Thomas Hanne & Rolf DornbergerThomas Hanne & Rolf Dornberger. 2023. Computational Intelligence in Logistik und Supply Chain Management. Computational Intelligence in Logistik und Supply Chain Management
107
128
.
Khalil Tliba, Olivia Penas, Thierno M. L Diallo, Romdhane Ben Khalifa, Noureddine Ben Yahia & Jean-Yves Choley. (2020) Model Based Systems Engineering approach for the improvement of manufacturing system flexibility. Model Based Systems Engineering approach for the improvement of manufacturing system flexibility.
Valery Dyadichev, Sergey Stoyanchenko & Aleksandr Dyadichev. (2020) Mathematical Model for Traffic Optimization in Flexible Manufacturing Systems. Mathematical Model for Traffic Optimization in Flexible Manufacturing Systems.
Jairo Roa, Jose-Fernando Jimenez & Gabriel Zambrano-Rey. (2019) Directive Mode for the Semi-Heterarchical Control Architecture of a Flexible Manufacturing system. IFAC-PapersOnLine 52:10, pages 19-24.
Crossref
A. Alex Ellery. (2017) Space Exploration Through Self-Replication Technology Compensates for Discounting in Net Present Value Cost-Benefit Analysis: A Business Case?. New Space 5:3, pages 141-154.
Crossref
Adamu I. Abubakar, Elbara Eldaw Elnour Mohamed & Akram M. Zeki. (2017) The Dynamics of Data Packet in Transmission Session. IEEE Access 5, pages 4329-4339.
Crossref
Thomas Hanne & Rolf DornbergerThomas Hanne & Rolf Dornberger. 2017. Computational Intelligence in Logistics and Supply Chain Management. Computational Intelligence in Logistics and Supply Chain Management
99
119
.
Daria Terekhov, Douglas G. Down & J. Christopher Beck. (2014) Queueing-theoretic approaches for dynamic scheduling: A survey. Surveys in Operations Research and Management Science 19:2, pages 105-129.
Crossref
Shahla Paslar, M.K.A. Ariffin, Mehran Tamjidy & Sai Hong Tang. (2014) Mathematical Programming Models for Flexible Manufacturing System Planning and Scheduling Problem. Applied Mechanics and Materials 548-549, pages 1483-1487.
Crossref
Qiaoli Zhuang & Wenzhan Dai. (2014) A Fast Method for Extracting all Minimal Siphons from Maximal Unmarked Siphons of a Petri Net. Journal of Software 9:3.
Crossref
Nur Izzah Azhar, Umi Kalsom Yusof & Mohd Nor Akmal Khalid. (2013) Preventive maintenance scheduling optimization in semiconductor assembly industry using harmony search algorithm. Preventive maintenance scheduling optimization in semiconductor assembly industry using harmony search algorithm.
Rahul Caprihan, Ashok Kumar & Kathryn E. Stecke. (2013) Evaluation of the impact of information delays on flexible manufacturing systems performance in dynamic scheduling environments. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 311-338.
Crossref
Ye Xu, Ling Wang & Shengyao Wang. (2013) An effective shuffled frog-leaping algorithm for the flexible job-shop scheduling problem. An effective shuffled frog-leaping algorithm for the flexible job-shop scheduling problem.
Mohd Nor Akmal Khalid, Umi Kalsom Yusof & Maziani Sabudin. (2012) Solving flexible manufacturing system distributed scheduling problem subject to maintenance using harmony search algorithm. Solving flexible manufacturing system distributed scheduling problem subject to maintenance using harmony search algorithm.
ZhiWu Li, NaiQi Wu & MengChu Zhou. (2012) Deadlock Control of Automated Manufacturing Systems Based on Petri Nets—A Literature Review. IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews) 42:4, pages 437-462.
Crossref
Ahmed Hassam, Nassima Keddari, Farida Ain Sebaa & Zaki Sari. (2011) Comparative study between methods for selection alternative routings in real time. Comparative study between methods for selection alternative routings in real time.
I. Mahdavi & B. Shirazi. (2010) A Review of Simulation-based Intelligent Decision Support System Architecture for the Adaptive Control of Flexible Manufacturing Systems. Journal of Artificial Intelligence 3:4, pages 201-219.
Crossref
Babak Shirazi, Iraj Mahdavi & Maghsud Solimanpur. (2010) Development of a Simulation-Based Intelligent Decision Support System for the Adaptive Real-Time Control of Flexible Manufacturing Systems. Journal of Software Engineering and Applications 03:07, pages 661-673.
Crossref
M. Souier, A. Hassam & Z. Sari. 2010. Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management. Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management
221
248
.
T. Yoo, H.-B. Cho & E. Yücesan. 2010. Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management. Artificial Intelligence Techniques for Networked Manufacturing Enterprises Management
341
365
.
J. Slomp, R. Caprihan & J.A.C. Bokhorst. (2009) Controlling flow time delays in Flexible Manufacturing Cells. Controlling flow time delays in Flexible Manufacturing Cells.
Orides Morandin Jr.Edilson R. R. Kato, Flavio A. Montoro & Veronica Oliveira de Carvalho. (2008) A Production Sequencing Model for a Decision Support System. A Production Sequencing Model for a Decision Support System.
Chun Wang, Kewei Li, Hamada Ghenniwa, Weiming Shen & Ying Wang. 2007. Collaborative Product Design and Manufacturing Methodologies and Applications. Collaborative Product Design and Manufacturing Methodologies and Applications
175
199
.
N. Nagarjuna, O. Mahesh & K. Rajagopal. (2006) A heuristic based on multi-stage programming approach for machine-loading problem in a flexible manufacturing system. Robotics and Computer-Integrated Manufacturing 22:4, pages 342-352.
Crossref
Sidhartha R. Das & Cem Canel. (2005) An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system. International Journal of Production Economics 97:3, pages 247-262.
Crossref
Chun Wang, H. Ghenniwa & Weiming Shen. (2005) Heuristic scheduling algorithm for flexible manufacturing systems with partially overlapping machine capabilities. Heuristic scheduling algorithm for flexible manufacturing systems with partially overlapping machine capabilities.
Rahul Caprihan & Subhash Wadhwa. (2005) Scheduling of FMSs with information delays: A simulation study. International Journal of Flexible Manufacturing Systems 17:1, pages 39-65.
Crossref
Rahul Swarnkar & M.K. Tiwari. (2004) Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach. Robotics and Computer-Integrated Manufacturing 20:3, pages 199-209.
Crossref
Taejong Yoo, Daehong Kim & Hyunbo Cho. (2004) A New Approch to Multi-Pass Scheduling in Shop Floor Control. A New Approch to Multi-Pass Scheduling in Shop Floor Control.
F T S Chan. (2016) Evaluation of combined dispatching and routeing strategies for a flexible manufacturing system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 216:7, pages 1033-1046.
Crossref
A. Reyes, H. Yu, G. Kelleher & S. Lloyd. (2002) Integrating Petri Nets and hybrid heuristic search for the scheduling of FMS. Computers in Industry 47:1, pages 123-138.
Crossref
Hoda A. ElMaraghy & Tarek Y. ElMekkawy. (2002) Deadlock-free Rescheduling in Flexible Manufacturing Systems. CIRP Annals 51:1, pages 371-374.
Crossref
Claudine Tacquard & Patrick Martineau. (2001) Automatic notation of the physical structure of a flexible manufacturing system. International Journal of Production Economics 74:1-3, pages 279-292.
Crossref
Phillip S. DunstonLeonhard E. Bernold. (2000) Adaptive Control for Safe and Quality Rebar Fabrication. Journal of Construction Engineering and Management 126:2, pages 122-129.
Crossref
C Gertosio, N Mebarki & A Dussauchoy. (2000) Modeling and simulation of the control framework on a flexible manufacturing system. International Journal of Production Economics 64:1-3, pages 285-293.
Crossref
Bor-Yuh Leu & Fu-Kwun Wang. (1999) A simulation study of sequencing heuristics in a cellular flexible assembly system with hybrid order shipment environments. Simulation Practice and Theory 7:1, pages 31-46.
Crossref
Guilherme E. Vieira & João C.E. Ferreira. (1998) Didactic Integration, Control, and Implementation of Flexible Manufacturing Cells. IFAC Proceedings Volumes 31:31, pages 67-72.
Crossref
George Vosniakos & Poh-Lee Tng. (1997) A training software tool for job shop scheduling. The International Journal of Advanced Manufacturing Technology 13:6, pages 443-452.
Crossref
James T Lin & Chia-Chu Lee. (1997) A Petri net-based integrated control and scheduling scheme for flexible manufacturing cells. Computer Integrated Manufacturing Systems 10:2, pages 109-122.
Crossref
Chetan S. Shukla & F. Frank Chen. (1996) The state of the art in intelligent real-time FMS control: a comprehensive survey. Journal of Intelligent Manufacturing 7:6, pages 441-455.
Crossref
C.M. Harmonosky. (1995) Simulation-based real-time scheduling: review of recent developments. Simulation-based real-time scheduling: review of recent developments.