348
Views
8
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Robust production control policy for a single machine and single part-type manufacturing system with inaccurate observation of production surplus

&
Pages 1061-1082 | Received 01 Dec 2010, Accepted 01 Feb 2012, Published online: 12 Sep 2012

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Ming Li & Zheng Wang. (2018) An integrated robust replenishment/production/distribution policy under inventory inaccuracy. International Journal of Production Research 56:12, pages 4115-4131.
Read now
Sadok Turki & Nidhal Rezg. (2018) Unreliable manufacturing supply chain optimisation based on an infinitesimal perturbation analysis. International Journal of Systems Science: Operations & Logistics 5:1, pages 25-44.
Read now
Felix T.S. Chan & Zheng Wang. (2014) Robust production control policy for a multiple machines and multiple product-types manufacturing system with inventory inaccuracy. International Journal of Production Research 52:16, pages 4803-4819.
Read now

Articles from other publishers (5)

Zheng Wang, Felix T. S. Chan & Ming Li. (2018) A Robust Production Control Policy for Hedging Against Inventory Inaccuracy in a Multiple-Stage Production System With Time Delay. IEEE Transactions on Engineering Management 65:3, pages 474-486.
Crossref
Ming Li & Zheng Wang. (2017) An integrated replenishment and production control policy under inventory inaccuracy and time-delay. Computers & Operations Research 88, pages 137-149.
Crossref
Nan Li, Felix T. S. Chan, S. H. Chung & Ben Niu. (2015) The impact of non-stationary demand and forecasting on a failure-prone manufacturing system. The impact of non-stationary demand and forecasting on a failure-prone manufacturing system.
Zheng Wang & Felix T. S. Chan. (2015) A Robust Replenishment and Production Control Policy for a Single-Stage Production/Inventory System with Inventory Inaccuracy. IEEE Transactions on Systems, Man, and Cybernetics: Systems 45:2, pages 326-337.
Crossref
Zheng Wang & Felix T. S. Chan. (2013) A robust production control policy for a multiple-stage production system with inventory inaccuracy and time-delay. A robust production control policy for a multiple-stage production system with inventory inaccuracy and time-delay.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.