Alejandro Martín-Gómez, María Jesús Ávila-Gutiérrez & Francisco Aguayo-González. (2021) Holonic Reengineering to Foster Sustainable Cyber-Physical Systems Design in Cognitive Manufacturing. Applied Sciences 11:7, pages 2941.
Crossref
Johan Silvander, Krzysztof Wnuk & Mikael Svahnberg. (2020) Systematic literature review on intent‐driven systems. IET Software 14:4, pages 345-357.
Crossref
Patrick Pujo, Fouzia Ounnar, Damien Power & Selma Khader. (2016) Wireless Holon Network for job shop isoarchic control. Computers in Industry 83, pages 12-27.
Crossref
Robson M. da Silva, Paulo E. Miyagi & Diolino J. Santos Filho. 2011. Technological Innovation for Sustainability. Technological Innovation for Sustainability
367
374
.
Fuqing Zhao, Qiuyu Zhang & Aihong Zhu. (2008) An Order Settlement Method in Holonic Manufacturing System and Its Solution by EA Algorithm. An Order Settlement Method in Holonic Manufacturing System and Its Solution by EA Algorithm.
Shangxiong Sheng. (2008) Holonic Reconfiguration Model Based on Time Petri-Net and Its Solution Method. Holonic Reconfiguration Model Based on Time Petri-Net and Its Solution Method.
Ping Lou, Quan Liu, Zude Zhou & ShuHai Quan. (2008) Distributed production scheduling in an open manufacturing environment. Distributed production scheduling in an open manufacturing environment.
Fuqing Zhao, Qiuyu Zhang & Yahong Yang. (2007) Order Form Selection and Evaluation Model based on Particle Swarm Optimization(PSO) for Task Holon. Order Form Selection and Evaluation Model based on Particle Swarm Optimization(PSO) for Task Holon.
Fuqing Zhao, Yi Hong, Dongmei Yu, Yahong Yang, Qiuyu Zhang & Huawei Yi. (2006) A hybrid algorithm based on particle swarm optimization and simulated annealing to holon task allocation for holonic manufacturing system. The International Journal of Advanced Manufacturing Technology 32:9-10, pages 1021-1032.
Crossref
Paulo Sousa, Carlos Ramos & José Neves. 2007. Process Planning and Scheduling for Distributed Manufacturing. Process Planning and Scheduling for Distributed Manufacturing
167
190
.
Fuqing Zhao, Qiuyu Zhang & Yahong Yang. (2006) A Novel Task Allocation Problem Solution with PSO Algorithm for Holonic Manufacturing System. A Novel Task Allocation Problem Solution with PSO Algorithm for Holonic Manufacturing System.
J.S.K. Lau, G.Q. Huang, K.L. Mak & L. Liang. (2006) Agent-based modeling of supply chains for distributed scheduling. IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans 36:5, pages 847-861.
Crossref
Yahong YANG, Fuqing ZHAO, Yunping YAO & Aihong ZHU. (2006) A PSO and Simulated Annealing Hybrid Algorithm to Task Allocation Problem for Holonic Manufacturing System. A PSO and Simulated Annealing Hybrid Algorithm to Task Allocation Problem for Holonic Manufacturing System.
Yilmaz Uygun. (2016) A Multi-Agent-based Communication Prototype for Cross-Company Capacity Exchange in Manufacturing Networks. SSRN Electronic Journal.
Crossref
Yilmaz mname Uygun. (2014) A Multi-Agent-Based Communication Prototype for Cross-Company Capacity Exchange in Manufacturing Networks. SSRN Electronic Journal.
Crossref