Publication Cover
Production Planning & Control
The Management of Operations
Volume 13, 2002 - Issue 8
166
Views
17
CrossRef citations to date
0
Altmetric
Original Articles

Time-based goal chasing method for mixed-model assembly line problem with multiple work stations

, , &
Pages 735-745 | Published online: 14 Nov 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Emre Cevikcan & M. Bulent Durmusoglu. (2011) Minimising utility work and utility worker transfers for a mixed-model assembly line. International Journal of Production Research 49:24, pages 7293-7314.
Read now
Mesut Yavuz & Elif Akçali. (2007) Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches. International Journal of Production Research 45:16, pages 3579-3597.
Read now
X Zhao, X Zhao, JHY Yeung & J Xie. (2006) Sequence-to-customer goal with stochastic demands for a mixed-model assembly line. International Journal of Production Research 44:24, pages 5279-5305.
Read now
M. Caridi, R. Cigolini & V. Farina. (2006) Designing unbalanced paced lines: a conceptual model and an experimental campaign. Production Planning & Control 17:5, pages 464-479.
Read now

Articles from other publishers (12)

Yearnmin Kim & Won-Joon Choi. (2016) Sequencing the Mixed Model Assembly Line with Multiple Stations to Minimize the Total Utility Work and Idle Time. Industrial Engineering and Management Systems 15:1, pages 1-10.
Crossref
Fabian Bohnen, Matthias Buhl & Jochen Deuse. (2013) Systematic procedure for leveling of low volume and high mix production. CIRP Journal of Manufacturing Science and Technology 6:1, pages 53-58.
Crossref
Shusaku Hiraki, Zhuqi Xu & Shaolan Yang. 2013. LTLGB 2012. LTLGB 2012 481 487 .
S. Mohammad Seyedhosseini & Shahrooz Bamdad. (2011) Expanding product rate variation problem under stochastic environment. The International Journal of Advanced Manufacturing Technology 62:5-8, pages 655-667.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2009) Sequencing mixed-model assembly lines: Survey, classification and model critique. European Journal of Operational Research 192:2, pages 349-373.
Crossref
Wieslaw Kubiak & Mesut Yavuz. (2008) Just-in-Time Smoothing Through Batching. Manufacturing & Service Operations Management 10:3, pages 506-518.
Crossref
Deniz Türsel Eliiyi & Melih Özlen. (2008) A Lagrangean relaxation approach for the mixed-model flow line sequencing problem. Computers & Operations Research 35:3, pages 933-943.
Crossref
Xiaobo Zhao, Jianyong Liu, Katsuhisa Ohno & Shigenori Kotani. (2007) Modeling and analysis of a mixed‐model assembly line with stochastic operation times. Naval Research Logistics (NRL) 54:6, pages 681-691.
Crossref
D. Battini, M. Faccio, E. Ferrari, A. Persona & F. Sgarbossa. (2006) Design configuration for a mixed-model assembly system in case of low product demand. The International Journal of Advanced Manufacturing Technology 34:1-2, pages 188-200.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2007) Level-Scheduling bei Variantenfließfertigung: Klassifikation, Literaturüberblick und Modellkritik. Journal für Betriebswirtschaft 57:1, pages 37-66.
Crossref
Yakup Kara, Ugur Ozcan & Ahmet Peker. (2007) Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives. Applied Mathematics and Computation 184:2, pages 566-588.
Crossref
Hua-Ming Song. (2005) Co-Optimization of Level Schedules for Mixed-Model Assembly Line in just-in-time Production System. Co-Optimization of Level Schedules for Mixed-Model Assembly Line in just-in-time Production System.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.