Publication Cover
Production Planning & Control
The Management of Operations
Volume 17, 2006 - Issue 5
141
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

Designing unbalanced paced lines: a conceptual model and an experimental campaign

, &
Pages 464-479 | Published online: 21 Feb 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Moacir Godinho Filho & Reha Uzsoy. (2014) Assessing the impact of alternative continuous improvement programmes in a flow shop using system dynamics. International Journal of Production Research 52:10, pages 3014-3031.
Read now
Can B. Kalayci & Surendra M. Gupta. (2014) A tabu search algorithm for balancing a sequence-dependent disassembly line. Production Planning & Control 25:2, pages 149-160.
Read now
Seonmin Kim, James F. Cox & Victoria J. Mabin. (2010) An exploratory study of protective inventory in a re-entrant line with protective capacity. International Journal of Production Research 48:14, pages 4153-4178.
Read now
Nils Boysen, Malte Fliedner & Armin Scholl. (2009) Production planning of mixed-model assembly lines: overview and extensions. Production Planning & Control 20:5, pages 455-471.
Read now
Anthony L. Patti, Kevin Watson & John H. Blackstone$suffix/text()$suffix/text(). (2008) The shape of protective capacity in unbalanced production systems with unplanned machine downtime. Production Planning & Control 19:5, pages 486-494.
Read now

Articles from other publishers (7)

Rodrigo Romero-Silva, Sabry Shaaban, Erika Marsillac & Zouhair Laarraf. (2021) The impact of unequal processing time variability on reliable and unreliable merging line performance. International Journal of Production Economics 235, pages 108108.
Crossref
Moacir Godinho Filho & Marcel Heimar Ribeiro Utiyama. (2014) Comparing different strategies for the allocation of improvement programmes in a flow shop environment. The International Journal of Advanced Manufacturing Technology 77:5-8, pages 1365-1385.
Crossref
Filippo De Carlo, Maria Antonietta Arleo & Mario Tucci. (2014) OEE Evaluation of a Paced Assembly Line through Different Calculation and Simulation Methods: A Case Study in the Pharmaceutical Environment. International Journal of Engineering Business Management 6, pages 27.
Crossref
Sabry Shaaban, Tom McNamara & Sarah Hudson. (2013) The effects of unbalancing operation time variability on the performance of unreliable lines. Journal of Manufacturing Technology Management 24:3, pages 428-447.
Crossref
Can B. Kalayci & Surendra M. Gupta. (2013) Ant colony optimization for sequence‐dependent disassembly line balancing problem. Journal of Manufacturing Technology Management 24:3, pages 413-427.
Crossref
Ryspek Usubamatov, A. M. Ahmed Alwaise & Z. M. Zain. (2012) Productivity and optimization of section-based automated lines of parallel–serial structure with embedded buffers. The International Journal of Advanced Manufacturing Technology 65:5-8, pages 651-655.
Crossref
Sabry Shaaban & Sarah Hudson. (2011) Transient behaviour of unbalanced lines. Flexible Services and Manufacturing Journal 24:4, pages 575-602.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.