Hui Lu, Junxiong Qi, Jue Li, Yong Xie, Gangyan Xu & Hongwei Wang. (2020) Multi-agent based safety computational experiment system for shield tunneling projects. Engineering, Construction and Architectural Management 27:8, pages 1963-1991.
Crossref
Yong-kui Liu, Xue-song Zhang, Lin Zhang, Fei Tao & Li-hui Wang. (2019) A multi-agent architecture for scheduling in platform-based smart manufacturing systems. Frontiers of Information Technology & Electronic Engineering 20:11, pages 1465-1492.
Crossref
Zixuan Zheng, Jian Guo & Eberhard Gill. (2018) Distributed Agent-based Approaches for Multi-Satellite System Limited Coordination Problem. Distributed Agent-based Approaches for Multi-Satellite System Limited Coordination Problem.
Yongkui Liu, Lihui Wang, Yuquan Wang, Xi Vincent Wang & Lin Zhang. (2018) Multi-agent-based scheduling in cloud manufacturing with dynamic task arrivals. Procedia CIRP 72, pages 953-960.
Crossref
Yingfeng Zhang & Fei Tao. 2017. Optimization of Manufacturing Systems Using the Internet of Things. Optimization of Manufacturing Systems Using the Internet of Things
147
163
.
Rene Ramacher & Lars Mönch. (2016) An automated negotiation approach to solve single machine scheduling problems with interfering job sets. Computers & Industrial Engineering 99, pages 318-329.
Crossref
Chia-Yu Hsu, Bo-Ruei Kao, Van Lam Ho & K. Robert Lai. (2016) Agent-based fuzzy constraint-directed negotiation mechanism for distributed job shop scheduling. Engineering Applications of Artificial Intelligence 53, pages 140-154.
Crossref
Xiaomin Zhu, Kwang Mong Sim, Jianqing Jiang, Jianjiang Wang, Chao Chen & Zhong Liu. (2016) Agent-Based Dynamic Scheduling for Earth-Observing Tasks on Multiple Airships in Emergency. IEEE Systems Journal 10:2, pages 661-672.
Crossref
Fabian Lang, Andreas Fink & Tobias Brandt. (2016) Design of automated negotiation mechanisms for decentralized heterogeneous machine scheduling. European Journal of Operational Research 248:1, pages 192-203.
Crossref
F. Fruggiero, M. Fera, R. Iannone & A. Lambiase. (2015) Work control in balanced DRC systems supported by negotiation procedures between autonomous agents. IFAC-PapersOnLine 48:3, pages 733-740.
Crossref
Yingfeng Zhang, George Q. Huang, Shudong Sun & Teng Yang. (2014) Multi-agent based real-time production scheduling method for radio frequency identification enabled ubiquitous shopfloor environment. Computers & Industrial Engineering 76, pages 89-97.
Crossref
N. He, D.Z. Zhang & Q. Li. (2014) Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system. International Journal of Production Economics 149, pages 117-130.
Crossref
Dongni Li, Yan Wang, Guangxue Xiao & Jiafu Tang. (2013) Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes. Computers & Operations Research 40:5, pages 1207-1223.
Crossref
Jian Bai, Zu-ren Feng, Jing Li & Jian-ping Liu. (2010) A MAS Model for Spacecraft TT & C Resources Scheduling. A MAS Model for Spacecraft TT & C Resources Scheduling.
Yingfeng Zhang, George Huang, Ting Qu & Jun Hong. (2010) Agent-based real-time assembly line management for wireless job shop environment. Agent-based real-time assembly line management for wireless job shop environment.
Yingfeng Zhang, George Huang, T. Qu & Oscar Ho. 2010. Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology. Proceedings of the 6th CIRP-Sponsored International Conference on Digital Enterprise Technology
1709
1721
.
Feng Wang & Jie Lin. (2009) A Multi-Agent Architecture for Re-entrant Manufactuing Line. A Multi-Agent Architecture for Re-entrant Manufactuing Line.
Xiaohua Liu, Jie Lin & Feng Wang. (2009) Simulation System of Production Scheduling Multi-agent-Based. Simulation System of Production Scheduling Multi-agent-Based.
George Q. Huang, YingFeng Zhang, Q. Y. Dai, Oscar Ho & Frank J. Xu. 2009. Collaborative Design and Planning for Digital Manufacturing. Collaborative Design and Planning for Digital Manufacturing
341
364
.
K. Robert Lai, Bo-Ruei Kao & Yi-Yuan Chiang. (2008) Fuzzy constraint-directed negotiation mechanism as a framework for multi-agent scheduling. Fuzzy constraint-directed negotiation mechanism as a framework for multi-agent scheduling.
Ahmed El-Bouri, Subramaniam Balakrishnan & Neil Popplewell. (2008) Cooperative dispatching for minimizing mean flowtime in a dynamic flowshop. International Journal of Production Economics 113:2, pages 819-833.
Crossref
Srinivas & J A Harding. (2008) A data mining integrated architecture for shop floor control. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 222:5, pages 605-624.
Crossref
Esther Alvarez. (2007) Multi-plant production scheduling in SMEs. Robotics and Computer-Integrated Manufacturing 23:6, pages 608-613.
Crossref
Ning Liu, Mohamed A. Abdelrahman & Srini Ramaswamy. (2007) A Complete Multiagent Framework for Robust and Adaptable Dynamic Job Shop Scheduling. IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) 37:5, pages 904-916.
Crossref
K. Robert Lai, Menq-Wen Lin & Bo-Rue Kao. (2007) Modeling Distributed Scheduling via Fuzzy Constraint-Based Agent Negotiation. Modeling Distributed Scheduling via Fuzzy Constraint-Based Agent Negotiation.
K. Robert Lai, Menq-Wen Lin & Bo-Ruei Kao. 2007. Advanced Intelligent Computing Theories and Applications. With Aspects of Artificial Intelligence. Advanced Intelligent Computing Theories and Applications. With Aspects of Artificial Intelligence
682
692
.
T.N. Wong, C.W. Leung, K.L. Mak & R.Y.K. Fung. (2006) Dynamic shopfloor scheduling in multi-agent manufacturing systems. Expert Systems with Applications 31:3, pages 486-494.
Crossref
J.S.K. Lau, G.Q. Huang, K.L. Mak & L. Liang. (2006) Agent-based modeling of supply chains for distributed scheduling. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 36:5, pages 847-861.
Crossref
H.P. Tang & T.N. Wong. (2005) Reactive multi-agent system for assembly cell control. Robotics and Computer-Integrated Manufacturing 21:2, pages 87-98.
Crossref
Rahul Caprihan & Subhash Wadhwa. (2005) Scheduling of FMSs with information delays: A simulation study. International Journal of Flexible Manufacturing Systems 17:1, pages 39-65.
Crossref