191
Views
34
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness

, &
Pages 113-124 | Received 01 Apr 1997, Accepted 01 Jul 1998, Published online: 27 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Bruno de Athayde Prata & Marcelo Seido Nagano. (2023) A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization 55:12, pages 2070-2083.
Read now
Wei Sun, Yang Yu, Qi Lou, Junwei Wang & Yuechao Guan. (2020) Reducing the total tardiness by Seru production: model, exact and cooperative coevolution solutions. International Journal of Production Research 58:21, pages 6441-6452.
Read now
M. Karimi-Nasab & S.M.T. Fatemi Ghomi. (2012) Multi-objective production scheduling with controllable processing times and sequence-dependent setups for deteriorating items. International Journal of Production Research 50:24, pages 7378-7400.
Read now
Arash Motaghedi-Larijani, Hamid Reza Haddad, Kamyar Sabri Laghaie & Reza Tavakkoli-Moghaddam. (2011) A new single machine scheduling problem with setup time, job deterioration and maintenance costs. International Journal of Management Science and Engineering Management 6:4, pages 284-291.
Read now
Xiaoyan Zhu & WilbertE. Wilhelm. (2006) Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions 38:11, pages 987-1007.
Read now

Articles from other publishers (29)

Arnd Huchzermeier & Tobias Mönch. (2022) Mixed‐model assembly lines with variable takt and open stations. Production and Operations Management 32:3, pages 704-722.
Crossref
Patrick C. Deenen, Rick A.M. Adriaensen & John W. Fowler. (2022) Building a Digital Twin of the Photolithography Area of A Real-World Wafer FAB To Validate Improved Production Control. Building a Digital Twin of the Photolithography Area of A Real-World Wafer FAB To Validate Improved Production Control.
Chia-Nan Wang, Hsien-Pin Hsu, Hsin-Pin Fu, Nguyen Ky Phuc Phan & Van Thanh Nguyen. (2022) Scheduling Flexible Flow Shop in Labeling Companies to Minimize the Makespan. Computer Systems Science and Engineering 40:1, pages 17-36.
Crossref
Fatima Abderrabi, Matthieu Godichaud, Alice Yalaoui, Farouk Yalaoui, Lionel Amodeo, Ardian Qerimi & Eric Thivet. (2021) Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Time and Job Splitting: Hospital Catering Case Study. Applied Sciences 11:4, pages 1504.
Crossref
Thiago Henrique Nogueira, Carlos Roberto Venâncio de Carvalho, Martín Gómez Ravetti & Maurício Cardoso de Souza. (2019) ANALYSIS OF MIXED INTEGER PROGRAMMING FORMULATIONS FOR SINGLE MACHINE SCHEDULING PROBLEMS WITH SEQUENCE DEPENDENT SETUP TIMES AND RELEASE DATES. Pesquisa Operacional 39:1, pages 109-154.
Crossref
Armin Cheraghalipour, Mostafa Hajiaghaei-Keshteli & Mohammad Mahdi Paydar. (2018) Tree Growth Algorithm (TGA): A novel approach for solving optimization problems. Engineering Applications of Artificial Intelligence 72, pages 393-414.
Crossref
Jeffrey Schaller & Jorge M.S. Valente. (2018) Efficient heuristics for minimizing weighted sum of squared tardiness on identical parallel machines. Computers & Industrial Engineering 119, pages 146-156.
Crossref
Omid Shahvari & Rasaratnam Logendran. (2017) An Enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes. Computers & Operations Research 77, pages 154-176.
Crossref
M. Fatih Tasgetiren, Quan-Ke Pan, Yucel Ozturkoglu & Angela H. L Chen. (2016) A memetic algorithm with a variable block insertion heuristic for single machine total weighted tardiness problem with sequence dependent setup times. A memetic algorithm with a variable block insertion heuristic for single machine total weighted tardiness problem with sequence dependent setup times.
Tomás C. Gonçalves, Jorge M.S. Valente & Jeffrey E. Schaller. (2016) Metaheuristics for the single machine weighted quadratic tardiness scheduling problem. Computers & Operations Research 70, pages 115-126.
Crossref
Mir Abbas Bozorgirad & Rasaratnam Logendran. (2013) Bi-criteria group scheduling in hybrid flowshops. International Journal of Production Economics 145:2, pages 599-612.
Crossref
ChangJun Wang, DaYang Lei & YongJi Jia. (2012) Parallel machines scheduling in the presence of heterogeneous selfish customers. Parallel machines scheduling in the presence of heterogeneous selfish customers.
Jorge M.S. Valente & Jeffrey E. Schaller. (2012) Dispatching heuristics for the single machine weighted quadratic tardiness scheduling problem. Computers & Operations Research 39:9, pages 2223-2231.
Crossref
Chien-Wen Chao & Ching-Jong Liao. (2012) A discrete electromagnetism-like mechanism for single machine total weighted tardiness problem with sequence-dependent setup times. Applied Soft Computing 12:9, pages 3079-3087.
Crossref
Jeffrey Schaller & Jorge M.S. Valente. (2012) Minimizing the weighted sum of squared tardiness on a single machine. Computers & Operations Research 39:5, pages 919-928.
Crossref
P. Farahani, M. Grunow & H. O. Gunther. (2009) A heuristic approach for short-term operations planning in a catering company. A heuristic approach for short-term operations planning in a catering company.
Jorge M.S. Valente & José Fernando Gonçalves. (2009) A genetic algorithm approach for the single machine scheduling problem with linear earliness and quadratic tardiness penalties. Computers & Operations Research 36:10, pages 2707-2715.
Crossref
M. Fatih Tasgetiren, Quan-Ke Pan & Yun-Chia Liang. (2009) A discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup times. Computers & Operations Research 36:6, pages 1900-1915.
Crossref
Hong Zhou, Waiman Cheung & Lawrence C. Leung. (2009) Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm. European Journal of Operational Research 194:3, pages 637-649.
Crossref
Lawrence C. Leung, Yer Van Hui, Yong Wang & Gang Chen. (2009) A 0–1 LP Model for the Integration and Consolidation of Air Cargo Shipments. Operations Research 57:2, pages 402-412.
Crossref
Fatih Tasgetiren, Quan-Ke Pan & Yun-Chia Liang. (2008) A discrete differential evolution algorithm for single machine total weighted tardiness problem with sequence dependent setup times. A discrete differential evolution algorithm for single machine total weighted tardiness problem with sequence dependent setup times.
Ali Allahverdi, C.T. Ng, T.C.E. Cheng & Mikhail Y. Kovalyov. (2008) A survey of scheduling problems with setup times or costs. European Journal of Operational Research 187:3, pages 985-1032.
Crossref
Xiaochuan Luo & Chengbin Chu. (2007) A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness. European Journal of Operational Research 180:1, pages 68-81.
Crossref
Xiaochuan Luo & Feng Chu. (2006) A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness. Applied Mathematics and Computation 183:1, pages 575-588.
Crossref
A.I. Sivakumar & A.M. Gupta. (2006) Online Multiobjective Pareto Optimal Dynamic Scheduling of Semiconductor Back-End Using Conjunctive Simulated Scheduling. IEEE Transactions on Electronics Packaging Manufacturing 29:2, pages 99-109.
Crossref
Amit Kumar Gupta & Appa Iyer Sivakumar. (2004) Job shop scheduling techniques in semiconductor manufacturing. The International Journal of Advanced Manufacturing Technology 27:11-12, pages 1163-1169.
Crossref
T.C.Edwin Cheng & Natalia V. Shakhlevich. (2005) Minimizing non-decreasing separable objective functions for the unit-time open shop scheduling problem. European Journal of Operational Research 165:2, pages 444-456.
Crossref
Changjun Wang & Yugeng Xi. (2005) NONCOOPERATIVE GAME ON SCHEDULING: THE SINGLE MACHINE CASE. IFAC Proceedings Volumes 38:1, pages 201-205.
Crossref
Roberto Spina, Luigi M Galantucci & Michele Dassisti. (2003) A hybrid approach to the single line scheduling problem with multiple products and sequence-dependent time. Computers & Industrial Engineering 45:4, pages 573-583.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.