G. Karakatsoulis, K. Skouri & A.G. Lagodimos. (2024) EOQ with supply disruptions under different advance information regimes. Applied Mathematical Modelling 125, pages 772-788.
Crossref
V V Kukartsev, V S Tynchenko, E A Chzhan, V A Kukartsev, A A Boyko, A A Korneeva & V V Bukhtoyarov. (2019) Solving the problem of trucking optimization by automating the management process. Journal of Physics: Conference Series 1333:7, pages 072027.
Crossref
I. Konstantaras, K. Skouri & A.G. Lagodimos. (2019) EOQ with independent endogenous supply disruptions. Omega 83, pages 96-106.
Crossref
Z. Hammoudan, F.S. Ahmed, O. Grunder & A. El-Moudni. (2016) Multiple Customers/Transporters Integrated Scheduling Problem to Minimize the Total Cost. IFAC-PapersOnLine 49:12, pages 892-897.
Crossref
Weihua Liu, Xiaoyan Liu & Xiang Li. (2015) The two-stage batch ordering strategy of logistics service capacity with demand update. Transportation Research Part E: Logistics and Transportation Review 83, pages 65-89.
Crossref
Zakaria Hammoudan, Olivier Grunder, Toufik Boudouh & Abdellah El Moudni. (2014) A branch and bound algorithm for one supplier and multiple heterogeneous customers to solve a coordinated scheduling problem. A branch and bound algorithm for one supplier and multiple heterogeneous customers to solve a coordinated scheduling problem.
Singa Wang Chiu, Chien-Hua Lee, Yuan-Shyi Peter Chiu & Feng-Tsung Cheng. (2013) Intra-supply chain system with multiple sales locations and quality assurance. Expert Systems with Applications 40:7, pages 2669-2676.
Crossref
S. R. Singh & Diksha Bhatia. 2013. Optimizing, Innovating, and Capitalizing on Information Systems for Operations. Optimizing, Innovating, and Capitalizing on Information Systems for Operations
371
380
.
Aditya Shastri, S.R. Singh, Dharmendra Yadav & Shalley Gupta. (2013) Multi-Echelon Supply Chain Management for Deteriorating items with Partial Backordering under Inflationary Environment. Procedia Technology 10, pages 320-329.
Crossref
Brojeswar Pal, Shib Sankar Sana & Kripasindhu Chaudhuri. (2012) A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption. Economic Modelling 29:5, pages 1891-1898.
Crossref
S.R. Singh & Diksha Bhatia. (2011) An Integrated Vendor - Buyer Model with Uncertain Lead Time, Life Time under Inflation and Variable Holding Cost. International Journal of Operations Research and Information Systems 2:4, pages 87-98.
Crossref
S. R. Singh & Diksha Bhatia. (2011) An Integrated Vendor-Buyer Model with Uncertain Lead Time, Life Time under Inflation and Variable Holding Cost. International Journal of Operations Research and Information Systems 2:3, pages 54-63.
Crossref
Bhaba R. Sarker & Ahmad Diponegoro. (2009) Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers. European Journal of Operational Research 194:3, pages 753-773.
Crossref
Tiesong Shen, Xunzhi Lu & Bingshan Wu. (2009) Optimal Policy for Manufacturer in a Supply Chain with Stochastic Demand. Optimal Policy for Manufacturer in a Supply Chain with Stochastic Demand.
Chun Jen Chung & Hui Ming Wee. (2007) Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives. European Journal of Operational Research 183:2, pages 933-943.
Crossref
Yunmei Fang & Yueh-Jaw Lin. (2006) A Class of Optimal Operation Planning for Kanban Managed Multi-Stage Production System. A Class of Optimal Operation Planning for Kanban Managed Multi-Stage Production System.
Taebok Kim, Yushin Hong & Soo Young Chang. (2006) Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system. International Journal of Production Economics 103:1, pages 199-208.
Crossref
Ahmad Diponegoro & Bhaba R. Sarker. (2006) Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries. Computers & Operations Research 33:8, pages 2387-2404.
Crossref
Shaojun Wang & Bhaba R. Sarker. (2006) Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy. European Journal of Operational Research 172:1, pages 179-200.
Crossref
Shaojun Wang & Bhaba R. Sarker. (2005) An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy. European Journal of Operational Research 162:1, pages 153-172.
Crossref
Ding-zhong Feng & M. Yamashiro. (2004) Operations planning for a two-stage production system under lumpy demand. Operations planning for a two-stage production system under lumpy demand.
Hsin Rau, Mei-Ying Wu & Hui-Ming Wee. (2003) Integrated inventory model for deteriorating items under a multi-echelon supply chain environment. International Journal of Production Economics 86:2, pages 155-168.
Crossref
Ding-Zhong Feng, M. Yamashiro & Li-Bin Zhang. (2003) Optimal ordering and production policy for a two-stage production delivery system under lumpy demand. Optimal ordering and production policy for a two-stage production delivery system under lumpy demand.
Ding-Zhong Feng & M. Yamashiro. (2003) Operations planning for a volume-flexibility manufacturer in a supply chain system under lumpy demand. Operations planning for a volume-flexibility manufacturer in a supply chain system under lumpy demand.
Ahmad Diponegoro & Bhaba R. Sarker. (2002) Determining manufacturing batch sizes for a lumpy delivery system with trend demand. International Journal of Production Economics 77:2, pages 131-143.
Crossref
Gangyan Xu. (2021) Closed-form solution for lot-sizing problem in manufacturing systems with imperfect matching. SSRN Electronic Journal.
Crossref