202
Views
56
CrossRef citations to date
0
Altmetric
Original Articles

An integrated single-vendor single-buyer inventory system with shortage derived algebraically

&
Pages 555-561 | Published online: 04 Jun 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (13)

Sudip Adak & G. S. Mahapatra. (2022) Two-echelon imperfect production supply chain with probabilistic deterioration rework and reliability under fuzziness. Journal of Management Analytics 9:2, pages 287-311.
Read now
B R Sarker, R Rochanaluk & P J Egbelu. (2014) Improving service rate for a tree-type three-echelon supply chain system with backorders at retailer's level. Journal of the Operational Research Society 65:1, pages 57-72.
Read now
Huizhi Yi & Bhaba R. Sarker. (2013) An optimal consignment stock production and replenishment policy with controllable lead time. International Journal of Production Research 51:21, pages 6316-6335.
Read now
Liang-Yuh Ouyang, Li-Yuan Chen & Chih-Te Yang. (2013) Impacts of collaborative investment and inspection policies on the integrated inventory model with defective items. International Journal of Production Research 51:19, pages 5789-5802.
Read now
Kun-Jen Chung. (2012) On the validity of the arithmetic–geometric mean method to locate the optimal solution in a supply chain system. International Journal of Systems Science 43:8, pages 1454-1463.
Read now
Kuang-Hua Hsu, Yung-Fu Huang, Hsin-Fan Chen & Yu-Cheng Tu. (2011) Using easy methods to derive an integrated vendor-buyer inventory system under shortage allowed. Journal of Information and Optimization Sciences 32:5, pages 1059-1064.
Read now
Kun-Jen Chung & Shy-Der Lin. (2010) The evaluations among the three solution procedures to an integrated single-vendor single-buyer inventory systems with shortage. Journal of Information and Optimization Sciences 31:6, pages 1185-1188.
Read now
M.A. Hoque. (2009) An alternative optimal solution technique for a single-vendor single-buyer integrated production inventory model. International Journal of Production Research 47:15, pages 4063-4076.
Read now
Tsu-Pang Hsieh, Horng-Jinh Chang, Ming-Wei Weng & Chung-Yuan Dye. (2008) A simple approach to an integrated single-vendor single-buyer inventory system with shortage. Production Planning & Control 19:6, pages 601-604.
Read now
Kun-Jen Chung. (2008) An improvement of an integrated single-vendor single-buyer inventory model with shortage. Production Planning & Control 19:3, pages 275-277.
Read now
Kun-Jen Chung & Shy-Der Lin. (2008) The comparisons between the economic lot quantity with backorders derived algebraically and analytically. Journal of Statistics and Management Systems 11:1, pages 29-35.
Read now
Kun-Jen Chung & Shy-Der Lin. (2008) A note on how to compute economic order quantities with derivatives by cost comparisons. Journal of Information and Optimization Sciences 29:1, pages 29-35.
Read now

Articles from other publishers (43)

Maha Elarbi, Chaima Elwadi, Slim Bechikh, Zied Bahroun & Lamjed Ben Said. (2021) An Evolutionary Multi-objective Approach for Coordinating Supplier–Producer Conflict in Lot Sizing. International Journal of Information Technology & Decision Making 21:02, pages 541-575.
Crossref
Prerna Gautam, Aditi Khanna & Chandra K. Jaggi. (2021) An integrated green supply chain model with product recovery management towards a cleaner system. Journal of Cleaner Production 320, pages 128850.
Crossref
Sudip Adak & G.S. Mahapatra. (2021) Two-echelon imperfect production fuzzy supply chain model for reliability dependent demand with probabilistic deterioration and rework. Journal of Intelligent & Fuzzy Systems 41:2, pages 3833-3847.
Crossref
Beatriz Abdul-Jalbar, Roberto Dorta-Guerra, José M. Gutiérrez & Joaquín Sicilia. (2021) Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives. Mathematics 9:15, pages 1725.
Crossref
JiaLiang Pan, Chui-Yu Chiu, Kun-Shan Wu, Hsiu-Feng Yen & Yen-Wen Wang. (2020) Sustainable Production–Inventory Model in Technical Cooperation on Investment to Reduce Carbon Emissions. Processes 8:11, pages 1438.
Crossref
Aditi Khanna, Prerna Gautam, Biswajit Sarkar & Chandra K. Jaggi. (2020) Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO - Operations Research 54:2, pages 435-450.
Crossref
Prerna Gautam, Aakanksha Kishore, Aditi Khanna & Chandra K. Jaggi. (2019) Strategic defect management for a sustainable green supply chain. Journal of Cleaner Production 233, pages 226-241.
Crossref
Shen, Shen & Yang. (2019) A Production Inventory Model for Deteriorating Items with Collaborative Preservation Technology Investment Under Carbon Tax. Sustainability 11:18, pages 5027.
Crossref
Shima Teimoori, Seyedeh Fatemeh Attar & Seyed Hamid Reza Pasandideh. (2019) A New Hybrid Method for Optimizing Vendor-Managed Inventory Model. Journal of Advanced Manufacturing Systems 18:02, pages 255-272.
Crossref
Shilpi Pal & G.S. Mahapatra. (2017) A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages. Computers & Industrial Engineering 106, pages 299-314.
Crossref
Nikunja Mohan Modak, Shibaji Panda & Shib Sankar Sana. (2015) Two-echelon supply chain coordination among manufacturer and duopolies retailers with recycling facility. The International Journal of Advanced Manufacturing Technology 87:5-8, pages 1531-1546.
Crossref
Aditi Khanna, Prerna Gautam & Chandra K. Jaggi. Coordinating vendor-buyer decisions for imperfect quality items considering trade credit and fully backlogged shortages. Coordinating vendor-buyer decisions for imperfect quality items considering trade credit and fully backlogged shortages.
Bhaba R. Sarker, Ratkrit Rochanaluk, Huizhi Yi & Pius J. Egbelu. (2014) An operational policy for a three-stage distributive supply chain system with retailers’ backorders. International Journal of Production Economics 156, pages 332-345.
Crossref
Brojeswar Pal, Shib Sankar Sana & Kripasindhu Chaudhuri. (2014) A multi-echelon production–inventory system with supply disruption. Journal of Manufacturing Systems 33:2, pages 262-276.
Crossref
Chao-Tang Tseng, Mei-Fang Wu, Hong-Dar Lin & Yuan-Shyi Peter Chiu. (2014) Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach. Economic Modelling 36, pages 30-36.
Crossref
Mohsen S. Sajadieh, Mohammad Saber Fallahnezhad & Maryam Khosravi. (2013) A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system. International Journal of Production Economics 146:2, pages 738-744.
Crossref
Jia-Tzer Hsu & Lie-Fern Hsu. (2013) An integrated vendor–buyer inventory model with imperfect items and planned back orders. The International Journal of Advanced Manufacturing Technology 68:9-12, pages 2121-2132.
Crossref
Hong-Dar Lin, Fan-Yun Pai & Singa Wang Chiu. (2013) A note on “intra-supply chain system with multiple sales locations and quality assurance”. Expert Systems with Applications 40:11, pages 4730-4732.
Crossref
Singa Wang Chiu, Fan-Yun Pai & Wen Kuei Wu. (2013) Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework. Economic Modelling 35, pages 593-596.
Crossref
Stanisław Bylka. (2013) Non-cooperative consignment stock strategies for management in supply chain. International Journal of Production Economics 143:2, pages 424-433.
Crossref
Jia-Tzer Hsu & Lie-Fern Hsu. (2012) An integrated vendor–buyer cooperative inventory model in an imperfect production process with shortage backordering. The International Journal of Advanced Manufacturing Technology 65:1-4, pages 493-505.
Crossref
Jia-Tzer Hsu & Lie-Fern Hsu. (2012) An Integrated Vendor-Buyer Cooperative Inventory Model for Items with Imperfect Quality and Shortage Backordering. Advances in Decision Sciences 2012, pages 1-19.
Crossref
Christoph H. Glock. (2012) The joint economic lot size problem: A review. International Journal of Production Economics 135:2, pages 671-686.
Crossref
Kit Nam Francis Leung. (2011) A supplement to “A generalized algebraic model for optimizing inventory decisions in a centralized or decentralized multi-stage multi-firm supply chain”. Transportation Research Part E: Logistics and Transportation Review 47:5, pages 778-790.
Crossref
Leopoldo Eduardo Cárdenas-Barrón. (2011) The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra. Applied Mathematical Modelling 35:5, pages 2394-2407.
Crossref
Shih-Wei Lin, Yu-Wen Wou & Peterson Julian. (2011) Note on minimax distribution free procedure for integrated inventory model with defective goods and stochastic lead time demand. Applied Mathematical Modelling 35:5, pages 2087-2093.
Crossref
Kaur Arshinder, Arun Kanda & S. G. Deshmukh. 2011. Supply Chain Coordination under Uncertainty. Supply Chain Coordination under Uncertainty 39 82 .
Kit Nam Francis Leung. (2010) A generalized algebraic model for optimizing inventory decisions in a centralized or decentralized multi-stage multi-firm supply chain. Transportation Research Part E: Logistics and Transportation Review 46:6, pages 896-912.
Crossref
Mohsen S. Sajadieh, Anders Thorstenson & Mohammad R. Akbari Jokar. (2010) An integrated vendor–buyer model with stock-dependent demand. Transportation Research Part E: Logistics and Transportation Review 46:6, pages 963-974.
Crossref
Kit-Nam Francis Leung. (2010) Some comments on “A simple method to compute economic order quantities”. European Journal of Operational Research 201:3, pages 960-961.
Crossref
Kit Nam Francis Leung. (2010) An integrated production-inventory system in a multi-stage multi-firm supply chain. Transportation Research Part E: Logistics and Transportation Review 46:1, pages 32-48.
Crossref
Jinn-Tsair Teng. (2009) A simple method to compute economic order quantities. European Journal of Operational Research 198:1, pages 351-353.
Crossref
Mohsen S. Sajadieh, Mohammad R. Akbari Jokar & Mohammad Modarres. (2009) Developing a coordinated vendor–buyer model in two-stage supply chains with stochastic lead-times. Computers & Operations Research 36:8, pages 2484-2489.
Crossref
Mohsen S. Sajadieh & Mohammad R. Akbari Jokar. (2009) Optimizing shipment, ordering and pricing policies in a two-stage supply chain with price-sensitive demand. Transportation Research Part E: Logistics and Transportation Review 45:4, pages 564-571.
Crossref
Kit-Nam Francis Leung. (2009) Pedagogical Comments on "An Integrated Single-Vendor Single-Buyer Inventory System with Shortage Derived Algebraically". Pedagogical Comments on "An Integrated Single-Vendor Single-Buyer Inventory System with Shortage Derived Algebraically".
Fang-Kuo Wang & Kun-Shan Wu. (2009) Using the Complete Squares Method to Analysis the Global Optimal Policy for Vendor-Buyer Integrated Inventory System Within Just in Time Environment. Journal of Applied Sciences 9:6, pages 1194-1197.
Crossref
Arshinder, Arun Kanda & S.G. Deshmukh. (2008) Supply chain coordination: Perspectives, empirical studies and research directions. International Journal of Production Economics 115:2, pages 316-335.
Crossref
Leopoldo Eduardo Cárdenas-Barrón. (2007) Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note. Transportation Research Part E: Logistics and Transportation Review 43:5, pages 647-654.
Crossref
Robert W. Grubbström. (2007) Transform methodology applied to some inventory problemsDie Formulierung von Modellen der Lagerhaltungstheorie auf Basis der Laplace Transformation. Zeitschrift für Betriebswirtschaft 77:3, pages 297-324.
Crossref
Stefan Minner. (2007) A note on how to compute economic order quantities without derivatives by cost comparisons. International Journal of Production Economics 105:1, pages 293-296.
Crossref
Yung-Fu Huang. (2006) An inventory model under two levels of trade credit and limited storage space derived without derivatives. Applied Mathematical Modelling 30:5, pages 418-436.
Crossref
Maw-Liann Shyu, Yung-Fu Huang .Hung-Fu Huang .. (2006) Technical Note-An Integrated Single-vendor Single-buyer Inventory System with Shortage Derived Algebraically. Journal of Applied Sciences 6:7, pages 1628-1630.
Crossref
P. C. Yang, H. M. Wee & K. P. Wee. (2006) An integrated vendor–buyer inventory model with perfect and monopolistic competitions: an educational note. International Transactions in Operational Research 13:1, pages 75-83.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.