Publication Cover
Production Planning & Control
The Management of Operations
Volume 13, 2002 - Issue 3
100
Views
16
CrossRef citations to date
0
Altmetric
Original Articles

An efficient scheduling algorithm for the hot coil making in the steel mini-mill

Pages 298-306 | Published online: 15 Nov 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (1)

Ik-Soon Kwak & In-Jae Jeong. (2011) A hierarchical approach for the capacitated lot-sizing and scheduling problem with a special structure of sequence-dependent setups. International Journal of Production Research 49:24, pages 7425-7439.
Read now

Articles from other publishers (15)

Qing Wang, Hehui Wang & Min Huang. (2022) Integrated Production Scheduling for Hot Rolling and Delivery with Time Windows. Integrated Production Scheduling for Hot Rolling and Delivery with Time Windows.
Daniel Christopher Merten, Marc-Thorsten Hütt & Yilmaz Uygun. (2022) A network analysis of decision strategies of human experts in steel manufacturing. Computers & Industrial Engineering 168, pages 108120.
Crossref
Atilla Özgür, Yilmaz Uygun & Marc-Thorsten Hütt. (2021) A review of planning and scheduling methods for hot rolling mills in steel production. Computers & Industrial Engineering 151, pages 106606.
Crossref
Quan-Ke Pan, Liang Gao & Ling Wang. (2019) A multi-objective hot-rolling scheduling problem in the compact strip production. Applied Mathematical Modelling 73, pages 327-348.
Crossref
Ravi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra & K. GaneshRavi Ramya, Chandrasekharan Rajendran, Hans Ziegler, Sanjay Mohapatra & K. Ganesh. 2019. Capacitated Lot Sizing Problems in Process Industries. Capacitated Lot Sizing Problems in Process Industries 131 182 .
Ren-Jie Zhao, Jian-Xun Fu, Yan-Xin Wu, Ye-Jin Yang, Yu-Yuan Zhu & Ming Zhang. (2015) Representative Technologies for Hot Charging and Direct Rolling in Global Steel Industry. ISIJ International 55:9, pages 1816-1821.
Crossref
Maqsood Ahmad Sandhu, Petri Helo & Yohanes Kristianto. (2013) Steel supply chain management by simulation modelling. Benchmarking: An International Journal 20:1, pages 45-61.
Crossref
Sachin Mujawar, Simin Huang & Rakesh Nagi. (2012) Scheduling to minimize stringer utilization for continuous annealing operations. Omega 40:4, pages 437-444.
Crossref
Farhad Anvari & Rodger Edwards. (2011) Maintenance engineering in capital‐intensive manufacturing systems. Journal of Quality in Maintenance Engineering 17:4, pages 351-370.
Crossref
Farhad Anvari & Rodger Edwards. (2011) Performance measurement based on a total quality approach. International Journal of Productivity and Performance Management 60:5, pages 512-528.
Crossref
Abdelhakim Artiba, Valerie Dhaevers, David Duvivier & Salah E. Elmaghraby. 2011. Planning Production and Inventories in the Extended Enterprise. Planning Production and Inventories in the Extended Enterprise 489 530 .
Dongfen Guo, Fuliang Li & Tieke Li. (2009) Integrated batch planning model and algorithm for steelmaking-continuous Casting-hot Rolling. Integrated batch planning model and algorithm for steelmaking-continuous Casting-hot Rolling.
Vicente Valls Verdejo, M. Angeles Pérez Alarcó & M. Pilar Lino Sorlí. (2009) Scheduling in a continuous galvanizing line. Computers & Operations Research 36:1, pages 280-296.
Crossref
Patrik Appelqvist & Juha‐Matti Lehtonen. (2005) Combining optimisation and simulation for steel production scheduling. Journal of Manufacturing Technology Management 16:2, pages 197-210.
Crossref
Jonghan Kim, Deokhyun Seong, Sungwon Jung & Jinwoo Park. 2004. Advances in Case-Based Reasoning. Advances in Case-Based Reasoning 645 658 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.