21
Views
41
CrossRef citations to date
0
Altmetric
Original Articles

Annealing method for PCB assembly scheduling on two sequential machines

&
Pages 361-367 | Published online: 25 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (6)

Xinyu Sun, Xin-Na Geng & Feng Liu. (2021) Flow shop scheduling with general position weighted learning effects to minimise total weighted completion time. Journal of the Operational Research Society 72:12, pages 2674-2689.
Read now
Yuan-Po Chao, Shuenn-Ren Cheng, Cheng-Hsiung Shih, Kejian Yu, Peng-Hsiang Hsu, Hau Chen & Wen-Hsiang Wu. (2021) A hybrid heuristic for agent-based scheduling problem with an ordinal scale objective criterion. Journal of Information and Optimization Sciences 42:1, pages 109-134.
Read now
G. M. Komaki, Shaya Sheikh & Behnam Malakooti. (2019) Flow shop scheduling problems with assembly operations: a review and new trends. International Journal of Production Research 57:10, pages 2926-2955.
Read now
Wen-Hung Wu, Yunqiang Yin, T C E Cheng, Win-Chin Lin, Juei-Chao Chen, Shin-Yi Luo & Chin-Chia Wu. (2017) A combined approach for two-agent scheduling with sum-of-processing-times-based learning effect. Journal of the Operational Research Society 68:2, pages 111-120.
Read now
Wen-Hung Wu. (2014) Solving a two-agent single-machine learning scheduling problem. International Journal of Computer Integrated Manufacturing 27:1, pages 20-35.
Read now
M. GARETTI, C. LANZA & A. POZZETTI. (1994) An algorithm for the weekly production planning of flexible assembly systems. International Journal of Computer Integrated Manufacturing 7:4, pages 249-259.
Read now

Articles from other publishers (35)

Shuang Zhao. (2022) Scheduling jobs with general truncated learning effects including proportional setup times. Computational and Applied Mathematics 41:4.
Crossref
Jiang-Ping Huang, Quan-Ke Pan, Liang Gao & Ling Wang. (2021) An effective iterated greedy algorithm for PCBs grouping problem to minimize setup times. Applied Soft Computing 112, pages 107830.
Crossref
Jabir Mumtaz, Zailin Guan, Lei Yue, Zhengya Wang, Saif Ullah & Mudassar Rauf. (2019) Multi-Level Planning and Scheduling for Parallel PCB Assembly Lines Using Hybrid Spider Monkey Optimization Approach. IEEE Access 7, pages 18685-18700.
Crossref
Jan-Yee Kung, Jiahui Duan, Jianyou Xu, I-Hong Chung, Shuenn-Ren Cheng, Chin-Chia Wu & Win-Chin Lin. (2018) Metaheuristics for Order Scheduling Problem with Unequal Ready Times. Discrete Dynamics in Nature and Society 2018, pages 1-13.
Crossref
Jianyou Xu, Chin-Chia Wu, Yunqiang Yin, Chuanli Zhao, Yi-Tang Chiou & Win-Chin Lin. (2016) An order scheduling problem with position-based learning effect. Computers & Operations Research 74, pages 175-186.
Crossref
Shangchia Liu, Wen-Hsiang Wu, Chao-Chung Kang, Win-Chin Lin & Zhenmin Cheng. (2015) A Single-Machine Two-Agent Scheduling Problem by a Branch-and-Bound and Three Simulated Annealing Algorithms. Discrete Dynamics in Nature and Society 2015, pages 1-8.
Crossref
Wen-Chiung Lee, Wei-Chang Yeh & Yu-Hsiang Chung. (2014) Total tardiness minimization in permutation flowshop with deterioration consideration. Applied Mathematical Modelling 38:13, pages 3081-3092.
Crossref
Kunjung Lai, Peng-Hsiang Hsu, Ping-Ho Ting & Chin-Chia Wu. (2014) A Truncated Sum of Processing-Times-Based Learning Model for a Two-Machine Flowshop Scheduling Problem. Human Factors and Ergonomics in Manufacturing & Service Industries 24:2, pages 152-160.
Crossref
Wen-Chiung Lee, Yau-Ren Shiau, Yu-Hsiang Chung & Lawson Ding. (2014) Single-Machine Scheduling to Minimize Total Completion Time and Tardiness with Two Competing Agents. The Scientific World Journal 2014, pages 1-9.
Crossref
Wen-Hung Wu, Yunqiang Yin, Wen-Hsiang Wu, Chin-Chia Wu & Peng-Hsiang Hsu. (2013) A time-dependent scheduling problem to minimize the sum of the total weighted tardiness among two agents. Journal of Industrial and Management Optimization 10:2, pages 591-611.
Crossref
Wen-Chiung Lee, Yu-Hsiang Chung & Zong-Ren Huang. (2013) A single-machine bi-criterion scheduling problem with two agents. Applied Mathematics and Computation 219:23, pages 10831-10841.
Crossref
Yunqiang Yin, Chin-Chia Wu, Wen-Hsiang Wu, Chou-Jung Hsu & Wen-Hung Wu. (2013) A branch-and-bound procedure for a single-machine earliness scheduling problem with two agents. Applied Soft Computing 13:2, pages 1042-1054.
Crossref
Der-Chiang Li & Peng-Hsiang Hsu. (2013) Competitive Two-Agent Scheduling with Learning Effect and Release Times on a Single Machine. Mathematical Problems in Engineering 2013, pages 1-9.
Crossref
Wen-Hsiang Wu. (2013) A Two-Agent Single-Machine Scheduling Problem with Learning and Deteriorating Considerations. Mathematical Problems in Engineering 2013, pages 1-18.
Crossref
Wen-Chiung Lee & Yu-Hsiang Chung. (2013) Permutation flowshop scheduling to minimize the total tardiness with learning effects. International Journal of Production Economics 141:1, pages 327-334.
Crossref
T.C.E. Cheng, Yu-Hsiang Chung, Shan-Ci Liao & Wen-Chiung Lee. (2013) Two-agent singe-machine scheduling with release times to minimize the total weighted completion time. Computers & Operations Research 40:1, pages 353-361.
Crossref
Ancău Mircea. (2012) Main aspects concerning PCB manufacturing optimization. Circuit World 38:2, pages 75-82.
Crossref
Atef Afifi Afifi, Wasim Ahmed Khan & David R. Hayhurst. (2011) Adaptation of the simulated annealing optimization algorithm to achieve improved near-optimum objective function values and computation times for multiple component manufacture. The International Journal of Advanced Manufacturing Technology 60:5-8, pages 437-451.
Crossref
Der-Chiang Li, Peng-Hsiang Hsu, Chin-Chia Wu & T.C.E. Cheng. (2011) Two-machine flowshop scheduling with truncated learning to minimize the total completion time. Computers & Industrial Engineering 61:3, pages 655-662.
Crossref
Chin-Chia Wu, Hung-Ming Chen, Shuenn-Ren Cheng, Chou-Jung Hsu & Wen-Hung Wu. (2011) Simulated annealing approach for the single-machine total late work scheduling problem with a position-based learning. Simulated annealing approach for the single-machine total late work scheduling problem with a position-based learning.
T.C.E. Cheng, Wen-Hsiang Wu, Shuenn-Ren Cheng & Chin-Chia Wu. (2011) Two-agent scheduling with position-based deteriorating jobs and learning effects. Applied Mathematics and Computation 217:21, pages 8804-8824.
Crossref
Chin-Chia Wu, Peng-Hsiang Hsu, Juei-Chao Chen, Nae-Sheng Wang & Wen-Hung Wu. (2010) Branch-and-bound and simulated annealing algorithms for a total weighted completion time scheduling with ready times and learning effect. The International Journal of Advanced Manufacturing Technology 55:1-4, pages 341-353.
Crossref
T.C.E. Cheng, Shuenn-Ren Cheng, Wen-Hung Wu, Peng-Hsiang Hsu & Chin-Chia Wu. (2011) A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations. Computers & Industrial Engineering 60:4, pages 534-541.
Crossref
Chin-Chia Wu, Peng-Hsiang Hsu & Kunjung Lai. (2011) Simulated-annealing heuristics for the single-machine scheduling problem with learning and unequal job release times. Journal of Manufacturing Systems 30:1, pages 54-62.
Crossref
Wen-Chiung Lee, Shiuan-Kang Chen, Cheng-Wei Chen & Chin-Chia Wu. (2011) A two-machine flowshop problem with two agents. Computers & Operations Research 38:1, pages 98-104.
Crossref
Wen-Chiung Lee, Shiuan-kang Chen & Chin-Chia Wu. (2010) Branch-and-bound and simulated annealing algorithms for a two-agent scheduling problem. Expert Systems with Applications 37:9, pages 6594-6601.
Crossref
Chin-Chia Wu, Yau-Ren Shiau, Ling-Huei Lee & Wen-Chiung Lee. (2009) Scheduling deteriorating jobs to minimize the makespan on a single machine. The International Journal of Advanced Manufacturing Technology 44:11-12, pages 1230-1236.
Crossref
Yau-Ren Shiau, Wen-Chiung Lee, Chin-Chia Wu & Chia-Ming Chang. (2006) Two-machine flowshop scheduling to minimize mean flow time under simple linear deterioration. The International Journal of Advanced Manufacturing Technology 34:7-8, pages 774-782.
Crossref
Chin-Chia Wu, Wen-Chiung Lee & Tsung Chen. (2007) Heuristic algorithms for solving the maximum lateness scheduling problem with learning considerations. Computers & Industrial Engineering 52:1, pages 124-132.
Crossref
Nguyen Van Hop & Nagendra N. Nagarur. (2004) The scheduling problem of PCBs for multiple non-identical parallel machines. European Journal of Operational Research 158:3, pages 577-594.
Crossref
Godfrey C. Onwubolu & B. V. BabuNguyen Van Hop & Mario T. Tabucanon. 2004. New Optimization Techniques in Engineering. New Optimization Techniques in Engineering 385 409 .
Z. H. JIN, K. OHNO, T. ITO & S. E. ELMAGHRABY. (2009) SCHEDULING HYBRID FLOWSHOPS IN PRINTED CIRCUIT BOARD ASSEMBLY LINES*. Production and Operations Management 11:2, pages 216-230.
Crossref
K. Raj Kumar & T.T. Narendran. (1997) A heuristic for sequencing PCBs with due‐dates. International Journal of Operations & Production Management 17:5, pages 446-467.
Crossref
Ibrahim H. Osman & Gilbert Laporte. (1996) Metaheuristics: A bibliography. Annals of Operations Research 63:5, pages 511-623.
Crossref
M. Ben-Daya & M. Al-Fawzan. (1996) A simulated annealing approach for the one-machine mean tardiness scheduling problem. European Journal of Operational Research 93:1, pages 61-67.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.