54
Views
42
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Heuristics for minimizing tool switches when scheduling part types on a flexible machine

, , &
Pages 689-694 | Published online: 30 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (18)

Kaveh Amouzgar, Amir Nourmohammadi & Amos H.C. Ng. (2021) Multi-objective optimisation of tool indexing problem: a mathematical model and a modified genetic algorithm. International Journal of Production Research 59:12, pages 3572-3590.
Read now
Tiago Tiburcio da Silva, Antônio Augusto Chaves & Horacio Hideki Yanasse. (2021) A new multicommodity flow model for the job sequencing and tool switching problem. International Journal of Production Research 59:12, pages 3617-3632.
Read now
Timothy Sprock, Conrad Bock & Leon F. McGinnis. (2019) Survey and classification of operational control problems in discrete event logistics systems (DELS). International Journal of Production Research 57:15-16, pages 5215-5238.
Read now
Dorothea Calmels. (2019) The job sequencing and tool switching problem: state-of-the-art literature review, classification, and trends. International Journal of Production Research 57:15-16, pages 5005-5025.
Read now
Adil Baykasoğlu & Fehmi Burcin Ozsoydan. (2018) Minimisation of non-machining times in operating automatic tool changers of machine tools under dynamic operating conditions. International Journal of Production Research 56:4, pages 1548-1564.
Read now
Adil Baykasoğlu & Fehmi Burcin Ozsoydan. (2016) An improved approach for determination of index positions on CNC magazines with cutting tool duplications by integrating shortest path algorithm. International Journal of Production Research 54:3, pages 742-760.
Read now
Jhon Edgar Amaya, Carlos Cotta & AntonioJ. Fernández-Leiva. (2013) Cross entropy-based memetic algorithms: An application study over the tool switching problem. International Journal of Computational Intelligence Systems 6:3, pages 559-584.
Read now
Jannes Slomp & Kathryn E. Stecke. (2012) Changes in production control required for untended operation of a flexible manufacturing cell. Production Planning & Control 23:9, pages 674-693.
Read now
M. Bachlaus, M. K. Tiwari & R. Shankar. (2008) Sequencing of parts on single-stage multifunctional machining systems using a chaos-embedded simulated annealing algorithm. International Journal of Production Research 46:12, pages 3387-3413.
Read now
Fatma KilinÇ Karzan & Meral Azizoğlu. (2008) The tool transporter movements problem in flexible manufacturing systems. International Journal of Production Research 46:11, pages 3059-3084.
Read now
Paolo Detti, Carlo Meloni & Marco Pranzo. (2007) Minimizing and balancing setups in a serial production system. International Journal of Production Research 45:24, pages 5769-5788.
Read now
M. Hirvikorpi, O. S. Nevalainen & T. Knuutila. (2006) Job ordering and management of wearing tools. Engineering Optimization 38:2, pages 227-244.
Read now
M. Hirvikorpi, T. Knuutila, M. Johnsson & O. S. Nevalainen. (2005) A general approach to grouping of PCB assembly jobs. International Journal of Computer Integrated Manufacturing 18:8, pages 710-720.
Read now
Adil Baykasoglu & Türkay Dereli. (2004) Heuristic optimization system for the determination of index positions on CNC magazines with the consideration of cutting tool duplications. International Journal of Production Research 42:7, pages 1281-1303.
Read now
GILBERT LAPORTE, JUAN JOSÉ SALAZAR-GONZÁLEZ & FRÉDÉRIC SEMET. (2004) Exact algorithms for the job sequencing and tool switching problem. IIE Transactions 36:1, pages 37-45.
Read now
Chang-Yong Song & Hark Hwang. (2002) Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter. International Journal of Production Research 40:4, pages 873-883.
Read now

Articles from other publishers (24)

Quang-Vinh Dang, Koen Herps, Tugce Martagan, Ivo Adan & Jasper Heinrich. (2023) Unsupervised parallel machines scheduling with tool switches. Computers & Operations Research 160, pages 106361.
Crossref
Quang-Vinh Dang, Thijs van Diessen, Tugce Martagan & Ivo Adan. (2021) A matheuristic for parallel machine scheduling with tool replacements. European Journal of Operational Research 291:2, pages 640-660.
Crossref
Jordana Mecler, Anand Subramanian & Thibaut Vidal. (2021) A simple and effective hybrid genetic search for the job sequencing and tool switching problem. Computers & Operations Research 127, pages 105153.
Crossref
Ehsan Ahmadi, Boris Goldengorin, Gürsel A. Süer & Hadi Mosadegh. (2018) A hybrid method of 2-TSP and novel learning-based GA for job sequencing and tool switching problem. Applied Soft Computing 65, pages 214-229.
Crossref
Gustavo Silva Paiva & Marco Antonio M. Carvalho. (2017) Improved heuristic algorithms for the Job Sequencing and Tool Switching Problem. Computers & Operations Research 88, pages 208-219.
Crossref
Stefan Schwerdfeger & Nils Boysen. (2017) Order picking along a crane-supplied pick face: The SKU switching problem. European Journal of Operational Research 260:2, pages 534-545.
Crossref
Martina Furrer & Torsten Mütze. (2017) An algorithmic framework for tool switching problems with multiple objectives. European Journal of Operational Research 259:3, pages 1003-1016.
Crossref
A.A. Chaves, L.A.N. Lorena, E.L.F. Senne & M.G.C. Resende. (2016) Hybrid method with CS and BRKGA applied to the minimization of tool switches problem. Computers & Operations Research 67, pages 174-183.
Crossref
A. Costa, F.A. Cappadonna & S. Fichera. (2016) Minimizing the total completion time on a parallel machine system with tool changes. Computers & Industrial Engineering 91, pages 290-301.
Crossref
Daniele Catanzaro, Luis Gouveia & Martine Labbé. (2015) Improved integer linear programming formulations for the job Sequencing and tool Switching Problem. European Journal of Operational Research 244:3, pages 766-777.
Crossref
Csaba Raduly-Baka & Olli S. Nevalainen. (2015) The modular tool switching problem. European Journal of Operational Research 242:1, pages 100-106.
Crossref
Jhon Edgar Amaya, Carlos Cotta & Antonio J. Fernández-Leiva. (2011) Solving the tool switching problem with memetic algorithms. Artificial Intelligence for Engineering Design, Analysis and Manufacturing 26:2, pages 221-235.
Crossref
Antônio Augusto Chaves, Edson Luiz França Senne & Horacio Hideki Yanasse. (2012) Uma nova heurística para o problema de minimização de trocas de ferramentas. Gestão & Produção 19:1, pages 17-30.
Crossref
Gianpaolo Ghiani, Antonio Grieco & Emanuela Guerriero. (2010) Solving the Job Sequencing and Tool Switching Problem as a nonlinear least cost Hamiltonian cycle problem. Networks 55:4, pages 379-385.
Crossref
Horacio Hideki Yanasse, Rita de Cássia Meneses Rodrigues & Edson Luiz França Senne. (2009) Um algoritmo enumerativo baseado em ordenamento parcial para resolução do problema de minimização de trocas de ferramentas. Gestão & Produção 16:3, pages 370-381.
Crossref
Kanchan Das, M.F. Baki & Xiangyong Li. (2009) Optimization of operation and changeover time for production planning and scheduling in a flexible manufacturing system. Computers & Industrial Engineering 56:1, pages 283-293.
Crossref
Abdullah Konak, Sadan Kulturel-Konak & Meral Azizoğlu. (2008) Minimizing the number of tool switching instants in Flexible Manufacturing Systems. International Journal of Production Economics 116:2, pages 298-307.
Crossref
G. Ghiani, A. Grieco & E. Guerriero. (2007) An exact solution to the TLP problem in an NC machine. Robotics and Computer-Integrated Manufacturing 23:6, pages 645-649.
Crossref
M. Selim Akturk, Jay B. Ghosh & Rabia K. Kayan. (2007) Scheduling with tool changes to minimize total completion time under controllable machining conditions. Computers & Operations Research 34:7, pages 2130-2146.
Crossref
K. Salonen, J. Smed, M. Johnsson & O. Nevalainen. (2006) Grouping and sequencing PCB assembly jobs with minimum feeder setups. Robotics and Computer-Integrated Manufacturing 22:4, pages 297-305.
Crossref
Kari Salonen, Csaba Raduly-Baka & Olli S. Nevalainen. (2006) A note on the tool switching problem of a flexible machine. Computers & Industrial Engineering 50:4, pages 458-465.
Crossref
K.H. Ecker & J.N.D. Gupta. (2005) Scheduling tasks on a flexible manufacturing machine to minimize tool change delays. European Journal of Operational Research 164:3, pages 627-638.
Crossref
S Rahimifard & S.T Newman. (2000) Machine loading algorithms for the elimination of tardy jobs in flexible batch machining applications. Journal of Materials Processing Technology 107:1-3, pages 450-458.
Crossref
Barouch Matzliach & Michal Tzur. (2000) Storage management of items in two levels of availability. European Journal of Operational Research 121:2, pages 363-379.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.