Received 01 Feb 1993, Accepted 01 Aug 1994, Published online: 13 Jul 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (16)

Carolin Kellenbrink, Nicolas Nübel, André Schnabel, Philipp Gilge, Joerg R. Seume, Berend Denkena & Stefan Helber. (2022) A regeneration process chain with an integrated decision support system for individual regeneration processes based on a virtual twin. International Journal of Production Research 60:13, pages 4137-4158.
Read now
Hashem Vahdani & Aida Shams. (2020) Multi-mode capital-constrained project payment scheduling model considering bonus-penalty structure. International Journal of Management Science and Engineering Management 15:1, pages 17-25.
Read now
Weiwei Chen, Lei Lei, Zhengwei Wang, Mingfei Teng & Junming Liu. (2018) Coordinating supplier selection and project scheduling in resource-constrained construction supply chains. International Journal of Production Research 56:19, pages 6512-6526.
Read now
J Zhou, P E D Love, X Wang, K L Teo & Z Irani. (2013) A review of methods and algorithms for optimizing construction scheduling. Journal of the Operational Research Society 64:8, pages 1091-1105.
Read now
Fehmi H'Mida & Pierre Lopez. (2013) Multi-site scheduling under production and transportation constraints. International Journal of Computer Integrated Manufacturing 26:3, pages 252-266.
Read now
Wei Wu, Junhu Wei, Xiaohong Guan & Leyuan Shi. (2012) A hybrid nested partitions algorithm for scheduling flexible resource in flow shop problem. International Journal of Production Research 50:10, pages 2555-2569.
Read now
B. Chandra Mohan & R. Baskaran. (2011) Survey on Recent Research and Implementation of Ant Colony Optimization in Various Engineering Applications. International Journal of Computational Intelligence Systems 4:4, pages 566-582.
Read now
Mario Vanhoucke. (2010) A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows. International Journal of Production Research 48:7, pages 1983-2001.
Read now
Neng-Hui Shih. (2006) ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS. Journal of the Chinese Institute of Industrial Engineers 23:6, pages 494-500.
Read now
NOUD GADEMANN & MARCO SCHUTTEN. (2005) Linear-programming-based heuristics for project capacity planning. IIE Transactions 37:2, pages 153-165.
Read now
LindaK. Nozick, MarkA. Turnquist, CraigR. Lawton, G. F. List, DeanA. Jones, StephenT. Wright & EdwinA. Kjeldgaard. (2002) Production planning for a project job shop, with application to disassembly, evaluation and maintenance of nuclear weapons. Production Planning & Control 13:2, pages 187-198.
Read now
Huan Neng Chiu & Deng Maw Tsai. (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics 20:1, pages 55-66.
Read now
B. DOD1N & A.A. ELIMAM. (2001) Integrated project scheduling and material planning with variable activity duration and rewards. IIE Transactions 33:11, pages 1005-1018.
Read now
ERIK DEMEULEMEESTER, BERTDE REYCK & WILLY HERROELEN. (2000) The discrete time/resource trade-off problem in project networks: a branch-and-bound approach. IIE Transactions 32:11, pages 1059-1069.
Read now
LINET ÖZDAMAR. (1998) On scheduling project activities with variable expenditure rates. IIE Transactions 30:8, pages 695-704.
Read now

Articles from other publishers (170)

Alfredo S. Ramos, Pablo A. Miranda-Gonzalez, Samuel Nucamendi-Guillén & Elias Olivares-Benitez. (2023) A Formulation for the Stochastic Multi-Mode Resource-Constrained Project Scheduling Problem Solved with a Multi-Start Iterated Local Search Metaheuristic. Mathematics 11:2, pages 337.
Crossref
Yi-Chen Su & Bertrand M.T. Lin. (2022) Minimizing the total weighted completion time in relocation scheduling. Computers & Industrial Engineering 173, pages 108662.
Crossref
Gizem Çakır, Kemal Subulan, Seyda Topaloglu Yildiz, Alper Hamzadayı & Ceren Asılkefeli. (2022) A comparative study of modeling and solution approaches for the multi-mode resource-constrained discrete time–cost trade-off problem: Case study of an ERP implementation project. Computers & Industrial Engineering 169, pages 108201.
Crossref
Sönke Hartmann & Dirk Briskorn. (2022) An updated survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research 297:1, pages 1-14.
Crossref
Alfredo S. Ramos, Elias Olivares‐Benitez & Pablo A. Miranda‐Gonzalez. (2021) Multi‐start iterated local search metaheuristic for the multi‐mode resource‐constrained project scheduling problem. Expert Systems 39:1.
Crossref
Önder Halis BETTEMİR & Derya ÇAKMAK. (2021) Tüm Arama Uzayını Tarayarak Küçük Ölçekli Kaynak Kısıtlı Proje Çizelgeleme Problemlerinin ÇözümüSolution of Resource Constrained Project Scheduling Problem by Scanning the Whole Search Domain. Aksaray University Journal of Science and Engineering 5:2, pages 92-112.
Crossref
Mario Vanhoucke & José Coelho. (2021) An analysis of network and resource indicators for resource-constrained project scheduling problem instances. Computers & Operations Research 132, pages 105260.
Crossref
Ömer ATLI & Serhat AYDIN. (2021) Çok Modlu Kaynak Kısıtlı Proje Çizelgeleme Problemlerinin Belirsizlik Ortamında Modellenmesi. Afyon Kocatepe University Journal of Sciences and Engineering 21:3, pages 586-605.
Crossref
Gündüz Ulusoy & Öncü HazırGündüz Ulusoy & Öncü Hazır. 2021. An Introduction to Project Modeling and Planning. An Introduction to Project Modeling and Planning 199 250 .
Gündüz Ulusoy & Öncü HazırGündüz Ulusoy & Öncü Hazır. 2021. An Introduction to Project Modeling and Planning. An Introduction to Project Modeling and Planning 1 21 .
Sameh Al‐Shihabi & Mohammad M. AlDurgam. (2020) The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights. International Transactions in Operational Research 27:6, pages 2841-2877.
Crossref
José Coelho & Mario Vanhoucke. (2020) Going to the core of hard resource-constrained project scheduling instances. Computers & Operations Research 121, pages 104976.
Crossref
Firoz Mahmud, Forhad Zaman, Ruhul Sarker & Daryl Essam. (2020) Heuristic Embedded Genetic Algorithm for Heterogeneous Project Scheduling Problems. Heuristic Embedded Genetic Algorithm for Heterogeneous Project Scheduling Problems.
Luise-Sophie Hoffmann, Carolin Kellenbrink & Stefan Helber. (2020) Simultaneous structuring and scheduling of multiple projects with flexible project structures. Journal of Business Economics 90:5-6, pages 679-711.
Crossref
Guler Ozturk & Adalet Oner. (2020) Continuous Time MILP Models for Multi-Mode Resource Constrained Project Scheduling Problems. Continuous Time MILP Models for Multi-Mode Resource Constrained Project Scheduling Problems.
Hui Yi Chiang & Bertrand M. T. Lin. (2020) A Decision Model for Human Resource Allocation in Project Management of Software Development. IEEE Access 8, pages 38073-38081.
Crossref
Pelin Akçay, Mustafa Doğa Çetin, Batu Ekmekçi, Beste Yıldız, Levent Kandiller & Damla Kızılay. 2020. Proceedings of the International Symposium for Production Research 2019. Proceedings of the International Symposium for Production Research 2019 760 774 .
HaoJie Chen, Guofu Ding, Jian Zhang & Shengfeng Qin. (2019) Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival. Computers & Industrial Engineering 137, pages 106060.
Crossref
R. Christopher L. Riley & Cesar Rego. (2018) Intensification, diversification, and learning via relaxation adaptive memory programming: a case study on resource constrained project scheduling. Journal of Heuristics 25:4-5, pages 793-807.
Crossref
Zihao Chu, Zhe Xu & Haitao Li. (2019) New heuristics for the RCPSP with multiple overlapping modes. Computers & Industrial Engineering 131, pages 146-156.
Crossref
Félix Villafáñez, David Poza, Adolfo López-Paredes, Javier Pajares & Ricardo del Olmo. (2018) A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP). Soft Computing 23:10, pages 3465-3479.
Crossref
Pelin Akyil Kurt & Baris Kececi. 2019. Advances in Manufacturing, Production Management and Process Control. Advances in Manufacturing, Production Management and Process Control 549 557 .
Sha Tao & Zhijie Sasha Dong. (2018) Multi-mode resource-constrained project scheduling problem with alternative project structures. Computers & Industrial Engineering 125, pages 333-347.
Crossref
André Schnabel, Carolin Kellenbrink & Stefan Helber. (2018) Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints. Business Research 11:2, pages 329-356.
Crossref
J. D. García-Nieves, J. L. Ponz-Tienda, A. Salcedo-Bernal & E. Pellicer. (2018) The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects. Computer-Aided Civil and Infrastructure Engineering 33:8, pages 655-671.
Crossref
Wen Song, Hui Xi, Donghun Kang & Jie Zhang. (2018) An agent-based simulation system for multi-project scheduling under uncertainty. Simulation Modelling Practice and Theory 86, pages 187-203.
Crossref
Miguel Ángel Vega-Velázquez, Abel García-Nájera & Humberto Cervantes. (2018) A survey on the Software Project Scheduling Problem. International Journal of Production Economics 202, pages 145-161.
Crossref
José Coelho & Mario Vanhoucke. (2018) An exact composite lower bound strategy for the resource-constrained project scheduling problem. Computers & Operations Research 93, pages 135-150.
Crossref
Mario Vanhoucke & José Coelho. (2018) A tool to test and validate algorithms for the resource-constrained project scheduling problem. Computers & Industrial Engineering 118, pages 251-265.
Crossref
Ewa Ratajczak-Ropel & Aleksander SkakovskiEwa Ratajczak-Ropel. 2018. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling 69 97 .
Ewa Ratajczak-Ropel & Aleksander SkakovskiEwa Ratajczak-Ropel. 2018. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling 33 67 .
Ewa Ratajczak-Ropel & Aleksander SkakovskiEwa Ratajczak-Ropel. 2018. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling. Population-Based Approaches to the Resource-Constrained and Discrete-Continuous Scheduling 25 32 .
Reza Zamani. (2017) An evolutionary implicit enumeration procedure for solving the resource-constrained project scheduling problem. International Transactions in Operational Research 24:6, pages 1525-1547.
Crossref
Maria Fleischer Fauske. (2017) Using a genetic algorithm to solve the troops-to-tasks problem in military operations planning. The Journal of Defense Modeling and Simulation: Applications, Methodology, Technology 14:4, pages 439-446.
Crossref
Abbas Shafikhani, Amir Abbas Najafi & Seyed Taghi Akhavan Niaki. (2017) Project scheduling and equipment planning with random breakdowns. RAIRO - Operations Research 51:4, pages 1189-1209.
Crossref
Sameh T. Al-Shihabi & Mohammad M. AlDurgam. (2017) A max-min ant system for the finance-based scheduling problem. Computers & Industrial Engineering 110, pages 264-276.
Crossref
Ch. Markou, G.K. Koulinas & A.P. Vavatsikos. (2017) Project resources scheduling and leveling using Multi-Attribute Decision Models: Models implementation and case study. Expert Systems with Applications 77, pages 160-169.
Crossref
Zhengwen He, Hua He, Renjing Liu & Nengmin Wang. (2017) Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap. Computers & Operations Research 78, pages 564-577.
Crossref
C. Ailie Fraser, Tovi Grossman & George Fitzmaurice. (2017) WeBuild. WeBuild.
Shahriar Asta, Daniel Karapetyan, Ahmed Kheiri, Ender Özcan & Andrew J. Parkes. (2016) Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem. Information Sciences 373, pages 476-498.
Crossref
F. Perez & T. Gomez. (2014) Multiobjective project portfolio selection with fuzzy constraints. Annals of Operations Research 245:1-2, pages 7-29.
Crossref
Aman Karamlou & Paolo Bocchini. (2016) Sequencing algorithm with multiple-input genetic operators: Application to disaster resilience. Engineering Structures 117, pages 591-602.
Crossref
Xin Xu, Yao Zhao & Ching-Yu Chen. (2012) Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects. Annals of Operations Research 241:1-2, pages 225-247.
Crossref
Jing Xiao, Zhou Wu, Xi-Xi Hong, Jian-Chao Tang & Yong Tang. (2016) Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP. European Journal of Operational Research 251:1, pages 22-35.
Crossref
Broos Maenhout & Mario Vanhoucke. (2015) An exact algorithm for an integrated project staffing problem with a homogeneous workforce. Journal of Scheduling 19:2, pages 107-133.
Crossref
Mario Vanhoucke & José Coelho. (2016) An approach using SAT solvers for the RCPSP with logical constraints. European Journal of Operational Research 249:2, pages 577-591.
Crossref
M. Salimi Rad, A. Jamili, R. Tavakkoli-Moghaddam & M. Paknahad. (2016) Resource Constraint Project Scheduling to meet Net Present Value and quality objectives of the program. Resource Constraint Project Scheduling to meet Net Present Value and quality objectives of the program.
Broderick Crawford, Ricardo Soto, Franklin Johnson, Sanjay Misra & Eduardo Olguín. 2016. Computational Science and Its Applications – ICCSA 2016. Computational Science and Its Applications – ICCSA 2016 40 49 .
Broderick Crawford, Ricardo Soto, Franklin Johnson, Carlos Valencia & Fernando Paredes. 2016. Artificial Intelligence Perspectives in Intelligent Systems. Artificial Intelligence Perspectives in Intelligent Systems 449 458 .
Bertrand M.T. Lin. (2015) Resource-constrained scheduling with optional recycling operations. Computers & Industrial Engineering 90, pages 39-45.
Crossref
Carolin Kellenbrink & Stefan Helber. (2015) Scheduling resource-constrained projects with a flexible project structure. European Journal of Operational Research 246:2, pages 379-391.
Crossref
Esra Koyuncu & Rızvan Erol. (2015) PSO based approach for scheduling NPD projects including overlapping process. Computers & Industrial Engineering 85, pages 316-327.
Crossref
Zhongbao Zhou, Yingwu Chen & Jian Xiong. (2015) Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations. Journal of Industrial and Management Optimization 12:2, pages 719-737.
Crossref
Zsolt T. Kosztyán. (2015) Exact algorithm for matrix-based project planning problems. Expert Systems with Applications 42:9, pages 4460-4473.
Crossref
Ferhan Çebi & İrem Otay. (2015) A fuzzy multi-objective model for solving project network problem with bonus and incremental penalty cost. Computers & Industrial Engineering 82, pages 143-150.
Crossref
Junzilan Cheng, John Fowler, Karl Kempf & Scott Mason. (2015) Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting. Computers & Operations Research 53, pages 275-287.
Crossref
Anurag Agarwal, Selcuk Colak & Selcuk Erenguc. 2015. Handbook on Project Management and Scheduling Vol.1. Handbook on Project Management and Scheduling Vol.1 57 74 .
Broderick Crawford, Ricardo Soto, Franklin Johnson, Eric Monfroy & Fernando Paredes. (2014) A Max–Min Ant System algorithm to solve the Software Project Scheduling Problem. Expert Systems with Applications 41:15, pages 6634-6645.
Crossref
Jian Xiong, Jing Liu, Yingwu Chen & Hussein A. Abbass. (2014) A Knowledge-Based Evolutionary Multiobjective Approach for Stochastic Extended Resource Investment Project Scheduling Problems. IEEE Transactions on Evolutionary Computation 18:5, pages 742-763.
Crossref
Fadi A. Zaraket, Majd Olleik & Ali A. Yassine. (2014) Skill-based framework for optimal software project selection and resource allocation. European Journal of Operational Research 234:1, pages 308-318.
Crossref
Zhengwen He, Nengmin Wang & Pengxiang Li. (2012) Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective. Annals of Operations Research 213:1, pages 203-220.
Crossref
Grzegorz Waligóra. (2011) Discrete-continuous project scheduling with discounted cash inflows and various payment models—a review of recent results. Annals of Operations Research 213:1, pages 319-340.
Crossref
Broderick Crawford, Ricardo Soto, Franklin Johnson, Sanjay Misra & Fernando Paredes. 2014. Computational Science and Its Applications – ICCSA 2014. Computational Science and Its Applications – ICCSA 2014 215 226 .
Broderick Crawford, Ricardo Soto, Franklin Johnson, Eric Monfroy & Fernando Paredes. 2014. Modern Trends and Techniques in Computer Science. Modern Trends and Techniques in Computer Science 41 51 .
Mónica A. Santos & Anabela P. Tereso. 2014. Essays in Production, Project Planning and Scheduling. Essays in Production, Project Planning and Scheduling 249 275 .
Mario Vanhoucke. (2013) An Overview of Recent Research Results and Future Research Avenues Using Simulation Studies in Project Management. ISRN Computational Mathematics 2013, pages 1-19.
Crossref
Haiwen Han, Qi Deyui, Weiping Zheng & Feng Bin. (2013) A Qos Guided Task Scheduling Model in Cloud Computing Environment. A Qos Guided Task Scheduling Model in Cloud Computing Environment.
Qiong Jia & Yoonho Seo. (2013) An improved particle swarm optimization for the resource-constrained project scheduling problem. The International Journal of Advanced Manufacturing Technology 67:9-12, pages 2627-2638.
Crossref
Umut Beşikci, Ümit Bilge & Gündüz Ulusoy. (2012) Resource dedication problem in a multi-project environment. Flexible Services and Manufacturing Journal 25:1-2, pages 206-229.
Crossref
Andreas Fink & Jörg Homberger. (2012) An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectives. Flexible Services and Manufacturing Journal 25:1-2, pages 94-121.
Crossref
Vincent Van Peteghem & Mario Vanhoucke. (2011) An artificial immune system algorithm for the resource availability cost problem. Flexible Services and Manufacturing Journal 25:1-2, pages 122-144.
Crossref
Reza Zamani. (2013) Integrating Iterative Crossover Capability in Orthogonal Neighborhoods for Scheduling Resource-Constrained Projects. Evolutionary Computation 21:2, pages 341-360.
Crossref
Wei-Neng Chen & Jun Zhang. (2013) Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler. IEEE Transactions on Software Engineering 39:1, pages 1-17.
Crossref
Mario VanhouckeMario Vanhoucke. 2013. Project Management with Dynamic Scheduling. Project Management with Dynamic Scheduling 109 139 .
Mario VanhouckeMario Vanhoucke. 2013. Project Management with Dynamic Scheduling. Project Management with Dynamic Scheduling 37 57 .
Broderick Crawford, Ricardo Soto, Franklin Johnson & Eric Monfroy. 2013. HCI International 2013 - Posters’ Extended Abstracts. HCI International 2013 - Posters’ Extended Abstracts 635 639 .
Willy S. Herroelen & Graham K. Rand. 2013. Encyclopedia of Operations Research and Management Science. Encyclopedia of Operations Research and Management Science 1032 1037 .
Junzilan Cheng, John Fowler & Karl Kempf. (2012) Simulation-based multi-mode resource-constrained project scheduling of semiconductor equipment installation and qualification. Simulation-based multi-mode resource-constrained project scheduling of semiconductor equipment installation and qualification.
Zhengwen He, Renjing Liu & Tao Jia. (2012) Metaheuristics for multi-mode capital-constrained project payment scheduling. European Journal of Operational Research 223:3, pages 605-613.
Crossref
Daria Terekhov, Mustafa K. Doğru, Ulaş Özen & J. Christopher Beck. (2012) Solving two-machine assembly scheduling problems with inventory constraints. Computers & Industrial Engineering 63:1, pages 120-134.
Crossref
Jian Xiong, Ke-wei Yang, Jing Liu, Qing-song Zhao & Ying-wu Chen. (2012) A two-stage preference-based evolutionary multi-objective approach for capability planning problems. Knowledge-Based Systems 31, pages 128-139.
Crossref
Jian Xiong, Kamran Shafi & Hussein A. Abbass. (2012) Multi-Uncertainty Problems (MUP) with applications to managing risk in resource-constrained project scheduling. Multi-Uncertainty Problems (MUP) with applications to managing risk in resource-constrained project scheduling.
Fei Chen, Kosuke Sekiyama & Toshio Fukuda. (2012) A genetic algorithm for subtask allocation within human and robot coordinated assembly. A genetic algorithm for subtask allocation within human and robot coordinated assembly.
Mario Vanhoucke. (2012) Measuring the efficiency of project control using fictitious and empirical project data. International Journal of Project Management 30:2, pages 252-263.
Crossref
Jens Czogalla & Andreas Fink. 2012. Hybrid Algorithms for Service, Computing and Manufacturing Systems. Hybrid Algorithms for Service, Computing and Manufacturing Systems 137 157 .
Mariem Trojet, Fehmi H’Mida & Pierre Lopez. (2011) Project scheduling under resource constraints: Application of the cumulative global constraint in a decision support framework. Computers & Industrial Engineering 61:2, pages 357-363.
Crossref
José Coelho & Mario Vanhoucke. (2011) Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. European Journal of Operational Research 213:1, pages 73-82.
Crossref
Narongrit Wongwai & Suphawut Malaikrisanachalee. (2011) Augmented heuristic algorithm for multi-skilled resource scheduling. Automation in Construction 20:4, pages 429-445.
Crossref
Reza Zamani. (2009) A hybrid decomposition procedure for scheduling projects under multiple resource constraints. Operational Research 11:1, pages 93-111.
Crossref
Shanshan Wu, Hung-Da Wan, Sanjay Kumar Shukla & Beizhi Li. (2011) Chaos-based improved immune algorithm (CBIIA) for resource-constrained project scheduling problems. Expert Systems with Applications 38:4, pages 3387-3395.
Crossref
Mahdi Mobini, Zahra Mobini & Masoud Rabbani. (2011) An Artificial Immune Algorithm for the project scheduling problem under resource constraints. Applied Soft Computing 11:2, pages 1975-1982.
Crossref
Jan Węglarz, Joanna Józefowska, Marek Mika & Grzegorz Waligóra. (2011) Project scheduling with finite or infinite number of activity processing modes – A survey. European Journal of Operational Research 208:3, pages 177-205.
Crossref
Francisco Ballestín & Rosa Blanco. (2011) Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems. Computers & Operations Research 38:1, pages 51-62.
Crossref
Anurag Agarwal, Selcuk Colak & Selcuk Erenguc. (2011) A Neurogenetic approach for the resource-constrained project scheduling problem. Computers & Operations Research 38:1, pages 44-50.
Crossref
Mónica A. Santos & Anabela P. Tereso. 2011. Soft Computing in Industrial Applications. Soft Computing in Industrial Applications 239 248 .
Sönke Hartmann & Dirk Briskorn. (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. European Journal of Operational Research 207:1, pages 1-14.
Crossref
Siqian Shen, J. Cole Smith & Shabbir Ahmed. (2010) Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths. Management Science 56:10, pages 1794-1814.
Crossref
Reza Zamani. (2010) A parallel complete anytime procedure for project scheduling under multiple resource constraints. The International Journal of Advanced Manufacturing Technology 50:1-4, pages 353-362.
Crossref
Zohar Laslo. (2010) Project portfolio management: An integrated method for resource planning and scheduling to minimize planning/scheduling-dependent expenses. International Journal of Project Management 28:6, pages 609-618.
Crossref
Tyson R. Browning & Ali A. Yassine. (2010) Resource-constrained multi-project scheduling: Priority rule performance revisited. International Journal of Production Economics 126:2, pages 212-228.
Crossref
Wei-Neng Chen, Jun Zhang, H.S.-H. Chung, Rui-Zhang Huang & Ou Liu. (2010) Optimizing Discounted Cash Flows in Project Scheduling—An Ant Colony Optimization Approach. IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 40:1, pages 64-77.
Crossref
Sanjay Srivastava, Bhupendra Pathak & Kamal Srivastava. 2010. Computational Intelligence in Optimization. Computational Intelligence in Optimization 325 357 .
Amiruddin Ismail, Khalim A. Rashid & Wisam J. Hilo. (2009) The Use of Project Management Software in Construction Industry. Journal of Applied Sciences 9:10, pages 1985-1989.
Crossref
Qi Hao, Yunjiao Xue, Shuying Wang & Weiming Shen. (2009) A dynamic scheduling algorithm for time- and resource-constrained task networks. A dynamic scheduling algorithm for time- and resource-constrained task networks.
Mariem Trojet, Fehmi H'Mida & Pierre Lopez. (2009) Project scheduling under resource constraints: Application of the cumulative global constraint. Project scheduling under resource constraints: Application of the cumulative global constraint.
Jan Weglarz, Marek Mika & Grzegorz Waligóra. (2009) Project scheduling problem with multiple modes, multisite renewable resources and transportation network. IFAC Proceedings Volumes 42:13, pages 224-227.
Crossref
Ningxiong Xu, Sally A. McKee, Linda K. Nozick & Ruke Ufomata. (2008) Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem. Computers & Operations Research 35:10, pages 3284-3297.
Crossref
Zhengwen He & Yu Xu. (2008) Multi-mode project payment scheduling problems with bonus–penalty structure. European Journal of Operational Research 189:3, pages 1191-1207.
Crossref
Grzegorz Waligóra. (2008) Discrete–continuous project scheduling with discounted cash flows—A tabu search approach. Computers & Operations Research 35:7, pages 2141-2153.
Crossref
Hanif D. Sherali, Dirk Van Goubergen & Hendrik Van Landeghem. (2008) A quantitative approach for scheduling activities to reduce set-up in multiple machine lines. European Journal of Operational Research 187:3, pages 1224-1237.
Crossref
Mario Vanhoucke. (2008) Setup times and fast tracking in resource-constrained project scheduling. Computers & Industrial Engineering 54:4, pages 1062-1070.
Crossref
Murat Kılıç, Gündüz Ulusoy & Funda Sivrikaya Şerifoğlu. (2008) A bi-objective genetic algorithm approach to risk mitigation in project scheduling. International Journal of Production Economics 112:1, pages 202-216.
Crossref
B. Dodin & A.A. Elimam. (2008) Integration of equipment planning and project scheduling. European Journal of Operational Research 184:3, pages 962-980.
Crossref
Mario Vanhoucke & Dieter Debels. (2008) The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects. Computers & Industrial Engineering 54:1, pages 140-154.
Crossref
. 2008. Network Models and Optimization. Network Models and Optimization 419 476 .
Arif Volkan Vural & Burak Eksioglu. 2009. Encyclopedia of Optimization. Encyclopedia of Optimization 3704 3708 .
Jean‐Charles Billaut, Jacques Carlier, Emmanuel Néron & Antoine Oliver. 2008. Production Scheduling. Production Scheduling 233 269 .
Kabeh Vaziri, Paul Carr & Linda Nozick. (2007) Program planning under uncertainty. Program planning under uncertainty.
Ningxiong Xu, Linda Nozick, Orr Bernstein & Dean Jones. (2007) Stochastic rollout and justification to solve the resource-constrained project scheduling problem. Stochastic rollout and justification to solve the resource-constrained project scheduling problem.
Rina Agarwal, M. K. Tiwari & S. K. Mukherjee. (2006) Artificial immune system based approach for solving resource constraint project scheduling problem. The International Journal of Advanced Manufacturing Technology 34:5-6, pages 584-593.
Crossref
Dieter Debels & Mario Vanhoucke. (2007) A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem. Operations Research 55:3, pages 457-469.
Crossref
Igor Pesek, Andrea Schaerf & Janez Žerovnik. 2007. Hybrid Metaheuristics. Hybrid Metaheuristics 57 68 .
E. William East & Liang Y. Liu. (2006) Multiproject Planning and Resource Controls for Facility Management. Journal of Construction Engineering and Management 132:12, pages 1294-1305.
Crossref
Rainer Kolisch & Sönke Hartmann. (2006) Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174:1, pages 23-37.
Crossref
Guidong Zhu, Jonathan F. Bard & Gang Yu. (2006) A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem. INFORMS Journal on Computing 18:3, pages 377-390.
Crossref
Dieter Debels, Bert De Reyck, Roel Leus & Mario Vanhoucke. (2006) A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. European Journal of Operational Research 169:2, pages 638-653.
Crossref
Xinggang Luo, Dingwei Wang, Jiafu Tang & Yiliu Tu. (2006) An Improved PSO Algorithm for Resource-Constrained Project Scheduling Problem. An Improved PSO Algorithm for Resource-Constrained Project Scheduling Problem.
. 2006. Complex Scheduling. Complex Scheduling 1 22 .
Willy Herroelen. (2009) Project Scheduling-Theory and Practice. Production and Operations Management 14:4, pages 413-432.
Crossref
Genmou Jiang & Jonathan Shi. (2005) Exact Algorithm for Solving Project Scheduling Problems under Multiple Resource Constraints. Journal of Construction Engineering and Management 131:9, pages 986-992.
Crossref
Marek Mika, Grzegorz Waligóra & Jan Węglarz. (2005) Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. European Journal of Operational Research 164:3, pages 639-668.
Crossref
Mario VanhouckeAnn VereeckePaul Gemmel. (2005) The Project Scheduling Game (PSG): Simulating Time/Cost Trade-Offs in Projects. Project Management Journal 36:1, pages 51-59.
Crossref
Juite Wang. (2005) Constraint-based schedule repair for product development projects with time-limited constraints. International Journal of Production Economics 95:3, pages 399-414.
Crossref
Kevin Gormley, James C. Fishenden & William T. Scherer. (2004) 7.3.2 Optimization of Research and Development Investment Strategies. INCOSE International Symposium 14:1, pages 1481-1493.
Crossref
Richard L. DanielsJoseph B. MazzolaDailun Shi. (2004) Flow Shop Scheduling with Partial Resource Flexibility. Management Science 50:5, pages 658-669.
Crossref
Juite Wang. (2004) A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research 152:1, pages 180-194.
Crossref
Rafik Aziz Aliev, Bijan Fazlollahi & Rashad Rafik AlievRafik Aziz Aliev, Bijan Fazlollahi & Rashad Rafik Aliev. 2004. Soft Computing and its Applications in Business and Economics. Soft Computing and its Applications in Business and Economics 351 402 .
Sönke Hartmann. (2002) A self‐adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics (NRL) 49:5, pages 433-448.
Crossref
Juite Wang. (2002) A fuzzy project scheduling approach to minimize schedule risk for product development. Fuzzy Sets and Systems 127:2, pages 99-116.
Crossref
G.E. Whitehouse, G.W. Depuy & R.J. Moraga. (2002) Meta-RaPS approach for solving the resource allocation problem. Meta-RaPS approach for solving the resource allocation problem.
Joaquín Bautista & Jordi Pereira. 2002. Topics in Artificial Intelligence. Topics in Artificial Intelligence 257 268 .
Gary E. Whitehouse & Gail W. DePuy. (2001) Solving Constrained Multiple Resource Networks Both Forward and Backward Using Brooks Algorithm. Project Management Journal 32:4, pages 24-31.
Crossref
M.Reza Zamani. (2001) A high-performance exact method for the resource-constrained project scheduling problem. Computers & Operations Research 28:14, pages 1387-1401.
Crossref
Mario Vanhoucke, Erik Demeulemeester & Willy Herroelen. (2001) On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints. Management Science 47:8, pages 1113-1121.
Crossref
R Kolisch & R Padman. (2001) An integrated survey of deterministic project scheduling. Omega 29:3, pages 249-272.
Crossref
Matthew J. LiberatoreBruce Pollack-JohnsonColleen A. Smith. (2001) Project Management in Construction: Software Use and Research Directions. Journal of Construction Engineering and Management 127:2, pages 101-107.
Crossref
M. Shackelford & D. Corne. (2001) Collaborative evolutionary multi-project resource scheduling. Collaborative evolutionary multi-project resource scheduling.
Gündüz Ulusoy & Serkan Cebelli. (2000) An equitable approach to the payment scheduling problem in project management. European Journal of Operational Research 127:2, pages 262-278.
Crossref
Antonio Lova, Concepción Maroto & Pilar Tormos. (2000) A multicriteria heuristic method to improve resource allocation in multiproject scheduling. European Journal of Operational Research 127:2, pages 408-424.
Crossref
Sönke Hartmann & Rainer Kolisch. (2000) Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 127:2, pages 394-407.
Crossref
G.W DePuy & G.E Whitehouse. (2000) Applying the COMSOAL computer heuristic to the constrained resource allocation problem. Computers & Industrial Engineering 38:3, pages 413-422.
Crossref
Jonathan Jingshen Shi & Zhongming Deng. (2000) Object-oriented resource-based planning method (ORPM) for construction. International Journal of Project Management 18:3, pages 179-188.
Crossref
Ana Viana & Jorge Pinho de Sousa. (2000) Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research 120:2, pages 359-374.
Crossref
Konstantin Kogan & Avraham Shtub. (1999) Scheduling projects with variable-intensity activities: The case of dynamic earliness and tardiness costs. European Journal of Operational Research 118:1, pages 65-80.
Crossref
Rainer Kolisch. (1999) Resource Allocation Capabilities of Commercial Project Management Software Packages. Interfaces 29:4, pages 19-31.
Crossref
J. Bautista, A. Lusa, R. Suarez, M. Mateo, R. Pastor & A. Corominas. (1999) Application of genetic algorithms to assembly sequence planning with limited resources. Application of genetic algorithms to assembly sequence planning with limited resources.
Peter Brucker, Andreas Drexl, Rolf Möhring, Klaus Neumann & Erwin Pesch. (1999) Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research 112:1, pages 3-41.
Crossref
Terence Nazareth, Sanjay Verma, Subir Bhattacharya & Amitava Bagchi. (1999) The multiple resource constrained project scheduling problem: A breadth-first approach. European Journal of Operational Research 112:2, pages 347-366.
Crossref
Willy Herroelen, Erik Demeulemeester & Bert De Reyck. 1999. Project Scheduling. Project Scheduling 1 26 .
Linet Özdamar, Gündüz Ulusoy & Mete Bayyigit. (1998) A heuristic treatment of tardiness and net present value criteria in resource constrained project scheduling. International Journal of Physical Distribution & Logistics Management 28:9/10, pages 805-824.
Crossref
Kum-Khiong Yang. (1998) A comparison of dispatching rules for executing a resource-constrained project with estimated activity durations. Omega 26:6, pages 729-738.
Crossref
Ying-Wei Tsai & Douglas D. Gemmill. (1998) Using tabu search to schedule activities of stochastic resource-constrained projects. European Journal of Operational Research 111:1, pages 129-141.
Crossref
Pascal Richard. (1998) Scheduling Timed Marked Graphs with Resources: A Serial Method. IFAC Proceedings Volumes 31:15, pages 439-444.
Crossref
Willy Herroelen, Bert De Reyck & Erik Demeulemeester. (1998) Resource-constrained project scheduling: A survey of recent developments. Computers & Operations Research 25:4, pages 279-302.
Crossref
A. Ikonomou, J. E. Galletly & R. C. Daniel. 1998. Intelligent Systems for Manufacturing. Intelligent Systems for Manufacturing 311 322 .
Linet Özdamar & Hakan Dündar. (1997) A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows. Computers & Operations Research 24:12, pages 1187-1200.
Crossref
Willy S. Herroelen, Patrick Van Dommelen & Erik L. Demeulemeester. (1997) Project network models with discounted cash flows a guided tour through recent developments. European Journal of Operational Research 100:1, pages 97-121.
Crossref
Linet Özdamar & Gündüz Ulusoy. (1996) An iterative local constraints based analysis for solving the resource constrained project scheduling problem. Journal of Operations Management 14:3, pages 193-208.
Crossref
Gündüz Ulusoy & Linet Özdamar. (1996) A framework for an interactive project scheduling system under limited resources. European Journal of Operational Research 90:2, pages 362-375.
Crossref
Helmut E. Mausser & Stephen R. Lawrence. 1996. Meta-Heuristics. Meta-Heuristics 203 217 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.